HousePrecheckCheck an address

433 Front St WHarbourfront-CityPlace, Toronto · City records before you offer

102.7 × 46.8 m4,498 m²on Front St W

2 things to check before you offer, including work or applications in progress
N20 m
102.7 m frontage46.8 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 433 Front St W

433 Front St W is on a 102.7 m by 46.8 m lot on Front St W in Harbourfront-CityPlace. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.

The City has 4 records on this lot since 2001. That is more than at 88% of Toronto houses. In 2022, a development application was filed: "Official plan and zoning by-law amendment application to permit development above the union station rail corridor between blue jays way and bathurst street…". Status: under review. In 2017, a development application was filed: "The proposal is to develop a rail corridor overbuild (deck) over the existing active rail corridor to accommodate development, while maintaining the rail…". Status: closed. In 2001, a Committee of Adjustment application was filed: "This property is a 0.4503 hectare parcel located at the southwest corner of front street west and spadina avenue, with a frontage of approximately 100 metres…". Status: closed. Nothing on file is open right now.

Within 300 m, 9 development applications are open (the tallest up to 72 storeys). Within 300 m, the Committee of Adjustment decided 7 minor variance applications in the last 10 years and approved 100%. St. Andrew station is a 15-minute walk.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Zoning not in By-law 569-2013Moderate
  • 9 development applications open within 300 mLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

4 records on file, more than at 88% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-09-10Building permit
25 223661
1 Wall Sign 1 Projecting SignCancelled
2022-05-03Development application
22 141536 STE 10 OZ
Official Plan and Zoning By-law Amendment application to permit development above the Union Station rail corridor between Blue Jays Way and Bathurst Street. The revised proposal includes 9 mixed-use towers ranging in height from 36 to 72-storeys, a new City park and publicly accessible open spaces. The proposed gross floor area (GFA) equals approximately 531,130 m2 of which 494,133 m2 would be residential GFA, comprised of 7,986 residential units and 37,000 m2 would be non-residential GFA, including retail, office, hotel and childcare uses.Under Review
2017-05-23Development application
17 164359 STE 20 OZ
The proposal is to develop a rail corridor overbuild (deck) over the existing active rail corridor to accommodate development, while maintaining the rail activities. The ORCA Project proposes a mixed-use and open space development, consisting of 10 buildings with a combined gross floor area (GFA) of 366,500 m2. The proposal includes the portion of the Rail Corridor bounded by Front Street West between Spadina and Bathurst; Blue Jays Way; Ice Boat Terrace; and Bathurst Street.Closed
2001-09-12Minor variance
A491/01TO
This property is a 0.4503 hectare parcel located at the southwest corner of Front Street West and Spadina Avenue, with a frontage of approximately 100 metres on Front Street West and 46 metres on Spadina Avenue. The majority of the subject lands is used for GO Transit storage yards, and also contains a hydro transformer station and a small building used by GO employees. In order to facilitate eventual redevelopment of the lands, the applicant is requesting exemption from those sections of the Railway Lands By-law which does not permit above grade parking, as any proposed building for the site must be built on a podium above the GO Transit storage yard.Approved
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Zoning not in By-law 569-2013
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N50 m
102.7 m frontage46.8 m deepon Front St W
Zone
—
Height limit
—
Corner lot
No
Public lane
None
House footprint
211 m²
Back yard
31 m
Buildings on the lot
3

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 9 development applications open within 300 m, up to 72 storeys
    • 7 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 9 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 6 of 8 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Harbourfront-CityPlace neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$90,000median $84,500
    Households that own their home40%median 54%
    Population (2021)28,135median 16,813
    Homes built in 1960 or before0%median 29%
    Homes needing major repairs2%median 7%

    Getting around and schools

    • St. Andrew StationNearest station15 min walk
    • Spadina Ave at Front St WestNearest TTC stop2 min walk
    • Northern Linear Park TrlNearest cycling route2 min walk
    • Jean Lumb Public SchoolSchool5 min walk
    • Bishop Macdonell Catholic ElementarySchool5 min walk
    • Alpha Alternative & Oasis AlternativeSchool8 min walk
    • City SchoolSchool11 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3883.3
    • Robberycity median 69.548.1
    • Homicidecity median 5.32.8
    • Shootingscity median 10.58.5
    • Auto theftcity median 192.656.6
    • Theft over $5,000city median 46.156.6
    • Break and entercity median 172.8141.6
    • Theft from vehiclescity median 188.1121.7

    More about Harbourfront-CityPlace

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 433 Front St W

    2 things to check at 433 Front St W before you offer

    • Work or applications in progressModerate
    • Zoning not in By-law 569-2013Moderate
    • 9 development applications open within 300 mLow
    • 1 Committee of Adjustment file on this lotLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 4 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.