Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 433 Front St W
433 Front St W is on a 102.7 m by 46.8 m lot on Front St W in Harbourfront-CityPlace. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.
The City has 4 records on this lot since 2001. That is more than at 88% of Toronto houses. In 2022, a development application was filed: "Official plan and zoning by-law amendment application to permit development above the union station rail corridor between blue jays way and bathurst street…". Status: under review. In 2017, a development application was filed: "The proposal is to develop a rail corridor overbuild (deck) over the existing active rail corridor to accommodate development, while maintaining the rail…". Status: closed. In 2001, a Committee of Adjustment application was filed: "This property is a 0.4503 hectare parcel located at the southwest corner of front street west and spadina avenue, with a frontage of approximately 100 metres…". Status: closed. Nothing on file is open right now.
Within 300 m, 9 development applications are open (the tallest up to 72 storeys). Within 300 m, the Committee of Adjustment decided 7 minor variance applications in the last 10 years and approved 100%. St. Andrew station is a 15-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Zoning not in By-law 569-2013Moderate
- 9 development applications open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
4 records on file, more than at 88% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-09-10 | Building permit25 223661 | 1 Wall Sign 1 Projecting Sign | Cancelled | |
| 2022-05-03 | Development application22 141536 STE 10 OZ | Official Plan and Zoning By-law Amendment application to permit development above the Union Station rail corridor between Blue Jays Way and Bathurst Street. The revised proposal includes 9 mixed-use towers ranging in height from 36 to 72-storeys, a new City park and publicly accessible open spaces. The proposed gross floor area (GFA) equals approximately 531,130 m2 of which 494,133 m2 would be residential GFA, comprised of 7,986 residential units and 37,000 m2 would be non-residential GFA, including retail, office, hotel and childcare uses. | Under Review | |
| 2017-05-23 | Development application17 164359 STE 20 OZ | The proposal is to develop a rail corridor overbuild (deck) over the existing active rail corridor to accommodate development, while maintaining the rail activities. The ORCA Project proposes a mixed-use and open space development, consisting of 10 buildings with a combined gross floor area (GFA) of 366,500 m2. The proposal includes the portion of the Rail Corridor bounded by Front Street West between Spadina and Bathurst; Blue Jays Way; Ice Boat Terrace; and Bathurst Street. | Closed | |
| 2001-09-12 | Minor varianceA491/01TO | This property is a 0.4503 hectare parcel located at the southwest corner of Front Street West and Spadina Avenue, with a frontage of approximately 100 metres on Front Street West and 46 metres on Spadina Avenue. The majority of the subject lands is used for GO Transit storage yards, and also contains a hydro transformer station and a small building used by GO employees. In order to facilitate eventual redevelopment of the lands, the applicant is requesting exemption from those sections of the Railway Lands By-law which does not permit above grade parking, as any proposed building for the site must be built on a podium above the GO Transit storage yard. | Approved |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 211 m²
- Back yard
- 31 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 9 development applications open within 300 m, up to 72 storeys
- 7 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
9 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 6 of 8 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Harbourfront-CityPlace neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St. Andrew StationNearest station15 min walk
- Spadina Ave at Front St WestNearest TTC stop2 min walk
- Northern Linear Park TrlNearest cycling route2 min walk
- Jean Lumb Public SchoolSchool5 min walk
- Bishop Macdonell Catholic ElementarySchool5 min walk
- Alpha Alternative & Oasis AlternativeSchool8 min walk
- City SchoolSchool11 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3883.3
- Robberycity median 69.548.1
- Homicidecity median 5.32.8
- Shootingscity median 10.58.5
- Auto theftcity median 192.656.6
- Theft over $5,000city median 46.156.6
- Break and entercity median 172.8141.6
- Theft from vehiclescity median 188.1121.7
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist