Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 417 Dundas St E
417 Dundas St E is on a 4.9 m by 26.3 m lot on Dundas St E in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(1915), changes some of the usual rules for this address. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.
The City has 10 records on this lot since 2016. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Revision # 2 - interior windows on third and mezzannine floors, floor opening between second and third floor. revision - alterations to rear doors; one…". Status: revision issued. In 2019, a Committee of Adjustment application was filed: "To alter the existing four-storey semi-detached building with a second, third and fourth floor dwelling unit, basement secondary suite, and ground floor…". Status: closed. In 2019, a building permit was filed: "Revision #03 - rconstruct basement walkout.rev02: revision to opening on the exterior walls.revision to structure and layout". Status: revision issued. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 2 development applications are open (the tallest up to 35 storeys). The nearest TTC stop is Dundas St East at Parliament St, a 1-minute walk.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2016ModerateFree check
- Heritage property: in a Heritage Conservation District (Part V)Moderate
- Work or applications in progressModerateFree check
- Records mention second unitModerateFree check
- Site-specific exception 900.11.10(1915)Moderate
- 2 development applications open within 300 mLowFree check
- Priority retail street: Dundas Street EastLow
- Downtown Plan Secondary PlanLow
- 3 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
4 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2016
- Work or applications in progress
- Records mention second unit
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2016
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
3 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-01-08 | Building permit19 259105 | Revision # 2 - interior windows on third and mezzannine floors, floor opening between second and third floor. REVISION - alterations to rear doors; one existing, 1 newProposal to convert the ground floor and basement to 1 dwelling unit and 2nd, 3rd, and 4th floor dwelling unit to remain (2 dwelling units in total) | Revision Issued | |
| 2019-09-26 | Minor varianceA0699/19TEY | To alter the existing four-storey semi-detached building with a second, third and fourth floor dwelling unit, basement secondary suite, and ground floor commercial use by converting the ground floor commercial and basement suite into a larger secondary suite with no commercial use. Minor variance decision A1075/16TEY permitted the third and fourth storey additions. Minor variance decision A0330/18TEY permitted the secondary suite and ground floor commercial. | Approved | |
| 2019-06-26 | Zoning review19 178523 ZZC | No description on file | Closed | |
| 2019-06-26 | Building permit17 178801 | Revision #03 - Rconstruct basement walkout.REV02: Revision to opening on the exterior walls.Revision to structure and layout. | Revision Issued | |
| 2018-09-20 | Minor varianceA0330/18TEY | To alter the existing four-storey semi-detached dwelling by creating a secondary suite in the basement and by converting the ground floor to commercial use, thereby creating a mixed-use building. Minor variance decision A1075/16TEY permitted third and fourth storey additions. | Approved | |
| 2018-02-28 | Zoning review18 122564 ZZC | No description on file | Cancelled | |
| 2018-02-28 | Zoning review18 122601 ZZC | No description on file | Closed | |
| 2017-02-15 | Minor varianceA1075/16TEY | To alter the existing 2½-storey semi-detached dwelling by constructing a rear third storey addition, a rear third storey balcony, a complete fourth storey addition, and a rear fourth storey balcony. | Approved | |
| 2016-08-08 | Zoning review16 202921 ZZC | No description on file | Closed | |
| 2016-07-20 | Building permit15 183323 | Revision # 02 - To extend the underpinning in the basement, new basement layout, enlarge opening in the south wall on the ground floor, and reduce the size of the 2nd floor window in the south wall.Revision to add basement walkout and structural revisions to the 2nd floor. | Revision Issued |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: in a Heritage Conservation District (Part V)
- Site-specific exception 900.11.10(1915)
- Priority retail street: Dundas Street East
What this part means for this house, in plain EnglishUnlock
Heritage property: in a Heritage Conservation District (Part V)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(1915)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Dundas Street East
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage Register
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1915)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: second unit
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 1.5 (c1.0; r1.0) SS2 (x1915)
- Height limit
- 12 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 75 m²
- Back yard
- 7 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 2 development applications open within 300 m, up to 35 storeys
- In the Moss Park station area
- 13 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
2 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Assault: 3.5 times the Toronto median
- Robbery: 2.4 times the Toronto median
- Break and enter: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Moss Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station19 min walk
- Dundas St East at Parliament StNearest TTC stop1 min walk
- Shuter StNearest cycling route4 min walk
- Lord Dufferin Jr & Sr Public SchoolSchool3 min walk
- Liberty Prep SchoolSchool8 min walk
- Ecole Elementaire Gabrielle RoySchool8 min walk
- Nelson Mandela Park Public SchoolSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32226.8
- Robberycity median 69.5166.6
- Homicidecity median 5.33.4
- Shootingscity median 10.53.4
- Auto theftcity median 192.681.6
- Theft over $5,000city median 46.164.6
- Break and entercity median 172.8350.2
- Theft from vehiclescity median 188.1275.4
Ready emails
Copy and send as they are.
6 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist