HousePrecheckCheck an address

40 Heath St WYonge-St.Clair, Toronto · City records before you offer

Residential · R (d0.6) (x905)13.1 × 44.2 m539 m²on Heath St W

2 things to check before you offer, including building permit open since 2024
N20 m
13.1 m frontage44.2 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 40 Heath St W

40 Heath St W is on a 13.1 m by 44.2 m lot on Heath St W in Yonge-St.Clair. The zoning is R. A site-specific exception, 900.2.10(905), changes some of the usual rules for this address.

The City has 12 records on this lot since 2014. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Proposal to construct a new 2 storey garden suite in the rear yard of an existing sfd-detached dwelling. see also 23 103419 zap and 23 123121 mv". Status: permit issued. In 2023, a Committee of Adjustment application was filed: "To construct a two-storey ancillary building (garden suite) in the rear yard". Status: closed. In 2015, a building permit was filed: "Proposal to demolish existing house and detached garage, and construct new 3-storey detached house with integral garage". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 8 development applications are open (the tallest up to 43 storeys). St. Clair station is a 5-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2024ModerateFree check
  • Records mention garden suiteModerateFree check
  • Site-specific exception 900.2.10(905)Moderate
  • 8 development applications open within 300 mLowFree check
  • 1 City tree in front of this lotLowFree check
  • Yonge-St. Clair Secondary PlanLow
  • 5 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 6 units

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2024
  • Records mention garden suite
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2024

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Records mention garden suite

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 5 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

12 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2024-01-03Building permit
23 213054
Proposal to construct a new 2 storey garden suite in the rear yard of an existing SFD-detached dwelling. See also 23 103419 ZAP and 23 123121 MV.Permit Issued
2023-05-31Minor variance
A0270/23TEY
To construct a two-storey ancillary building (garden suite) in the rear yard.Approved
2023-01-13Zoning review
23 103419 ZAP
No description on fileClosed
2015-06-25Building permit
15 155393
Proposal to demolish existing house and detached garage, and construct new 3-storey detached house with integral garageClosed
2015-06-16Building permit
15 155400
Proposal to demolish existing house and detached garage, and construct new 3 storey detached house with integral garageClosed
2015-01-14Minor variance
A1020/14TEY
To construct a new three-storey single detached dwelling with an integral garage.Approved
2014-10-02Zoning review
14 231182 ZZC
No description on fileClosed
2014-06-02Minor variance
A0555/14TEY
to be closed with partial refundPending
2014-06-02Minor variance
A0554/14TEY
to be closed with partial refundPending
2014-06-02Consent (lot split)
B0041/14TEY
to be closed with partial refundPending
2014-04-30Zoning review
14 149333 ZPR
No description on fileClosed
2014-04-30Zoning review
14 149324 ZPR
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(905)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(905)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Yonge-St. Clair Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(905)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Limited

Build potential

How much more the rules allow on this lot, beyond what is on record

  • On record: garden suite
  • Multiplex up to 6 units: likely fits
  • Secondary suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 6 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N20 m
13.1 m frontage44.2 m deepon Heath St W
Zone
R (d0.6) (x905)
Height limit
12 m
Corner lot
No
Public lane
None
New house permit
2015
House footprint
173 m²
Back yard
14.9 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

  • Multiplex up to 6 units

    Likely fits
  • Secondary suite

    Likely fits
  • Garden suite

    On record

    Already permitted: 23 213054 (permit issued).

  • Laneway suite

    Not possible

Why, measured on this lot, and the most you could buildUnlock

Busy

Building nearby

How much neighbours are building and applying to change within 300 m

  • 8 development applications open within 300 m, up to 43 storeys
  • In the St Clair station area
  • 3 suite and multiplex permits within 300 m in 10 years

What this part means for this house, in plain EnglishUnlock

  1. 8 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime below median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 5 of 6 categories
  • Break and enter: 2.2 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Yonge-St.Clair neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$94,000median $84,500
Households that own their home40%median 54%
Population (2021)12,905median 16,813
Homes built in 1960 or before45%median 29%
Homes needing major repairs5%median 7%

Getting around and schools

  • St. Clair StationNearest station5 min walk
  • Yonge St at Heath St WestNearest TTC stop2 min walk
  • Yonge StNearest cycling route2 min walk
  • The York School - Jr CampusSchool4 min walk
  • Deer Park Jr & Sr Public SchoolSchool7 min walk
  • Upper Canada College SchoolSchool8 min walk
  • The Linden SchoolSchool8 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3270.8
  • Robberycity median 69.525.8
  • Auto theftcity median 192.664.5
  • Theft over $5,000city median 46.132.2
  • Break and entercity median 172.8374
  • Theft from vehiclescity median 188.1116.1

More about Yonge-St.Clair

Ready emails

Copy and send as they are.

4 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 40 Heath St W

2 things to check at 40 Heath St W before you offer

  • Building permit open since 2024Moderate
  • Records mention garden suiteModerate
  • Site-specific exception 900.2.10(905)Moderate
  • 8 development applications open within 300 mLow
  • and 3 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 6 steps to take before you offer, so nothing slips
  • What each of the 7 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.