HousePrecheckCheck an address

4 Thyra AveTaylor-Massey, Toronto · City records before you offer

Residential detached · RD (f6.0; a185; d0.75)7.6 × 39.4 m300 m²on Thyra Avebacks onto Ln E Eldon S Dentonia Park

2 things to check before you offer, including work or applications in progress
N10 m
7.6 m frontage39.4 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 4 Thyra Ave

4 Thyra Ave is on a 7.6 m by 39.4 m lot on Thyra Ave in Taylor-Massey. The zoning is RD.

The City has 11 records on this lot since 2021. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Revision 01: proposal to keep create second unit in basement (duplex), 3 existing windows in basement floor; , add a new window (4' x 5') in ground floor, all…". Status: closed. In 2025, a Committee of Adjustment application was filed: "To alter the existing one-storey detached dwelling by constructing a rear one-storey addition (with a basement extension below), complete second and third…". Status: closed. In 2025, a building permit was filed: "Proposal to construct a new 2 storey laneway suite with basement, ground floor carport and second floor residential". Status: pending cancellation. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

No development applications are open within 300 m. Victoria Park station is a 6-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Records mention laneway suite, multiplex, second unitModerateFree check
  • 1 by-law investigation closed in the last two yearsLow
  • 2 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Garden suite

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • Records mention laneway suite, multiplex, second unit
  • 1 by-law investigation closed in the last two years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Records mention laneway suite, multiplex, second unit

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 1 by-law investigation closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. 2 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

11 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-04-26By-law investigation
26 152246 WST 00 IV
Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to construction waste and loose littClosed
2026-04-26By-law investigation
26 150177 WST 00 IR
WasteClosed
2026-03-20By-law investigation
26 132637 WST 00 IR
WasteClosed
2025-10-02Building permit
25 114096
Revision 01: Proposal to keep create second unit in basement (duplex), 3 existing windows in basement floor; , add a new window (4' x 5') in ground floor, all proposed windows are fire rated, floor height readjustment in all floor.Proposal for addition to existing dwelling.Closed
2025-09-29By-law investigation
25 232058 PRS 00 IR
Property StandardsClosed
2025-09-03Minor variance
A0524/25TEY
To alter the existing one-storey detached dwelling by constructing a rear one-storey addition (with a basement extension below), complete second and third storey additions, a rear ground floor covered deck, front and rear second storey balconies, and a parking pad in the rear yard. Also, to reconstruct the stairs for the existing front porch. There will be a total of two residential dwelling units on this lot. The existing detached garage will be demolished.Approved
2025-08-27Building permit
25 216925
Proposal to construct a new 2 storey laneway suite with basement, ground floor carport and second floor residential.Pending Cancellation
2023-01-20Building permit
22 207794
Drain - Proposed new 3 storey dwelling for single family and demo.Closed
2022-12-13Building permit
22 207827
Proposed Demolition of the existing single family dwelling.Closed
2022-06-08Minor variance
A1541/21TEY
To construct a new three-storey detached dwelling with a rear walkout basement, a front second storey balcony, a rear third storey balcony and a rear parking pad. The existing one-storey dwelling and ancillary building (rear detached garage) will be demolished.Approved
2021-09-13Zoning review
21 212074 ZZC
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • No heritage listing or designation
  • No site-specific zoning exception

What this part means for this house, in plain EnglishUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Limited

Build potential

How much more the rules allow on this lot, beyond what is on record

  • On record: multiplex, laneway suite, second unit
  • Garden suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. Garden suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N10 m
7.6 m frontage39.4 m deepon Thyra Ave
Zone
RD (f6.0; a185; d0.75)
Height limit
8.5 m
Lot coverage limit
35%
Corner lot
No
Public lane
Ln E Eldon S Dentonia Park, 8.5 m along it
New house permit
None since 2000

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

  • Multiplex up to 6 units

    On record

    Already permitted: 25 114096 (closed).

  • Secondary suite

    On record

    Already permitted: 25 114096 (closed).

  • Garden suite

    Likely fits

    See the garden suite check for this house

  • Laneway suite

    On record

    Already permitted: 25 216925 (pending cancellation).

Why, measured on this lot, and the most you could buildUnlock

Some

Building nearby

How much neighbours are building and applying to change within 300 m

  • 0 development applications within 300 m in 10 years, none open
  • In the Victoria Park station area
  • 10 suite and multiplex permits within 300 m in 10 years

What this part means for this house, in plain EnglishUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 2 of 6 categories

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Taylor-Massey neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$68,500median $84,500
Households that own their home34%median 54%
Population (2021)15,025median 16,813
Homes built in 1960 or before25%median 29%
Homes needing major repairs10%median 7%

Getting around and schools

  • Victoria Park StationNearest station6 min walk
  • Danforth Ave at Sibley AveNearest TTC stop3 min walk
  • Danforth AveNearest cycling route1 min walk
  • St Dunstan Catholic Elementary SchoolSchool10 min walk
  • Community Life Christian SchoolSchool10 min walk
  • Crescent Town Elementary SchoolSchool10 min walk
  • William J McCordic SchoolSchool11 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3788.7
  • Robberycity median 69.578.3
  • Auto theftcity median 192.6192.7
  • Theft over $5,000city median 46.124.1
  • Break and entercity median 172.8144.5
  • Theft from vehiclescity median 188.1210.7

More about Taylor-Massey

Ready emails

Copy and send as they are.

5 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 4 Thyra Ave

2 things to check at 4 Thyra Ave before you offer

  • Work or applications in progressModerate
  • Records mention laneway suite, multiplex, second unitModerate
  • 1 by-law investigation closed in the last two yearsLow
  • 2 Committee of Adjustment files on this lotLow

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 6 steps to take before you offer, so nothing slips
  • What each of the 4 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.