Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 4 Sumach St
4 Sumach St is on a 7.8 m by 22.6 m lot on Sumach St in Moss Park. The zoning is R. A site-specific exception, 900.2.10(4), changes some of the usual rules for this address.
The City has 6 records on this lot since 2001. That is more than at 95% of Toronto houses. In 2025, a development application was filed: "Site plan control application to facilitate the development of the site with two mixed use buildings: 59 and 55 storeys, containing 1,284 dwelling units and…". Status: under review. In 2024, a building permit was filed: "Proposed demolition of existing building". Status: under review. In 2021, a development application was filed: "Official plan and zoning by-law amendment application to facilitate the development of the site with a 59-storey mixed use building and a 55-storey residential…". Status: closed. Nothing on file is open right now.
Within 300 m, 8 development applications are open (the tallest up to 55 storeys). Within 300 m, the Committee of Adjustment decided 22 minor variance applications in the last 10 years and approved 100%. The nearest TTC stop is King St East at Sumach St, a 2-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.2.10(4)Moderate
- No permit for a second unit on fileLowFree check
- House demolished in 2024, no new house permit on fileLow
- 8 development applications open within 300 mLowFree check
- 2 City trees in front of this lotLowFree check
- King-Parliament Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buying
City files on this lot
6 records on file, more than at 95% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-10-21 | Development application25 242829 STE 13 SA | Site Plan Control Application to facilitate the development of the site with two mixed use buildings: 59 and 55 storeys, containing 1,284 dwelling units and 1,662 square metres of non-residential gross floor area. | Under Review | |
| 2024-08-12 | Building permit24 196673 | Proposed demolition of existing building. | Under Review | |
| 2021-08-26 | Development application21 204556 STE 13 OZ | Official Plan and Zoning By-law Amendment Application to facilitate the development of the site with a 59-storey mixed use building and a 55-storey residential building (204 and 191 metres, including mechanical penthouse), containing 1,276 dwelling units and a minimum of 1,200 square metres of nonresidential gross floor area. | Closed | |
| 2003-01-14 | Building permit03 101760 | install plumbing fixtures on 2nd floor: 1 wc, 1 wb, 1 shower. (NO PLANS) Cost included in BP03-118520(990) | Closed - Dormant | |
| 2001-06-22 | Building permit01 118523 | Install fixtures on 1st floor, 1wc, 1wb, 1 bt, 1 2-compt ks, 1wm.cost included in 01 118520 | Closed - Dormant | |
| 2001-06-22 | Building permit01 118520 | Interior alterations and construct 2nd storey dormer at rear. | Closed - Dormant |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(4)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(4)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
King-Parliament Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(4)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Secondary suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x4)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 8 development applications open within 300 m, up to 55 storeys
- 5 suite and multiplex permits within 300 m in 10 years
- 22 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
8 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Assault: 3.5 times the Toronto median
- Robbery: 2.4 times the Toronto median
- Break and enter: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Moss Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen StationNearest station28 min walk
- King St East at Sumach StNearest TTC stop2 min walk
- Cherry StNearest cycling route1 min walk
- Inglenook Community SchoolSchool2 min walk
- St Paul Catholic Elementary SchoolSchool5 min walk
- George Brown College - Young Centre for the Performing ArtsSchool7 min walk
- Nelson Mandela Park Public SchoolSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32226.8
- Robberycity median 69.5166.6
- Homicidecity median 5.33.4
- Shootingscity median 10.53.4
- Auto theftcity median 192.681.6
- Theft over $5,000city median 46.164.6
- Break and entercity median 172.8350.2
- Theft from vehiclescity median 188.1275.4
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist