This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 4 Fee Pl
4 Fee Pl is on a 13.7 m by 30.3 m lot on Wascana Ave in Regent Park. The zoning is R. A site-specific exception, 900.2.10(849), changes some of the usual rules for this address.
The City has 8 records on this lot since 2007. That is more than at 98% of Toronto houses. In 2017, a building permit was filed: "Revision 2 - as built conditions, includes 11.19 of additional building area.proposal to construct a new single family detached three storey dwelling with…". Status: closed. In 2016, a building permit was filed: "Party wall permit for work done at 8 fee place ((13-162519 bld)". Status: permit issued. In 2015, a Committee of Adjustment application was filed: "To construct a new three-storey single family row house with a two-storey garage connected to the main dwelling by a second floor breezeway, a rear deck, a…". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 6 development applications are open (the tallest up to 46 storeys). Within 300 m, the Committee of Adjustment decided 28 minor variance applications in the last 10 years and approved 86%. The nearest TTC stop is Queen St East at Sumach St, a 1-minute walk.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2007ModerateFree check
- Site-specific exception 900.2.10(849)Moderate
- No permit for a second unit on fileLowFree check
- 6 development applications open within 300 mLowFree check
- Downtown Plan Secondary PlanLow
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units · Laneway suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2007
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2007
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
8 records on file, more than at 98% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2017-03-22 | Building permit14 227376 | REVISION 2 - as built conditions, includes 11.19 of additional building area.Proposal to construct a new single family detached three storey dwelling with finished basement, attached garage and green roof an the second and third floor roofs.. | Closed | |
| 2016-03-24 | Building permit13 162578 | Party wall permit for work done at 8 Fee Place ((13-162519 BLD) | Permit Issued | |
| 2015-06-10 | Minor varianceA0352/15TEY | To construct a new three-storey single family row house with a two-storey garage connected to the main dwelling by a second floor breezeway, a rear deck, a third floor front terrace, a roof top staircase enclosure, and roof top green roof. Note: C of A Decision A0229/15TEY provided an approval for the same proposal; however, the applicant is now required to construct a separate structural wall in order to comply with the Ontario Building Code. | Approved | |
| 2013-05-22 | Minor varianceA0229/13TEY | To construct a new three-storey single family row house with a two-storey garage connected to the main dwelling by a second floor breezeway, a rear deck, a third floor front terrace, a roof top staircase enclosure, and roof top green roof. | Approved | |
| 2012-10-24 | Building permit12 184812 | This is for the demolition of this two storey row house at approx 175sm. | Closed | |
| 2012-10-24 | Building permit12 184804 | This is for the demolition of this two storey rowhouse at approx 175sm. | Closed | |
| 2011-12-05 | Zoning review11 320982 ZZC | No description on file | Closed | |
| 2007-10-23 | Building permit07 270798 | Extension of party wall bertween 6 & 8 Fee Place to facilitate construction of an addition at 8 Fee Place | Inspection |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(849)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(849)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(849)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: likely fits
- Laneway suite: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Laneway suite
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x849)
- Height limit
- —
- Corner lot
- No
- Public lane
- Fee Pl, 13.7 m along it
- New house permit
- 2017
- House footprint
- 10 m²
- Back yard
- 4.8 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 6 development applications open within 300 m, up to 46 storeys
- 5 suite and multiplex permits within 300 m in 10 years
- 28 minor variance decisions within 300 m, 86% approved
What this part means for this house, in plain EnglishUnlock
6 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Regent Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen StationNearest station29 min walk
- Queen St East at Sumach StNearest TTC stop1 min walk
- Sumach StNearest cycling route1 min walk
- Nelson Mandela Park Public SchoolSchool3 min walk
- St Paul Catholic Elementary SchoolSchool6 min walk
- Inglenook Community SchoolSchool7 min walk
- Liberty Prep SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3947.8
- Robberycity median 69.583.5
- Shootingscity median 10.56
- Auto theftcity median 192.695.4
- Theft over $5,000city median 46.111.9
- Break and entercity median 172.8166.9
- Theft from vehiclescity median 188.1125.2
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist