This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 398 Summerhill Ave
398 Summerhill Ave is on a 13.9 m by 11.6 m lot on Summerhill Ave in Rosedale-Moore Park. The zoning is CR. A site-specific exception, 900.11.10(1443), changes some of the usual rules for this address.
The City has 10 records on this lot since 2006. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal to construct new the and 5th floor additions, a 5 storey side addition, and interior alterations to convert existing residential dwelling to a…". Status: response received. In 2026, a Committee of Adjustment application was filed: "To permit a restaurant and a take-out restaurant use on the lower level (basement) and upper level (first storey) storey of the existing semi-detached…". Status: closed. In 2023, a Committee of Adjustment application was filed: "To alter the existing non-conforming three-storey semi-detached dwelling by constructing fourth and fifth storey additions, and a side (west) five-storey…". Status: closed. Nothing on file is open right now.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 40 minor variance applications in the last 10 years and approved 95%. The nearest TTC stop is Summerhill Ave at Maclennan Ave, a 1-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(1443)Moderate
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-10-27 | Building permit23 207725 | Proposal to construct new the and 5th floor additions, a 5 storey side addition, and interior alterations to convert existing residential dwelling to a commercial building.Please confirm the requirement of sprinkler and standpipe system. | Response Received | |
| 2026-10-21 | Minor varianceA0558/26TEY | To permit a restaurant and a take-out restaurant use on the lower level (basement) and upper level (first storey) storey of the existing semi-detached three-storey mixed-use building (fourth storey is mechanical space). The existing commercial and office space on the second storey, the residential dwelling unit on the third storey and the mechanical space on the fourth storey will be maintained and unaltered. | Approved | |
| 2026-03-12 | Zoning review26 128702 ZAP | No description on file | Applicable Law Pending | |
| 2025-05-22 | By-law investigation25 164789 WST 00 IV | Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to waste in the front yard. | Closed | |
| 2025-05-22 | By-law investigation25 163255 WST 00 IR | Waste | Closed | |
| 2023-07-12 | Minor varianceA0364/23TEY | To alter the existing non-conforming three-storey semi-detached dwelling by constructing fourth and fifth storey additions, and a side (west) five-storey addition. Also, to change the use from residential dwelling to mixed use building. | Approved | |
| 2023-03-28 | Zoning review23 127907 ZAP | No description on file | Closed | |
| 2022-11-02 | Building permit22 224263 | Party wall permit for work being done at 396 Summerhill Avenue (permit # 22-214449) | Cancelled | |
| 2007-05-25 | Building permit07 193792 | Interior alterations to finish BSMT of SFD. New Radiant floor heating | Closed | |
| 2006-05-04 | Building permit06 131181 | Rear and side deck /privacy screen to existing dwelling | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(1443)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(1443)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1443)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 1.5 (c1.0; r1.0) SS2 (x1443)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 70 m²
- Back yard
- 1.2 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- 9 suite and multiplex permits within 300 m in 10 years
- 40 minor variance decisions within 300 m, 95% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 6 categories
- Break and enter: 2.6 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Rosedale-Moore Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Summerhill StationNearest station21 min walk
- Summerhill Ave at Maclennan AveNearest TTC stop1 min walk
- Summerhill AveNearest cycling route1 min walk
- Whitney Jr Public SchoolSchool3 min walk
- Gradale Academy Elementary SchoolSchool7 min walk
- Our Lady of Perpetual Help Catholic Elementary SchoolSchool9 min walk
- Rosedale Jr Public SchoolSchool16 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.4
- Robberycity median 69.586.8
- Auto theftcity median 192.6199.6
- Theft over $5,000city median 46.165.1
- Break and entercity median 172.8455.6
- Theft from vehiclescity median 188.1182.2
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.