Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 396 Cortleigh Blvd
396 Cortleigh Blvd is on a 16.1 m by 42.5 m lot on Cortleigh Blvd in Bedford Park-Nortown. The zoning is RM. The lot also fronts Bathurst St.
The City has 39 records on this lot since 2014. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal for an open deck floor in rear yard at the first floor level of an existing day nursery with ancillary place of worship.see also 25 228906 zap and 25…". Status: permit issued. In 2026, a building permit was filed: "2 projecting signs**ernest & helen singer cortleigh jewish centre**". Status: permit issued. In 2026, a Committee of Adjustment application was filed: "To alter the existing building by constructing a new rear deck". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 2 development applications are open (the tallest up to 12 storeys). Within 300 m, the Committee of Adjustment decided 33 minor variance applications in the last 10 years and approved 94%. The nearest TTC stop is Bathurst St at Viewmount Ave South Side, a 1-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Records mention multiplexModerateFree check
- 1 by-law investigation closed in the last two yearsLow
- 2 development applications open within 300 mLowFree check
- 1 City tree in front of this lotLowFree check
- 12 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- Records mention multiplex
- 1 by-law investigation closed in the last two years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
12 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
39 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-11-05 | Zoning review26 265977 ZAP | No description on file | Not Started | |
| 2026-06-12 | Building permit26 159684 | Proposal for an open deck floor in rear yard at the first floor level of an existing day nursery with ancillary place of worship.See also 25 228906 ZAP and 25 255574 MV | Permit Issued | |
| 2026-04-17 | Building permit26 140505 | 2 projecting signs**ERNEST & HELEN SINGER CORTLEIGH JEWISH CENTRE** | Permit Issued | |
| 2026-03-06 | By-law investigation26 125930 ZON 00 IR | Zoning | Closed | |
| 2026-02-19 | Minor varianceA0021/26NY | To alter the existing building by constructing a new rear deck. | Approved | |
| 2026-01-30 | Building permit25 125658 | To convert the existing pair of semi dwellings into a day nursery, with an ancillary place of worship.See also 24 244651 MV. | Closed | |
| 2026-01-12 | Building permit21 175996 | REVISION 5 - as per the attached summaryProposal to demolish 1 storey sfd and construct 2 new sfd- semi part 1 | Closed | |
| 2026-01-08 | Minor varianceA0483/25NY | To construct a rear deck and permit two ground mounted air conditioning units in the east side yard of the existing building. | Approved | |
| 2025-12-08 | Zoning review25 263943 ZPR | No description on file | Closed | |
| 2025-09-22 | Zoning review25 228906 ZAP | No description on file | Closed | |
| 2025-09-18 | By-law investigation25 227198 LGW 00 IR | Long Grass and Weeds | Closed | |
| 2025-06-01 | By-law investigation25 184518 LGW 00 IV | Notice Issued Long Grass | Closed | |
| 2025-06-01 | By-law investigation25 169263 LGW 00 IR | Long Grass and Weeds | Closed | |
| 2025-03-24 | By-law investigation25 133814 SIN 00 IR | Signs | Closed | |
| 2025-01-23 | Minor varianceA0592/24NY | To convert the existing residential property into a day nursery, with an ancillary place of worship. | Approved | |
| 2024-06-04 | Zoning review24 158983 ZAP | No description on file | Application On Hold | |
| 2021-12-07 | Building permit21 176017 | Proposal to demolish 1 storey sfd and construct 2 new sfd- semi | Closed | |
| 2021-12-07 | Building permit21 176013 | Proposal to demolish 1 storey sfd and construct 2 new sfd- semi part 2 | Closed | |
| 2021-03-17 | Consent (lot split)B0015/21NY | The applicant is seeking the consent of the Committee of Adjustment to sever the subject property into two parcels of land. Accompanying minor variance applications, (A0199/21NY & A0206/21NY), have been filed which deals with the minor variance(s) requested to construct a pair of semi-detached dwellings. | Pending | |
| 2021-03-17 | Minor varianceA0206/21NY | Proposal for a new two-storey semi-detached dwelling. | Deferred | |
| 2021-03-17 | Minor varianceA0199/21NY | Proposal for a new semi-detached dwelling. File numbers B0015/21NY, A0199/21NY, A0206/21NY will be jointly considered. | Deferred | |
| 2021-02-19 | Zoning review21 117979 ZZC | No description on file | Notice Sent | |
| 2021-02-19 | Zoning review21 117974 ZZC | No description on file | Notice Sent | |
| 2020-07-07 | Zoning review20 164230 ZPR | No description on file | Closed | |
| 2019-03-04 | Consent (lot split)B0009/19NY | No description on file | Pending | |
| 2018-05-10 | Building permit18 116914 | Two storey semi-detached dwelling unit, Part 2 (west half) | Cancelled | |
| 2018-05-10 | Building permit18 116903 | Demolish the existing one storey dwelling | Cancelled | |
| 2018-05-10 | Building permit18 116891 | Two storey semi-detached dwelling unit, Part 1 (east half) | Cancelled | |
| 2017-10-26 | Minor varianceA0732/17NY | To construct a new three-storey, semi-detached dwelling. The existing dwelling would be demolished. | Approved with conditions | |
| 2017-10-26 | Minor varianceA0731/17NY | To construct a new three-storey, semi-detached dwelling. The existing dwelling would be demolished. | Approved with conditions | |
| 2017-06-26 | Zoning review17 187470 ZZC | No description on file | Closed | |
| 2017-06-26 | Zoning review17 187461 ZZC | No description on file | Closed | |
| 2016-03-24 | Consent (lot split)B0065/15NY | To obtain consent to sever the property into two undersized residential lots. | Deferred | |
| 2016-03-24 | Minor varianceA1064/15NY | To construct a new two-storey dwelling. The existing dwelling would be demolished. Files B0065/15NY, A1063/15NY, A1064/15NY will be considered jointly. | Pending | |
| 2016-03-24 | Minor varianceA1063/15NY | To construct a new two-storey dwelling. The existing dwelling would be demolished. Files B0065/15NY, A1063/15NY, A1064/15NY will be considered jointly. | Pending | |
| 2015-11-26 | Zoning review15 257260 ZZC | No description on file | Cancelled | |
| 2015-10-08 | Zoning review15 234782 ZZC | No description on file | Cancelled | |
| 2015-10-08 | Zoning review15 234771 ZZC | No description on file | Closed | |
| 2014-03-11 | Building permit14 123646 | Structural repairs to roof, chimney and detached garage and interior alterations | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
1 City tree in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex
- Garden suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RM (d0.75)
- Height limit
- —
- Lot coverage limit
- 35%
- Corner lot
- Yes, also on Bathurst St
- Public lane
- None
- New house permit
- 2026
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 2 development applications open within 300 m, up to 12 storeys
- 1 suite and multiplex permits within 300 m in 10 years
- 33 minor variance decisions within 300 m, 94% approved
What this part means for this house, in plain EnglishUnlock
2 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Bedford Park-Nortown neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Forest Hill StationNearest station16 min walk
- Bathurst St at Viewmount Ave South SideNearest TTC stop1 min walk
- Glencairn AveNearest cycling route4 min walk
- Eitz Chaim School (bathurst)School1 min walk
- Torah Emeth Jewish Centre & Eitz Chaim Hebrew SchoolSchool1 min walk
- Bialik Hebrew Day SchoolSchool2 min walk
- Bnos Bais Yaakov School for GirlsSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3230.1
- Robberycity median 69.559.5
- Auto theftcity median 192.6150.8
- Theft over $5,000city median 46.167.4
- Break and entercity median 172.8250
- Theft from vehiclescity median 188.1198.4
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist