Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 39 Queen's Park Cres E
39 Queen's Park Cres E is on a 31.4 m by 36.7 m lot on Queen's Park Cres E in Bay-Cloverhill. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.
The City has 4 records on this lot since 2001. That is more than at 88% of Toronto houses. In 2023, a building permit was filed: "Rev 01 - removal of an unused door on the ground floor & emergency pull station & exit signage, the addition of fire dampers in basement on mechanical drawings…". Status: under review. In 2019, a building permit was filed: "Modifications to the incoming water service piping within the existing building, to provide back-flow prevention". Status: closed. In 2001, a building permit was filed: "Demolition of concrete block building and adjoining brick and stucco building. total area of attached buildings is 497.16 square metres". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open (the tallest up to 40 storeys). Within 300 m, the Committee of Adjustment decided 4 minor variance applications in the last 10 years and approved 100%. Museum station is a 7-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Zoning not in By-law 569-2013Moderate
- 1 development application open within 300 mLowFree check
- 2 City trees in front of this lotLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
4 records on file, more than at 88% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2023-10-25 | Building permit22 162157 | REV 01 - removal of an unused door on the ground floor & emergency pull station & exit signage, the addition of fire dampers in basement on mechanical drawings to align with OBC requirements, relocated mechanical chase due to site conditions, plumbing provided for kitchen sink on ground floor to align with architectural, modifications to structural approach due to site conditions. No changes to the heritage strategy identified in the scoped HIA.Proposal for interior & exterior alterations. Scope includes construction of a new exterior fire exit built form, enclosing existing interior stair, construction of new exterior ramp, alterations to the interior to create a barrier free path of travel on the ground floor & alterations to second floor to accommodate new office program. Accessibility, life safety & mechanical upgrades to accomodate existing uses. New heating & cooling system. (Scoped Heritage Impact Assessment Report provided.)Entrance Address: 39 Queen's Park Cres EAddress of Property: 90 Wellesley St W | Under Review | |
| 2019-10-30 | Building permit19 229352 | Modifications to the incoming water service piping within the existing building, to provide back-flow prevention. | Closed | |
| 2008-06-25 | Consent (lot split)B0045/08TEY | To sever the land into two parts and to lease a portion of the land for 99 years: | Approved | |
| 2001-08-17 | Building permit01 154640 | Demolition of concrete block building and adjoining brick and stucco building. Total area of attached buildings is 497.16 square metres. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 317 m²
- Back yard
- 0 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 40 storeys
- 4 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 6 categories
- Theft over $5,000: 1.9 times the Toronto median
- Break and enter: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Bay-Cloverhill neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Museum StationNearest station7 min walk
- Wellesley St West at Queen's Park Cres EastNearest TTC stop1 min walk
- Queen's Park CresNearest cycling route1 min walk
- Toronto School of Theology - U of T, Bldg 434School1 min walk
- St Joseph's College SchoolSchool2 min walk
- The YMCA Academy Secondary SchoolSchool7 min walk
- Munk School of Global Affairs Graham Library - U of T, Bldg 12cSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3601.9
- Robberycity median 69.574.7
- Auto theftcity median 192.616.6
- Theft over $5,000city median 46.187.2
- Break and entercity median 172.8286.4
- Theft from vehiclescity median 188.1145.3
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist