HousePrecheckCheck an address

38 Prince Arthur AveAnnex, Toronto · City records before you offer

Commercial residential · CR 2.0 (c2.0; r1.0) SS2 (x2483)15.2 × 33.3 m505 m²on Prince Arthur Ave

2 things to check before you offer, including 3 building permits open, the oldest since 2003
N20 m
15.2 m frontage33.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 38 Prince Arthur Ave

38 Prince Arthur Ave is on a 15.2 m by 33.3 m lot on Prince Arthur Ave in Annex. The zoning is CR. A site-specific exception, 900.11.10(2483), changes some of the usual rules for this address. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.

The City has 7 records on this lot since 2001. That is more than at 97% of Toronto houses. In 2003, a building permit was filed: "Revise to building permit by delete requirment for fire separation in main staircase and minor contruction variences.existing and proposed use: office ( 1st…". Status: permit issued. In 2003, a building permit was filed: "Install sprinklers throughout building (existing office)see bp03-125746(990)". Status: inspection. In 2003, a building permit was filed: "Sprinkler shop drawings to be submitted later. "submitted on aug 14, 2003"". Status: inspection. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 9 development applications are open (the tallest up to 40 storeys). St. George station is a 3-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 3 building permits open, the oldest since 2003ModerateFree check
  • Heritage property: in a Heritage Conservation District (Part V)Moderate
  • Site-specific exception 900.11.10(2483)Moderate
  • 9 development applications open within 300 mLowFree check
  • Site and Area Specific Policy 198Low
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • 3 building permits open, the oldest since 2003
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. 3 building permits open, the oldest since 2003

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

7 records on file, more than at 97% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2003-11-19Building permit
03 125746
Revise to building permit by delete requirment for fire separation in main staircase and minor contruction variences.Existing and proposed use: office ( 1st and 2nd floor are under a single tenancyt)Permit Issued
2003-08-19Building permit
03 161163
install Sprinklers throughout building (existing office)see BP03-125746(990)Inspection
2003-08-19Building permit
03 158197
sprinkler shop drawings to be submitted later. "Submitted on Aug 14, 2003"Inspection
2003-04-23Building permit
03 125736
alterations for office renovation for a firm of chartered accountantsCancelled
2001-01-30Building permit
00 128475
H.V.A.C. INSTALL NEW H.V.A.C. SYSTEM IN ADDITION. COST INCLUDED IN 128464 EDCClosed
2001-01-19Building permit
00 128484
INSTALL ON 1ST FLOOR: 2 AREA DRAINS, 1 W.C., 1 W.B., 2ND FLOOR: 2 W.C., 2 W.B., 3RD FLOOR: 2 W.C., 2 W.B., 4TH FLOOR: 1 W.C., 1 W.B., IN BASEMENT: 3 FLOOR DRAIN, 1 HUB DRAIN, INSTALL NEW STORM DRAIN 6inch AND INSTALL NEW WATER SERVICE 4inch WEEPING TILE CONNECTION. INSTALL STORM AND SANITARY SUMP PUMP. ALSO INSTALL 5 ROOF DRAINS. COST INCLUDED IN 128464 EDC P L A N SClosed
2001-01-19Building permit
00 128464
CONSTRUCT 4 STOREY ADDITION AT REAR. EDCClosed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: in a Heritage Conservation District (Part V)
  • Site-specific exception 900.11.10(2483)

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: in a Heritage Conservation District (Part V)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.11.10(2483)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 198

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2483)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
15.2 m frontage33.3 m deepon Prince Arthur Ave
Zone
CR 2.0 (c2.0; r1.0) SS2 (x2483)
Height limit
12 m
Corner lot
No
Public lane
None
House footprint
177 m²
Back yard
15.6 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 9 development applications open within 300 m, up to 40 storeys
    • In the Bay station area
    • 4 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 9 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 8 categories
    • Theft over $5,000: 2.5 times the Toronto median
    • Break and enter: 2.2 times the Toronto median
    • Assault: 1.7 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Annex neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$85,000median $84,500
    Households that own their home41%median 54%
    Population (2021)29,300median 16,813
    Homes built in 1960 or before40%median 29%
    Homes needing major repairs6%median 7%

    Getting around and schools

    • St. George StationNearest station3 min walk
    • Bedford Rd at Lowther AveNearest TTC stop1 min walk
    • Bedford RdNearest cycling route1 min walk
    • The Shire SchoolSchool1 min walk
    • Munk School of Global Affairs at the Observatory - U of T, Bldg 89School4 min walk
    • Career Quest - TorontoSchool6 min walk
    • School of Continuing Studies - U of T, Bldg 103School6 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.31080.9
    • Robberycity median 69.580.5
    • Homicidecity median 5.35.2
    • Shootingscity median 10.55.2
    • Auto theftcity median 192.6116.9
    • Theft over $5,000city median 46.1114.3
    • Break and entercity median 172.8387.1
    • Theft from vehiclescity median 188.1220.9

    More about Annex

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 38 Prince Arthur Ave

    2 things to check at 38 Prince Arthur Ave before you offer

    • 3 building permits open, the oldest since 2003Moderate
    • Heritage property: in a Heritage Conservation District (Part V)Moderate
    • Site-specific exception 900.11.10(2483)Moderate
    • 9 development applications open within 300 mLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 7 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.