HousePrecheckCheck an address

376 Manning AvePalmerston-Little Italy, Toronto · City records before you offer

Residential · R (d0.6) (x735)7.5 × 40.9 m304 m²on Manning Avebacks onto Morley Safer Lane

3 things to check before you offer, including 2 open orders or by-law investigations
N10 m
7.5 m frontage40.9 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 376 Manning Ave

376 Manning Ave is on a 7.5 m by 40.9 m lot on Manning Ave in Palmerston-Little Italy. The zoning is R. A site-specific exception, 900.2.10(735), changes some of the usual rules for this address.

The City has 12 records on this lot since 2024. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Renovate garage to create laneway house". Status: permit issued. In 2026, a building permit was filed: "376 manning avenue in the city of toronto is a 3-storey house-form building with a single basement level.it was constructed prior to the advent of the ontario…". Status: deficiency notice issued. In 2026, a building permit was filed: "Revision 01 - third-storey addition; construction of rear access structures serving the dwelling units at the rear; interior alterations, including…". Status: under review. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection. There are 2 open orders or by-law investigations on file. Ask the seller what is outstanding and whether it will be fixed before closing.

No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 85 minor variance applications in the last 10 years and approved 98%. The nearest TTC stop is College St at Euclid Ave, a 2-minute walk.

Summary

What the City's records show on this house

  • 2 open orders or by-law investigationsSerious
  • Work or applications in progressModerateFree check
  • Records mention laneway suite, multiplexModerateFree check
  • Site-specific exception 900.2.10(735)Moderate
  • A garden suite may lack room for its fire access pathLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

3 things to check before you offer, 1 of them serious.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Serious

Open City files

How much in the City's records needs answers before an offer

  • 2 open orders or by-law investigations
  • Work or applications in progress
  • Records mention laneway suite, multiplex

What this part means for this house, in plain EnglishUnlock

  1. 2 open orders or by-law investigations

    SeriousCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. Records mention laneway suite, multiplex

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  4. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

12 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-11-13Building permit
26 148396
Renovate garage to create laneway housePermit Issued
2026-09-02Building permit
26 231125
376 Manning Avenue in the City of Toronto is a 3-storey house-form building with a single basement level.It was constructed prior to the advent of the Ontario Building Code. The building area of 91.46 m2 isdetermined by the gross area of the raised basement, which has the largest area of the four floor levelsmeasured to the exterior surfaces of exterior walls. Until recently the building has been operated as ashared rental house primarily accommodating students. Under an original permit application, 376 ManningAvenue was to be renovated as a single-dwelling unit house. Subsequent zoning approval was eventuallyobtained for conversion of the house to a 4-plex containing four separate dwelling units.Renovation of the building has entailed construction of an addition on the west side of the Third Floor.Although original exterior walls are of solid masonry, the new portions of the north- and south-facing ThirdFloor EBFs were constructed using 2 x 6 wood studs under the original permit application for renovation of376 Manning Avenue as a single-dwelling unit house. While under OBC B 9.10.15.5.(2) wood studs wouldhave been permitted in the north- and south-facing Third Floor ETFs as a single-dwelling unit house, underthe updated permit application subsequent to zoning approval for conversion of the house to a 4-plex, thewood studs have the effect of creating a lack of conformance with the acceptable solution contained inOBC B 9.10.14.5.(1), which requires the EBFs to be of noncombustible construction.The proposed alternative solution is based on demonstrating that the performance level of the portions ofnorth- and south-facing Third Floor EBFs constructed using 2 x 6 wood studs will not be less than whatwould be achieved if those portions of the EBFs conformed to the minimum requirements for 1h fireresistancerated EBFs of noncombustible construction.Deficiency Notice Issued
2026-07-15Building permit
24 226637
Revision 01 - Third-storey addition; construction of rear access structures serving the dwelling units at the rear; interior alterations, including underpinning; and conversion of the existing semi-detached single dwelling into a semi-detached houseplex with four dwelling units.Proposed third storey addition (53 sqm), interior alterations (285.12 sqm) and underpinning (51.4 m).Under Review
2026-06-10Building order
26 181545 OTC 00 VI
No description on fileOrder Issued
2026-04-22Building order
26 147906 WNP 00 VI
Order Issued No Permit: reframed the garage, encroached onto neighbouring laneway, no setback.Order Issued
2026-02-26Building permit
26 121650
Proposed third-floor addition to convert existing single family dwelling to fourplex.Refusal Notice
2025-08-15Zoning review
25 210824 ZAP
No description on fileApplication On Hold
2025-08-15Zoning review
25 210814 ZAP
No description on fileApplication On Hold
2025-04-12By-law investigation
25 196362 WST 00 IV
Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to, wood, foam, renovation materialsClosed
2025-04-12By-law investigation
25 143597 WST 00 IR
WasteClosed
2024-07-17Minor variance
A0458/24TEY
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a third storey addition with a rear rooftop deck (above a portion of the rear second level). The existing rear detached garage will be maintained and unaltered.Approved
2024-02-20Zoning review
24 116998 ZAP
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(735)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(735)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(735)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

  • On record: multiplex, laneway suite
  • Garden suite: needs a closer look

What this part means for this house, in plain EnglishUnlock

  1. A garden suite may lack room for its fire access path

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N10 m
7.5 m frontage40.9 m deepon Manning Ave
Zone
R (d0.6) (x735)
Height limit
11 m
Corner lot
No
Public lane
Morley Safer Lane, 7.5 m along it
New house permit
None since 2000
House footprint
134 m²
Back yard
16.2 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

  • Multiplex up to 6 units

    On record

    Already permitted: 26 231125 (deficiency notice issued).

  • Secondary suite

    Likely fits
  • Garden suite

    Needs a closer look

    See the garden suite check for this house

  • Laneway suite

    On record

    Already permitted: 26 148396 (permit issued).

Why, measured on this lot, and the most you could buildUnlock

Some

Building nearby

How much neighbours are building and applying to change within 300 m

  • 0 development applications within 300 m in 10 years, none open
  • 74 suite and multiplex permits within 300 m in 10 years
  • 85 minor variance decisions within 300 m, 98% approved

What this part means for this house, in plain EnglishUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 4 of 7 categories
  • Robbery: 1.6 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Palmerston-Little Italy neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$88,000median $84,500
Households that own their home42%median 54%
Population (2021)13,120median 16,813
Homes built in 1960 or before73%median 29%
Homes needing major repairs9%median 7%

Getting around and schools

  • Christie StationNearest station16 min walk
  • College St at Euclid AveNearest TTC stop2 min walk
  • College StNearest cycling route1 min walk
  • St Francis of Assisi Catholic Elementary SchoolSchool2 min walk
  • Clinton Street Jr Public SchoolSchool3 min walk
  • Ecole Elementaire Pierre Elliott TrudeauSchool7 min walk
  • King Edward Jr & Sr Public SchoolSchool9 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3654.6
  • Robberycity median 69.5113.8
  • Shootingscity median 10.57.1
  • Auto theftcity median 192.6113.8
  • Theft over $5,000city median 46.128.5
  • Break and entercity median 172.8256.2
  • Theft from vehiclescity median 188.1142.3

More about Palmerston-Little Italy

Ready emails

Copy and send as they are.

6 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 376 Manning Ave

3 things to check at 376 Manning Ave before you offer

  • 2 open orders or by-law investigationsSerious
  • Work or applications in progressModerate
  • Records mention laneway suite, multiplexModerate
  • Site-specific exception 900.2.10(735)Moderate
  • and 2 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 6 steps to take before you offer, so nothing slips
  • What each of the 6 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.