HousePrecheckCheck an address

372 Yonge StYonge-Bay Corridor, Toronto · City records before you offer

Also 2 Walton St, 372 1/2 Yonge St, 372A Yonge St

Commercial residential · CR 4.0 (c4.0; r1.5) SS1 (x2553)7.5 × 27.0 m200 m²on Yonge Stcorner, also on Walton Stbacks onto Ln W Yonge N Walton

2 things to check before you offer, including building permit open since 2013
N10 m
7.5 m frontage27.0 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 372 Yonge St

372 Yonge St is on a 7.5 m by 27 m lot on Yonge St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(2553), changes some of the usual rules for this address. The lot also fronts Walton St. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.

The City has 23 records on this lot since 2003. That is more than at 99% of Toronto houses. In 2021, a development application was filed: "Site plan approval for a 73-storey mixed-use building having an non-residential gross floor area of 954.50 square metres, and a residential gross floor area of…". Status: closed. In 2020, a development application was filed: "Proposal for a 73-storey mixed-use building comprised of 34,471 square metres of gross floor area. a total of 415 residential dwelling units are proposed". Status: closed. In 2013, a building permit was filed: "To erect and display two illuminated wall signs and two non-illuminated projecting signs on the southerly and easterly elevations of second storey of building…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 19 development applications are open (the tallest up to 85 storeys). College station is a 3-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2013ModerateFree check
  • Heritage property: listedModerate
  • Site-specific exception 900.11.10(2553)Moderate
  • 1 by-law investigation closed in the last two yearsLow
  • 19 development applications open within 300 mLowFree check
  • Priority retail street: Yonge StreetLow
  • 2 City trees in front of this lotLowFree check
  • Site and Area Specific Policy 174Low
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2013
  • 1 by-law investigation closed in the last two years
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 by-law investigation closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

City files on this lot

23 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-06-03By-law investigation
26 177173 PRS 00 IR
Property StandardsClosed
2026-01-19By-law investigation
26 106080 WST 00 IR
WasteClosed
2025-11-18By-law investigation
25 255651 WST 00 IR
WasteClosed
2024-01-29Zoning review
24 109120 LTO
No description on fileClosed
2023-12-29Zoning review
23 239040 LTO
No description on fileClosed
2022-05-11Zoning review
22 145050 LTO
No description on fileClosed
2021-09-23Zoning review
21 215063 PSP
No description on fileClosed
2021-09-23Zoning review
20 174053 POZ
No description on fileClosed
2021-09-20Development application
21 215063 STE 11 SA
Site Plan Approval for a 73-storey mixed-use building having an non-residential gross floor area of 954.50 square metres, and a residential gross floor area of 33,144.90 square metres with 415 dwelling units.Closed
2020-07-29Development application
20 174053 STE 11 OZ
Proposal for a 73-storey mixed-use building comprised of 34,471 square metres of gross floor area. A total of 415 residential dwelling units are proposed.Closed
2019-02-18Zoning review
19 116249 LTO
No description on fileClosed
2017-01-11Building permit
17 103174
To erect and display two static illuminated wall signs.**WEIGHT WATCHERS**Cancelled
2013-09-12Building permit
13 219558
To erect and display two illuminated wall signs and two non-illuminated projecting signs on the southerly and easterly elevations of second storey of building, in conjunction with a health/fitness centre. **Weight Watchers**Closed
2013-08-19Building permit
13 193848
Proposal for interior alterations to existing group D occupancy - located on the 2nd floor of existing 2-storey commercial/non residential building. Tenant is 'Weight Watchers"Closed
2013-08-19Building permit
13 214929
Interior alterations to an existing 2 storey A2 occupancy "restaurant" to permit the infill of an existing opening between the first and second floor level in orer to demise the first and second floor level into separatelyThe ground floor and basement restaurant seating is 44 seats.Inspection
2013-03-12Zoning review
13 131781 LPR
No description on fileClosed
2010-08-18Building permit
10 218795
Proposal to erect 6 first party illuminated signs. 2-wall signs on east elevation, 2 wall signs on south elevation, 1-wall sign & 1-projecting sign on west elevation.Closed
2010-03-02Building permit
09 196477
HVAC - Interior alterations to all floors of existing two storey building including the basement for a new restaurant with approx. 107 seats. This proposal includes HVAC and Plumbing.Closed
2007-06-22Building permit
07 228320
Make interior alterations for take-out restaurant with no seating provided.Closed
2006-09-25Zoning review
06 178172 ZPU
No description on fileClosed
2005-10-12Zoning review
05 192920 LTO
No description on fileClosed
2005-10-07Zoning review
05 191789 LTO
No description on fileClosed
2003-12-09Building permit
03 198201
install kitchen exhaust systemClosed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: listed
  • Site-specific exception 900.11.10(2553)
  • Priority retail street: Yonge Street

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: listed

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.11.10(2553)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. Priority retail street: Yonge Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. 2 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  5. Site and Area Specific Policy 174

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  6. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2553)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
7.5 m frontage27.0 m deepon Yonge St
Zone
CR 4.0 (c4.0; r1.5) SS1 (x2553)
Height limit
20 m
Corner lot
Yes, also on Walton St
Public lane
Ln W Yonge N Walton, 13.7 m along it
House footprint
198 m²
Back yard
0.1 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 19 development applications open within 300 m, up to 85 storeys
    • In the College station area
    • 1 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 19 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 8 categories
    • Assault: 5.3 times the Toronto median
    • Theft over $5,000: 4.6 times the Toronto median
    • Robbery: 4.3 times the Toronto median
    • Break and enter: 3.2 times the Toronto median
    • Homicide: 2.3 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Yonge-Bay Corridor neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$68,500median $84,500
    Households that own their home32%median 54%
    Population (2021)12,645median 16,813
    Homes built in 1960 or before2%median 29%
    Homes needing major repairs2%median 7%

    Getting around and schools

    • College StationNearest station3 min walk
    • Yonge St at Gerrard St West South SideNearest TTC stop1 min walk
    • Gerrard St WNearest cycling route1 min walk
    • Toronto Metropolitan University - Theatre SchoolSchool4 min walk
    • Tmu - Heaslip HouseSchool4 min walk
    • Toronto Metropolitan University - School of Image ArtsSchool5 min walk
    • Toronto Metropolitan University - Entr To Business School LobbySchool5 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.33361.1
    • Robberycity median 69.5300.1
    • Homicidecity median 5.312
    • Shootingscity median 10.512
    • Auto theftcity median 192.6162.1
    • Theft over $5,000city median 46.1210.1
    • Break and entercity median 172.8552.2
    • Theft from vehiclescity median 188.1402.1

    More about Yonge-Bay Corridor

    Ready emails

    Copy and send as they are.

    3 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 372 Yonge St

    2 things to check at 372 Yonge St before you offer

    • Building permit open since 2013Moderate
    • Heritage property: listedModerate
    • Site-specific exception 900.11.10(2553)Moderate
    • 1 by-law investigation closed in the last two yearsLow
    • and 5 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 9 steps to take before you offer, so nothing slips
    • What each of the 9 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.