HousePrecheckCheck an address

363 Yonge StDowntown Yonge East, Toronto · City records before you offer

Also 363 Yonge St, 365 Yonge St

Commercial residential · CR 4.0 (c4.0; r1.5) SS1 (x175)15.1 × 40.0 m591 m²on Yonge Stbacks onto O'Keefe Lane

2 things to check before you offer, including heritage property: designated (Part IV)
N10 m
15.1 m frontage40.0 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 363 Yonge St

363 Yonge St is on a 15.1 m by 40 m lot on Yonge St in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(175), changes some of the usual rules for this address. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.

The City has 30 records on this lot since 1999. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Deferred fees from folder 19 264646 (rsn-4700119) zoningprocess rsn 64198442". Status: open. In 2023, a Committee of Adjustment application was filed: "To alter the development standards, as approved for a 85-storey mixed-use building (under site specific zoning by-laws 1301-2019 (lpat) and 1302-2019 (lpat))". Status: closed. In 2023, a building permit was filed: "Conditional permit - part permit - proposal to construct a 85-storey mixed-use development containing residential and non-residential units including office…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 17 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 18 minor variance applications in the last 10 years and approved 94%. TMU station is a 4-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Heritage property: designated (Part IV)Moderate
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(175)Moderate
  • 17 development applications open within 300 mLowFree check
  • Priority retail street: Yonge StreetLow
  • Site and Area Specific Policy 174Low
  • Downtown Plan Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

30 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-08-04Zoning review
26 213671 ZAP
No description on fileNotice Sent
2025-11-05Building permit
25 264646
Deferred Fees from folder 19 264646 (RSN-4700119) ZoningProcess RSN 64198442Open
2023-11-08Minor variance
A0016/23TEY
To alter the development standards, as approved for a 85-storey mixed-use building (under Site Specific Zoning By-laws 1301-2019 (LPAT) and 1302-2019 (LPAT)).Approved
2023-07-24Building permit
19 264646
Conditional Permit - Part Permit - Proposal to construct a 85-storey mixed-use development containing residential and non-residential units including office, retail and institutional uses.Closed
2023-07-07Zoning review
23 171189 ZAP
No description on fileNotice Sent
2022-04-27Zoning review
22 139235 ZAP
No description on fileClosed
2020-04-09Building permit
20 131249
To provide 65mm standpipe system hose valve connections in general conformance with the 2015 National Building Code and the 2013 Edition of NFPA 14 in this fully sprinklered building. The 65mm hose connections will be provided in lieu of hose stations (38mm and 65mm hose valves, 38mm hose and nozzle) required by the 2012 Ontario Building Code. The standpipe system andhose connections will be located within exit stair enclosures.Cancelled
2020-01-15Zoning review
20 104987 ZMP
No description on fileCancelled
2019-12-12Zoning review
19 113000 PSP
No description on fileClosed
2019-06-04Building permit
18 240613
Proposal for a stand alone shoring permit for future development. See also OPA/Rezoning application 15 227133 OZ. Address includes 363-385 Yonge St.Closed
2019-06-03Building permit
18 233315
Proposal to demolish existing building (363-365 Yonge St). & Facade retentionClosed
2019-05-31Building permit
19 148484
Proposal to construct a heritage retention system to retain facade of existing building.Closed
2019-02-07Development application
19 113000 STE 13 SA
Site Plan Application to permit the construction of a 85-storey mixed-use development. The proposal entails 96,532 m2 of residential GFA and 7,440 m2 non-residential GFA. A total of 1,415 residential units are proposed.NOAC Issued
2018-12-21Zoning review
18 271290 ZBA
No description on fileCancelled
2016-01-08Zoning review
16 102061 LTO
No description on fileClosed
2015-09-23Development application
15 227133 STE 27 OZ
Application for an Official Plan to permit the construction of a 98-storey mixed-use development. The proposal entails 76,870 m2 of residential GFA and 20,516 m2 non-residential GFA including both office and retil space. A total of 957 residential units are proposed.Closed
2015-05-01Zoning review
15 146478 PRZ
No description on fileClosed
2015-04-24Development application
15 146478 STE 27 OZ
Application for an Official Plan and Zoning Amendment to permit the construction of a 98-storey mixed-use development. The proposal entails 76,870 m2 of residential GFA and 20,516 m2 non-residential GFA including both office and retail space. A total of 957 residential units are proposed.Closed
2014-09-30Zoning review
14 230155 LTO
No description on fileClosed
2008-11-05Building permit
08 215787
interior alterations to existing office space - ground floorClosed
2008-07-21Zoning review
08 184509 ZPR
No description on fileClosed
2006-05-09Zoning review
06 133226 LTO
No description on fileClosed
2005-12-21Building permit
05 208549
Install a new exhaust duct in existing restaurant (less than 30 seats)Closed
2005-05-27Zoning review
05 136313 LTO
No description on fileClosed
2004-11-04Building permit
04 187529
Installation of kitchen exhaust. NOTE : OTCClosed
2004-04-14Zoning review
04 124629 LTO
No description on fileClosed
2003-07-29Zoning review
03 161518 LTO
No description on fileClosed
2003-04-23Zoning review
03 125652 LTO
No description on fileClosed
1999-03-04Building permit
99 013262
ALTER PLANS AS APPROVED UNDER FILE 422101 BY MAKING FURTHER INTERIOR ALTERATIONS AND ALTERING STORE FRONT. "LISTED HISTORICAL" /LMClosed
1999-02-11Building permit
99 013005
MAKE INTERIOR ALTERS TO GROUND FLOOR OF EXISTING RETAIL STORE. AREA 97.5 M2 (FEE COLLECTED $292.50) (W24)/SP "CALL WHEN READY"Closed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: designated (Part IV)
  • Site-specific exception 900.11.10(175)
  • Priority retail street: Yonge Street

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: designated (Part IV)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.11.10(175)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. Priority retail street: Yonge Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Site and Area Specific Policy 174

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  5. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(175)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
15.1 m frontage40.0 m deepon Yonge St
Zone
CR 4.0 (c4.0; r1.5) SS1 (x175)
Height limit
20 m
Corner lot
No
Public lane
O'Keefe Lane, 14.7 m along it
House footprint
253 m²
Back yard
2.2 m
Buildings on the lot
5

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 17 development applications open within 300 m, up to 85 storeys
    • In the College station area
    • 18 minor variance decisions within 300 m, 94% approved

    What this part means for this house, in plain EnglishUnlock

    1. 17 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • TMU StationNearest station4 min walk
    • Yonge St at Elm StNearest TTC stop1 min walk
    • Gerrard St ENearest cycling route2 min walk
    • Tmu - Heaslip HouseSchool3 min walk
    • Toronto Metropolitan University - School of Image ArtsSchool3 min walk
    • Toronto Metropolitan University - Theatre SchoolSchool3 min walk
    • Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool4 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    3 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 363 Yonge St

    2 things to check at 363 Yonge St before you offer

    • Heritage property: designated (Part IV)Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(175)Moderate
    • 17 development applications open within 300 mLow
    • and 4 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 5 steps to take before you offer, so nothing slips
    • What each of the 8 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.