Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 363 Yonge St
363 Yonge St is on a 15.1 m by 40 m lot on Yonge St in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(175), changes some of the usual rules for this address. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 30 records on this lot since 1999. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Deferred fees from folder 19 264646 (rsn-4700119) zoningprocess rsn 64198442". Status: open. In 2023, a Committee of Adjustment application was filed: "To alter the development standards, as approved for a 85-storey mixed-use building (under site specific zoning by-laws 1301-2019 (lpat) and 1302-2019 (lpat))". Status: closed. In 2023, a building permit was filed: "Conditional permit - part permit - proposal to construct a 85-storey mixed-use development containing residential and non-residential units including office…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 17 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 18 minor variance applications in the last 10 years and approved 94%. TMU station is a 4-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: designated (Part IV)Moderate
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(175)Moderate
- 17 development applications open within 300 mLowFree check
- Priority retail street: Yonge StreetLow
- Site and Area Specific Policy 174Low
- Downtown Plan Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
30 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-08-04 | Zoning review26 213671 ZAP | No description on file | Notice Sent | |
| 2025-11-05 | Building permit25 264646 | Deferred Fees from folder 19 264646 (RSN-4700119) ZoningProcess RSN 64198442 | Open | |
| 2023-11-08 | Minor varianceA0016/23TEY | To alter the development standards, as approved for a 85-storey mixed-use building (under Site Specific Zoning By-laws 1301-2019 (LPAT) and 1302-2019 (LPAT)). | Approved | |
| 2023-07-24 | Building permit19 264646 | Conditional Permit - Part Permit - Proposal to construct a 85-storey mixed-use development containing residential and non-residential units including office, retail and institutional uses. | Closed | |
| 2023-07-07 | Zoning review23 171189 ZAP | No description on file | Notice Sent | |
| 2022-04-27 | Zoning review22 139235 ZAP | No description on file | Closed | |
| 2020-04-09 | Building permit20 131249 | To provide 65mm standpipe system hose valve connections in general conformance with the 2015 National Building Code and the 2013 Edition of NFPA 14 in this fully sprinklered building. The 65mm hose connections will be provided in lieu of hose stations (38mm and 65mm hose valves, 38mm hose and nozzle) required by the 2012 Ontario Building Code. The standpipe system andhose connections will be located within exit stair enclosures. | Cancelled | |
| 2020-01-15 | Zoning review20 104987 ZMP | No description on file | Cancelled | |
| 2019-12-12 | Zoning review19 113000 PSP | No description on file | Closed | |
| 2019-06-04 | Building permit18 240613 | Proposal for a stand alone shoring permit for future development. See also OPA/Rezoning application 15 227133 OZ. Address includes 363-385 Yonge St. | Closed | |
| 2019-06-03 | Building permit18 233315 | Proposal to demolish existing building (363-365 Yonge St). & Facade retention | Closed | |
| 2019-05-31 | Building permit19 148484 | Proposal to construct a heritage retention system to retain facade of existing building. | Closed | |
| 2019-02-07 | Development application19 113000 STE 13 SA | Site Plan Application to permit the construction of a 85-storey mixed-use development. The proposal entails 96,532 m2 of residential GFA and 7,440 m2 non-residential GFA. A total of 1,415 residential units are proposed. | NOAC Issued | |
| 2018-12-21 | Zoning review18 271290 ZBA | No description on file | Cancelled | |
| 2016-01-08 | Zoning review16 102061 LTO | No description on file | Closed | |
| 2015-09-23 | Development application15 227133 STE 27 OZ | Application for an Official Plan to permit the construction of a 98-storey mixed-use development. The proposal entails 76,870 m2 of residential GFA and 20,516 m2 non-residential GFA including both office and retil space. A total of 957 residential units are proposed. | Closed | |
| 2015-05-01 | Zoning review15 146478 PRZ | No description on file | Closed | |
| 2015-04-24 | Development application15 146478 STE 27 OZ | Application for an Official Plan and Zoning Amendment to permit the construction of a 98-storey mixed-use development. The proposal entails 76,870 m2 of residential GFA and 20,516 m2 non-residential GFA including both office and retail space. A total of 957 residential units are proposed. | Closed | |
| 2014-09-30 | Zoning review14 230155 LTO | No description on file | Closed | |
| 2008-11-05 | Building permit08 215787 | interior alterations to existing office space - ground floor | Closed | |
| 2008-07-21 | Zoning review08 184509 ZPR | No description on file | Closed | |
| 2006-05-09 | Zoning review06 133226 LTO | No description on file | Closed | |
| 2005-12-21 | Building permit05 208549 | Install a new exhaust duct in existing restaurant (less than 30 seats) | Closed | |
| 2005-05-27 | Zoning review05 136313 LTO | No description on file | Closed | |
| 2004-11-04 | Building permit04 187529 | Installation of kitchen exhaust. NOTE : OTC | Closed | |
| 2004-04-14 | Zoning review04 124629 LTO | No description on file | Closed | |
| 2003-07-29 | Zoning review03 161518 LTO | No description on file | Closed | |
| 2003-04-23 | Zoning review03 125652 LTO | No description on file | Closed | |
| 1999-03-04 | Building permit99 013262 | ALTER PLANS AS APPROVED UNDER FILE 422101 BY MAKING FURTHER INTERIOR ALTERATIONS AND ALTERING STORE FRONT. "LISTED HISTORICAL" /LM | Closed | |
| 1999-02-11 | Building permit99 013005 | MAKE INTERIOR ALTERS TO GROUND FLOOR OF EXISTING RETAIL STORE. AREA 97.5 M2 (FEE COLLECTED $292.50) (W24)/SP "CALL WHEN READY" | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Site-specific exception 900.11.10(175)
- Priority retail street: Yonge Street
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(175)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Yonge Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 174
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(175)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.0 (c4.0; r1.5) SS1 (x175)
- Height limit
- 20 m
- Corner lot
- No
- Public lane
- O'Keefe Lane, 14.7 m along it
- House footprint
- 253 m²
- Back yard
- 2.2 m
- Buildings on the lot
- 5
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 17 development applications open within 300 m, up to 85 storeys
- In the College station area
- 18 minor variance decisions within 300 m, 94% approved
What this part means for this house, in plain EnglishUnlock
17 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Assault: 3.7 times the Toronto median
- Theft over $5,000: 2.2 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
- Robbery: 2.1 times the Toronto median
- Break and enter: 1.6 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Downtown Yonge East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station4 min walk
- Yonge St at Elm StNearest TTC stop1 min walk
- Gerrard St ENearest cycling route2 min walk
- Tmu - Heaslip HouseSchool3 min walk
- Toronto Metropolitan University - School of Image ArtsSchool3 min walk
- Toronto Metropolitan University - Theatre SchoolSchool3 min walk
- Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32360.8
- Robberycity median 69.5143.3
- Shootingscity median 10.511.9
- Auto theftcity median 192.675.6
- Theft over $5,000city median 46.199.5
- Break and entercity median 172.8274.7
- Theft from vehiclescity median 188.1390.1
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist