HousePrecheckCheck an address

362 Bloor St WAnnex, Toronto · City records before you offer

Also 4 Walmer Rd

Commercial residential · CR 3.0 (c2.0; r2.5) SS2 (x2619)≈ 23.8 × 36.0 m580 m²on Bloor St Wcorner, also on Walmer Rd

1 thing to check before you offer, including building permit open since 2016
N10 m
≈ 23.8 m frontage≈ 36.0 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 362 Bloor St W

362 Bloor St W is on a 23.8 m by 36 m lot on Bloor St W in Annex. The zoning is CR. A site-specific exception, 900.11.10(2619), changes some of the usual rules for this address. The lot also fronts Walmer Rd.

The City has 23 records on this lot since 1983. That is more than at 99% of Toronto houses. In 2023, a building permit was filed: "The proposal contains three illuminated wall signs, all displaying static copy, erected at the second storey of the building at above noted…". Status: closed. In 2016, a building permit was filed: "To erect and display one wall sign and one projecting sign, both illuminated and displaying static copy on the first storey of the southerly elevation. the…". Status: closed. In 2016, a building permit was filed: "Proposal for interior alterations to an existing retail store - "fujifilm"". Status: inspection. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 13 development applications are open (the tallest up to 37 storeys). Spadina station is a 5-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2016ModerateFree check
  • Site-specific exception 900.11.10(2619)Moderate
  • 13 development applications open within 300 mLowFree check
  • Priority retail street: Bloor Street WestLow
  • 1 City tree in front of this lotLowFree check
  • Site and Area Specific Policy 334Low
  • Downtown Plan Secondary PlanLow
  • 2 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2016
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2016

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 2 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

23 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2023-06-23Building permit
23 144476
The proposal contains three illuminated wall signs, all displaying static copy, erected at the second storey of the building at above noted premises.Dimensions:Sign 1: 0.51m L x 3.41m W x 0.09m D at a height of 6.31m, on the south elevation.Sign 2: 0.39m L x 2.59m W x 0.09m D at a height of 6.19m, on the southeast elevation.Sign 3: 0.51m L x 3.41m W x 0.09m D at a height of 6.31m, on the east elevation.****H&R BLOCK****Closed
2016-11-17Building permit
16 196304
To erect and display one wall sign and one projecting sign, both illuminated and displaying static copy on the first storey of the southerly elevation. The wall sign is to mesure 3.96 m by 1.1 m and the projecting sign is to measure .61 m by .61 m. **ANNEX PHOTO**Closed
2016-06-16Building permit
16 166859
Proposal for interior alterations to an existing retail store - "Fujifilm"Inspection
2015-10-19Zoning review
15 239407 LTO
No description on fileClosed
2014-03-24Zoning review
14 132365 LPR
No description on fileClosed
2014-01-09Building permit
13 279459
Proposal for installation of commercial kitchen exhaust system for existing restaurant. Closed
2009-10-07Building permit
09 174122
Interior alterations to existing restuarant on the ground floor (Unit 3) and to increase occupant load to 70 (15% increase).Closed
2009-09-22Building permit
09 165206
Proposal to install one backflow prevention deviceClosed
2009-01-07Building permit
08 161637
Interior alterations to ground floor for new take-out restaurant with incidental seating. UNIT 5. Tenant - "Burrito Boyz". See Committee of Adjustments decision dated December 3rd, 2008, File No. A1017/08TEY. Final and binding.Closed
2008-12-03Minor variance
A1017/08TEY
To convert unit 5 of the building to take-out restaurant uses.Approved
2008-09-09Building permit
08 155704
Revision 08-155704 by changing use of existing retail store, Unit 4 to new restaurant containing 20 seats approved by Committee of Adjustments decision dated: August 19th, 2008 with condition that a maximum of 20 seats be permitted. Final and binding. UNIT # 4Closed
2008-08-13Minor variance
A0707/08TEY
To make interior alterations to unit 4 of the existing two-storey building by converting the retail store on the ground floor into a new restaurant containing 20 seats. For the remainder of the building, the existing ground floor restaurant containing 40 seats, ground floor retail store, and second floor office will be maintained.Approved
2006-04-21Building permit
05 163095
Revision to add an additional Kitchen exhaust. (see BLD 05 163 080)Closed
2006-01-24Zoning review
06 104714 LTO
No description on fileClosed
2005-08-25Zoning review
05 174741 LTO
No description on fileClosed
2005-08-16Building permit
05 163080
Interior alterations to existing restaurant (40 seats) kitchen & washroom area. New kitchen exhaust system. Unit #3Closed
2002-03-20Zoning review
02 119940 ZPR
No description on fileClosed
1999-06-07Zoning review
99 022463 LTO
No description on fileClosed
1998-12-22Zoning review
98 027007 LTO
No description on fileClosed
1994-10-04Zoning review
94 025420 LTO
No description on fileClosed
1991-07-30Zoning review
91 026754 LTO
No description on fileClosed
1991-03-05Zoning review
91 026167 LTO
No description on fileClosed
1983-04-11Zoning review
83 025784 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2619)
  • Priority retail street: Bloor Street West
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2619)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Bloor Street West

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Site and Area Specific Policy 334

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  5. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2619)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
≈ 23.8 m frontage≈ 36.0 m deepon Bloor St W
Zone
CR 3.0 (c2.0; r2.5) SS2 (x2619)
Height limit
16 m
Corner lot
Yes, also on Walmer Rd
Public lane
None
House footprint
556 m²
Back yard
1.4 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 13 development applications open within 300 m, up to 37 storeys
    • In the Spadina station area
    • 21 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 13 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 8 categories
    • Theft over $5,000: 2.5 times the Toronto median
    • Break and enter: 2.2 times the Toronto median
    • Assault: 1.7 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Annex neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$85,000median $84,500
    Households that own their home41%median 54%
    Population (2021)29,300median 16,813
    Homes built in 1960 or before40%median 29%
    Homes needing major repairs6%median 7%

    Getting around and schools

    • Spadina StationNearest station5 min walk
    • Spadina Station - Westbound PlatformNearest TTC stop1 min walk
    • Bloor St WNearest cycling route1 min walk
    • Paul Penna Downtown Jewish Day School & Miles Nadal Jewish Community CentreSchool2 min walk
    • Taddle Creek Montessori SchoolSchool4 min walk
    • University of Toronto SchoolsSchool4 min walk
    • Howlett Academy SchoolSchool5 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.31080.9
    • Robberycity median 69.580.5
    • Homicidecity median 5.35.2
    • Shootingscity median 10.55.2
    • Auto theftcity median 192.6116.9
    • Theft over $5,000city median 46.1114.3
    • Break and entercity median 172.8387.1
    • Theft from vehiclescity median 188.1220.9

    More about Annex

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 362 Bloor St W

    1 thing to check at 362 Bloor St W before you offer

    • Building permit open since 2016Moderate
    • Site-specific exception 900.11.10(2619)Moderate
    • 13 development applications open within 300 mLow
    • Priority retail street: Bloor Street WestLow
    • and 4 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 8 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.