HousePrecheckCheck an address

3595 Bathurst StBedford Park-Nortown, Toronto · City records before you offer

Commercial residential · CR 1.0 (c1.0; r1.0) SS2 (x95)39.6 × 43.6 m1,619 m²on Bathurst Stcorner, also on Dunblaine Ave

1 thing to check before you offer, including building permit open since 2001
N20 m
39.6 m frontage43.6 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 3595 Bathurst St

3595 Bathurst St is on a 39.6 m by 43.6 m lot on Bathurst St in Bedford Park-Nortown. The zoning is CR. A site-specific exception, 900.11.10(95), changes some of the usual rules for this address. The lot also fronts Dunblaine Ave.

The City has 9 records on this lot since 2000. That is more than at 99% of Toronto houses. In 2016, a Committee of Adjustment application was filed: "To construct a new three-storey mixed-use building. the proposed building will include four retail units on the ground floor and 14 residential units on the…". Status: notice prepared. In 2013, a building permit was filed: "Two inch backflow preventor". Status: closed. In 2012, a building permit was filed: "Expansion of existing detailing bay and attic space - shiny time car wash inc". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 2 development applications are open (the tallest up to 10 storeys). Within 300 m, the Committee of Adjustment decided 40 minor variance applications in the last 10 years and approved 95%. The nearest TTC stop is Hotspur Rd at Bathurst St West Side, a 2-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2001ModerateFree check
  • Site-specific exception 900.11.10(95)Moderate
  • 2 development applications open within 300 mLowFree check
  • Site and Area Specific Policy 095Low
  • 2 Committee of Adjustment files on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2001
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2001

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 2 Committee of Adjustment files on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

9 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2016-10-06Minor variance
A0749/16NY
To construct a new three-storey mixed-use building. The proposed building will include four retail units on the ground floor and 14 residential units on the second and third floors. The existing car wash will be demolished.Deferred
2016-06-21Zoning review
16 177661 ZZC
No description on fileCancelled
2013-12-13Building permit
13 277427
Two inch backflow preventorClosed
2012-06-27Building permit
12 158092
Expansion of existing detailing bay and attic space - Shiny Time Car Wash IncClosed
2002-01-10Building permit
02 101197
INSTALL 8 FIXTURES, 1 HWT, 1 BFP FOR A 2 STOREY MIXED USE BUILDING. CAR WASH AT GRADE AND AN OFFICE AT THE 2ND FLOOR LEVEL.Closed
2001-12-03Building permit
01 177791
CONSTRUCT A 2 STOREY MIXED USE BUILDING. CAR WASH AT GRADE AND AN OFFICE AT THE 2ND FLOOR LEVEL.Inspection
2001-10-19Building permit
01 177800
FOUNDATION PERMIT- CONSTRUCT A 2 STOREY MIXED USE BUILDING. CAR WASH AT GRADE AND AN OFFICE AT THE 2ND FLOOR.Closed
2001-03-13Zoning review
01 117789 000
No description on fileClosed
2000-11-23Minor variance
A622/00NY
This is an application under Section 45 of the Planning Act, for variance from the provisions of the North York Zoning By-law 7625, as amended, to permit the construction of a seven bay car wash building. The site is currently vacant.Refused
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(95)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(95)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Site and Area Specific Policy 095

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(95)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
39.6 m frontage43.6 m deepon Bathurst St
Zone
CR 1.0 (c1.0; r1.0) SS2 (x95)
Height limit
10.5 m
Lot coverage limit
33%
Corner lot
Yes, also on Dunblaine Ave
Public lane
None
House footprint
370 m²
Back yard
11.2 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 2 development applications open within 300 m, up to 10 storeys
    • 5 suite and multiplex permits within 300 m in 10 years
    • 40 minor variance decisions within 300 m, 95% approved

    What this part means for this house, in plain EnglishUnlock

    1. 2 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime near median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Bedford Park-Nortown neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$135,000median $84,500
    Households that own their home68%median 54%
    Population (2021)22,145median 16,813
    Homes built in 1960 or before33%median 29%
    Homes needing major repairs5%median 7%

    Getting around and schools

    • Wilson StationNearest station25 min walk
    • Hotspur Rd at Bathurst St West SideNearest TTC stop2 min walk
    • Ridgevale DrNearest cycling route14 min walk
    • Bais Chomesh High School for GirlsSchool3 min walk
    • Associated Hebrew Jr School - Posluns CampusSchool3 min walk
    • St Margaret Catholic Elementary School - Carmichael SiteSchool10 min walk
    • Magnificent Minds SchoolSchool10 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3230.1
    • Robberycity median 69.559.5
    • Auto theftcity median 192.6150.8
    • Theft over $5,000city median 46.167.4
    • Break and entercity median 172.8250
    • Theft from vehiclescity median 188.1198.4

    More about Bedford Park-Nortown

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 3595 Bathurst St

    1 thing to check at 3595 Bathurst St before you offer

    • Building permit open since 2001Moderate
    • Site-specific exception 900.11.10(95)Moderate
    • 2 development applications open within 300 mLow
    • Site and Area Specific Policy 095Low
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 6 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.