HousePrecheckCheck an address

356 Sunnyside AveHigh Park-Swansea, Toronto · City records before you offer

Residential · R (d0.6) (x290)7.4 × 34.8 m248 m²on Sunnyside Avecorner, also on Constance St

1 thing to check before you offer, including building permit open since 2012
N10 m
7.4 m frontage34.8 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 356 Sunnyside Ave

356 Sunnyside Ave is on a 7.4 m by 34.8 m lot on Sunnyside Ave in High Park-Swansea. The zoning is R. A site-specific exception, 900.2.10(290), changes some of the usual rules for this address. The lot also fronts Constance St.

The City has 9 records on this lot since 2001. That is more than at 99% of Toronto houses. In 2012, a building permit was filed: "Permit to construct new garage at rear of 4 unit converted dwelling - please see unsafe order". Status: inspection. In 2004, a building permit was filed: "Interior alterations to exist. converted house & rooming house to add a new unit in basement". Status: closed. In 2003, a Committee of Adjustment application was filed: "To increase the number of dwelling units from 3 units and 1 room to 4 units and 1 room within the existing converted dwelling and rooming house. the additional…". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 46 minor variance applications in the last 10 years and approved 91%. Bloor GO station is a 13-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2012ModerateFree check
  • Site-specific exception 900.2.10(290)Moderate
  • No permit for a second unit on fileLowFree check
  • 3 City trees in front of this lotLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 6 units · Garden suite

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2012
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2012

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

9 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2012-01-11Building permit
11 329718
permit to construct new garage at rear of 4 unit converted dwelling - please see unsafe order.Inspection
2004-07-14Building permit
04 110072
Interior alterations to exist. converted house & rooming house to add a new unit in basement.Closed
2003-04-08Minor variance
A80/03HY
To increase the number of dwelling units from 3 units and 1 room to 4 units and 1 room within the existing converted dwelling and rooming house. The additional unit will be located in the basement.Refused
2002-11-06Building permit
02 181721
Construct detached garage at rear.Closed
2002-08-20Zoning review
02 165437 ZPR
No description on fileClosed
2002-08-12Building permit
02 152295
Make interior alterations and build 3rd floor dormers on South side.Closed
2002-03-06Building permit
02 114801
install fix. bsmt:1 sump pump, replace 4" san. drains--in connection with 01-201800Closed
2002-03-01Building permit
02 114790
install fix. bsmt:1 hot water tank, 1 w.c, 1 bathtub, 1 w.b., 4 fl. drain; 1st fl: 1 w.c., 1 bathtub, 1 w.c., 1 2-comp. kit. sink; 2nd fl: 2 w.c., 2 bathtub, 2 w.b.; 3rd fl: 1 w.c., 1 bathtub, 1 w.b.Closed
2001-12-13Building permit
01 201800
lower and underpin basement, bsement entrances front and rear, reconstruct and enclose 1 storey verandah at front with cold storage below, construct 2nd floor deck at rear, interior alterations and alter elevationClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(290)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(290)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 3 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(290)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Some

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 6 units: likely fits
  • Garden suite: likely fits
  • Secondary suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. Multiplex up to 6 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  2. Garden suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N10 m
7.4 m frontage34.8 m deepon Sunnyside Ave
Zone
R (d0.6) (x290)
Height limit
11 m
Corner lot
Yes, also on Constance St
Public lane
None
New house permit
None since 2000
House footprint
100 m²
Back yard
17 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Some

Building nearby

How much neighbours are building and applying to change within 300 m

  • 4 development applications within 300 m in 10 years, none open
  • 16 suite and multiplex permits within 300 m in 10 years
  • 46 minor variance decisions within 300 m, 91% approved

What this part means for this house, in plain EnglishUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime below median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 6 of 7 categories

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

High Park-Swansea neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$101,000median $84,500
Households that own their home60%median 54%
Population (2021)22,665median 16,813
Homes built in 1960 or before54%median 29%
Homes needing major repairs7%median 7%

Getting around and schools

  • Bloor GO StationNearest station13 min walk
  • Roncesvalles Ave at Grenadier RdNearest TTC stop4 min walk
  • High Park BlvdNearest cycling route6 min walk
  • Howard Jr Public SchoolSchool3 min walk
  • Westminster Classical Christian Academy Elementary SchoolSchool6 min walk
  • High Park Gardens Montessori SchoolSchool6 min walk
  • St Vincent de Paul Catholic Elementary SchoolSchool8 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3465.8
  • Robberycity median 69.546.6
  • Shootingscity median 10.57.8
  • Auto theftcity median 192.689.3
  • Theft over $5,000city median 46.123.3
  • Break and entercity median 172.8229
  • Theft from vehiclescity median 188.1128.1

More about High Park-Swansea

Ready emails

Copy and send as they are.

2 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 356 Sunnyside Ave

1 thing to check at 356 Sunnyside Ave before you offer

  • Building permit open since 2012Moderate
  • Site-specific exception 900.2.10(290)Moderate
  • No permit for a second unit on fileLow
  • 3 City trees in front of this lotLow
  • and 1 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 6 steps to take before you offer, so nothing slips
  • What each of the 5 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.