Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 355 Coxwell Ave
355 Coxwell Ave is on a 27.9 m by 33.4 m lot on Gerrard St E in Woodbine Corridor. The zoning is CR. A site-specific exception, 900.11.10(119), changes some of the usual rules for this address. The lot also fronts Coxwell Ave.
The City has 28 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2026, a development application was filed: "Draft plan of condominium for 33 residential units". Status: draft plan approved. In 2026, a development application was filed: "To modify the mixed-used development approved by site specific zoning by-laws 1227-2017 and 1228-2017 in order to construct a new six-storey affordable housing…". Status: closed. In 2025, a building permit was filed: "Part permit - construct 6 storey building (affordable housing) for habitat for humanity". Status: closed. Nothing on file is open right now.
Within 300 m, 3 development applications are open (the tallest up to 10 storeys). Within 300 m, the Committee of Adjustment decided 47 minor variance applications in the last 10 years and approved 96%. The nearest TTC stop is Gerrard St East at Coxwell Ave, a 1-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(119)Moderate
- 3 development applications open within 300 mLowFree check
- 3 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
3 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
28 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-06-23 | Development application26 189678 STE 19 CD | Draft Plan of Condominium for 33 residential units. | Draft Plan Approved | |
| 2026-05-19 | Development application26 162911 STE 19 SA | To modify the mixed-used development approved by Site Specific Zoning By-laws 1227-2017 and 1228-2017 in order to construct a new six-storey affordable housing building with 33 dwelling units by - Relocating gas meter box from the rear north side to the west side of the building; - Relocating the pet amenity space from the ground floor to the rooftop; - Revising the emergency generator and associated acoustic screening on the mechanical penthouse; and- Adding additional privacy screen details. | Closed | |
| 2025-04-23 | Building permit24 192325 | Part Permit - Construct 6 storey building (affordable housing) for Habitat for Humanity | Closed | |
| 2024-12-04 | Minor varianceA0931/24TEY | To alter the development standards (as approved under Site Specific Zoning By-laws 1227-2017 and 1228-2017), for a new 6-storey residential building, by increasing the residential gross floor area, reducing the width of the bicycle space, as well as, eliminating the bicycle maintenance facilities, landscape strip, and parking space setback. There will be a total of 33 affordable residential dwelling units on this lot. | Approved | |
| 2021-10-06 | Minor varianceA0811/21TEY | To modify the mixed-used development approved by Site Specific Zoning By-laws 1227-2017 and 1228-2017 in order to construct a new six-storey affordable housing building with 33 dwelling units by altering the location of the building mass and balconies, increasing gross floor area, eliminating the indoor amenity space and non-residential gross floor area, and altering the number and location of bicycle parking spaces. | Approved | |
| 2018-05-24 | Building permit18 164530 | Building requires a standpipe system, | Cancelled | |
| 2018-03-27 | Building permit18 135041 | Proposal for a new, 6 storey, mixed use building with retail on the ground floor, offices on the 6th floor, and 33 residential units.(non-for proit units) | Cancelled | |
| 2018-02-22 | Zoning review16 198307 PSP | No description on file | Closed | |
| 2016-08-05 | Zoning review16 198323 PRZ | No description on file | Closed | |
| 2016-07-28 | Development application16 198323 STE 32 OZ | Proposal for a 6 storey mixed use building containing 33 residential units, 1 retail unit at the ground level and office units on the 6th level with a gross density of 2.5 times the lot area and 9 surface parking spaces. | Closed | |
| 2016-07-28 | Development application16 198307 STE 32 SA | Proposal for a 6-storey residential building, containing 33 affordable housing units with FSI of 3.5 times the area of the lot, including 44 bicycle parking and 7 at-grade parking spaces. | Closed | |
| 2015-09-21 | Building permit15 213357 | Permit to construct new outdoor Patio for existing restaurant. (committee of adjustment approved this patio) | Closed | |
| 2015-08-19 | Minor varianceA0608/15TEY | To construct a front outdoor patio servicing the restaurant of the existing one-storey commercial building. | Approved | |
| 2015-02-13 | Zoning review15 117556 ZPR | No description on file | Closed | |
| 2012-04-02 | Zoning review12 147534 LPR | No description on file | Closed | |
| 2011-09-07 | Zoning review11 270043 LPR | No description on file | Closed | |
| 2011-05-19 | Zoning review11 198466 LTO | No description on file | Closed | |
| 2010-02-25 | Zoning review10 123443 LTO | No description on file | Closed | |
| 2009-12-14 | Zoning review09 196244 LTO | No description on file | Closed | |
| 2009-09-03 | Building permit09 155207 | Proposal to install a backflow preventor. | Closed | |
| 2007-03-21 | Zoning review07 117512 LTO | No description on file | Closed | |
| 2005-09-21 | Zoning review05 182440 LTO | No description on file | Closed | |
| 2002-11-15 | Building permit02 185024 | upgrade restaurant fire suppression system on 1st floor | Closed | |
| 2002-09-06 | Zoning review02 170566 LTO | No description on file | Closed | |
| 2001-12-11 | Zoning review01 201428 LTO | No description on file | Closed | |
| 2001-11-06 | Zoning review01 192585 ZPR | No description on file | Closed | |
| 1982-02-23 | Zoning review82 025763 LTO | No description on file | Closed | |
| 1981-04-16 | Zoning review81 030189 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(119)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(119)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(119)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 1.5 (c0.5; r1.5) SS2 (x119)
- Height limit
- 11 m
- Corner lot
- Yes, also on Coxwell Ave
- Public lane
- Ln N Gerrard E Coxwell, 35.4 m along it
- House footprint
- 489 m²
- Back yard
- 0.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 3 development applications open within 300 m, up to 10 storeys
- 10 suite and multiplex permits within 300 m in 10 years
- 47 minor variance decisions within 300 m, 96% approved
What this part means for this house, in plain EnglishUnlock
3 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Woodbine Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Coxwell StationNearest station16 min walk
- Gerrard St East at Coxwell AveNearest TTC stop1 min walk
- Woodfield RdNearest cycling route7 min walk
- Georges Etienne Cartier Catholic Elementary SchoolSchool4 min walk
- Roden Public & Equinox Holistic AlternativeSchool5 min walk
- Monarch Park Collegiate & School of Life ExperienceSchool7 min walk
- Bowmore Road Jr & Sr Public SchoolSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3728.8
- Robberycity median 69.521.9
- Auto theftcity median 192.665.6
- Theft over $5,000city median 46.143.7
- Break and entercity median 172.8123.9
- Theft from vehiclescity median 188.1131.2
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist