HousePrecheckCheck an address

332 Yonge StYonge-Bay Corridor, Toronto · City records before you offer

Commercial residential · CR 4.0 (c4.0; r1.5) SS1 (x2553)7.9 × 61.7 m477 m²on Yonge Stcorner, also on Gould Stbacks onto Harry Barberian Lane

1 thing to check before you offer, including work or applications in progress
N20 m
7.9 m frontage61.7 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 332 Yonge St

332 Yonge St is on a 7.9 m by 61.7 m lot on Yonge St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(2553), changes some of the usual rules for this address. The lot also fronts Gould St.

The City has 17 records on this lot since 1986. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor". Status: permit issued. In 2026, a Committee of Adjustment application was filed: "To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground…". Status: closed. In 2026, a building permit was filed: "Proposed sprinkler installation related to permit #26-105591 bld 01 ba". Status: permit issued. 4 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 23 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 14 minor variance applications in the last 10 years and approved 93%. TMU station is a 2-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2553)Moderate
  • 23 development applications open within 300 mLowFree check
  • Priority retail street: Yonge StreetLow
  • Site and Area Specific Policy 174Low
  • Downtown Plan Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

17 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-11-05Building permit
26 144218
Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor.Permit Issued
2026-10-14Minor variance
A0542/26TEY
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.Approved
2026-08-25Building permit
26 208394
Proposed sprinkler installation related to permit #26-105591 BLD 01 BAPermit Issued
2026-08-07Building permit
26 214668
2 Projecting Signs +1 Wall Sign** HWARO KOREAN BBQ **Inspection
2026-07-09Building permit
26 199384
1 Wall Sign ** HWARO KOREAN BBQ **Cancelled
2026-05-21Building permit
26 105591
REV01: Proposed revision corridor door relocation in basement, removal of ground floor stairwell wall, removal of fire-rated shaft wall with inclusion of fire dampers at fire separation penetrations, HVAC equipment and duct layout revisionProposal for Interior fit-out permit for basement and ground floor - new restaurant.Closed
2026-01-07Building permit
25 251241
Shell alteration: interior wall demolition, stair modifications, removal of decommissioned elevator. Separation of 2nd floor tenancy.Inspection
2025-04-15Zoning review
25 144863 ZAP
No description on fileApplication On Hold
2017-09-21Building permit
17 194718
In conjunction with a three storey building on the premises, proposal to erect and display one non-illuminated wall sign displaying static copy, located on the first storey side wall of the east elevation. The proposed sign is 0.15 metres vertically by 0.71 metres horizontally at a height of 1.63 metres above grade.**GLOBO**Closed
2003-04-25Building permit
03 100829
make interior alterations to existing retail; alter store front. Tenant: Aldo shoesSURVEY APPROVED.Closed
2002-12-10Building permit
02 124369
alter plans approved under bp 407373, by installing conveyor belt -& chute tenant: aldo shoe outlet ( changes bubbled) unit 173-187Closed
1998-02-12Building permit
97 025540
INSTALL HVAC REFER TO APPLICATION NUMBER: 407373Closed
1998-01-08Building permit
97 025538
MAKE INTERIOR ALTERATIONS AND ALTER FRONT ELEVATION. BPClosed
1993-10-18Zoning review
93 025695 LTO
No description on fileClosed
1993-04-05Zoning review
93 024949 LTO
No description on fileClosed
1989-05-12Zoning review
89 030038 LTO
No description on fileClosed
1986-07-09Zoning review
86 028240 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2553)
  • Priority retail street: Yonge Street
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2553)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Yonge Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 174

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2553)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
7.9 m frontage61.7 m deepon Yonge St
Zone
CR 4.0 (c4.0; r1.5) SS1 (x2553)
Height limit
20 m
Corner lot
Yes, also on Gould St
Public lane
Harry Barberian Lane, 7.6 m along it
House footprint
316 m²
Back yard
0 m
Buildings on the lot
3

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 23 development applications open within 300 m, up to 85 storeys
    • In the College station area
    • 14 minor variance decisions within 300 m, 93% approved

    What this part means for this house, in plain EnglishUnlock

    1. 23 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 8 categories
    • Assault: 5.3 times the Toronto median
    • Theft over $5,000: 4.6 times the Toronto median
    • Robbery: 4.3 times the Toronto median
    • Break and enter: 3.2 times the Toronto median
    • Homicide: 2.3 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Yonge-Bay Corridor neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$68,500median $84,500
    Households that own their home32%median 54%
    Population (2021)12,645median 16,813
    Homes built in 1960 or before2%median 29%
    Homes needing major repairs2%median 7%

    Getting around and schools

    • TMU StationNearest station2 min walk
    • Yonge St at Gould StNearest TTC stop1 min walk
    • Gerrard St WNearest cycling route3 min walk
    • Tmu - Heaslip HouseSchool3 min walk
    • Toronto Metropolitan University - Entr To Business School LobbySchool3 min walk
    • Toronto Metropolitan University - School of Image ArtsSchool4 min walk
    • Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool4 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.33361.1
    • Robberycity median 69.5300.1
    • Homicidecity median 5.312
    • Shootingscity median 10.512
    • Auto theftcity median 192.6162.1
    • Theft over $5,000city median 46.1210.1
    • Break and entercity median 172.8552.2
    • Theft from vehiclescity median 188.1402.1

    More about Yonge-Bay Corridor

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 332 Yonge St

    1 thing to check at 332 Yonge St before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2553)Moderate
    • 23 development applications open within 300 mLow
    • Priority retail street: Yonge StreetLow
    • and 3 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 7 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.