Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 332 Yonge St
332 Yonge St is on a 7.9 m by 61.7 m lot on Yonge St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(2553), changes some of the usual rules for this address. The lot also fronts Gould St.
The City has 17 records on this lot since 1986. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor". Status: permit issued. In 2026, a Committee of Adjustment application was filed: "To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground…". Status: closed. In 2026, a building permit was filed: "Proposed sprinkler installation related to permit #26-105591 bld 01 ba". Status: permit issued. 4 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 23 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 14 minor variance applications in the last 10 years and approved 93%. TMU station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(2553)Moderate
- 23 development applications open within 300 mLowFree check
- Priority retail street: Yonge StreetLow
- Site and Area Specific Policy 174Low
- Downtown Plan Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
17 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-11-05 | Building permit26 144218 | Proposal for interior alterations, fit out for new eating establishment with karaoke rooms on the 2nd floor. | Permit Issued | |
| 2026-10-14 | Minor varianceA0542/26TEY | To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building. | Approved | |
| 2026-08-25 | Building permit26 208394 | Proposed sprinkler installation related to permit #26-105591 BLD 01 BA | Permit Issued | |
| 2026-08-07 | Building permit26 214668 | 2 Projecting Signs +1 Wall Sign** HWARO KOREAN BBQ ** | Inspection | |
| 2026-07-09 | Building permit26 199384 | 1 Wall Sign ** HWARO KOREAN BBQ ** | Cancelled | |
| 2026-05-21 | Building permit26 105591 | REV01: Proposed revision corridor door relocation in basement, removal of ground floor stairwell wall, removal of fire-rated shaft wall with inclusion of fire dampers at fire separation penetrations, HVAC equipment and duct layout revisionProposal for Interior fit-out permit for basement and ground floor - new restaurant. | Closed | |
| 2026-01-07 | Building permit25 251241 | Shell alteration: interior wall demolition, stair modifications, removal of decommissioned elevator. Separation of 2nd floor tenancy. | Inspection | |
| 2025-04-15 | Zoning review25 144863 ZAP | No description on file | Application On Hold | |
| 2017-09-21 | Building permit17 194718 | In conjunction with a three storey building on the premises, proposal to erect and display one non-illuminated wall sign displaying static copy, located on the first storey side wall of the east elevation. The proposed sign is 0.15 metres vertically by 0.71 metres horizontally at a height of 1.63 metres above grade.**GLOBO** | Closed | |
| 2003-04-25 | Building permit03 100829 | make interior alterations to existing retail; alter store front. Tenant: Aldo shoesSURVEY APPROVED. | Closed | |
| 2002-12-10 | Building permit02 124369 | alter plans approved under bp 407373, by installing conveyor belt -& chute tenant: aldo shoe outlet ( changes bubbled) unit 173-187 | Closed | |
| 1998-02-12 | Building permit97 025540 | INSTALL HVAC REFER TO APPLICATION NUMBER: 407373 | Closed | |
| 1998-01-08 | Building permit97 025538 | MAKE INTERIOR ALTERATIONS AND ALTER FRONT ELEVATION. BP | Closed | |
| 1993-10-18 | Zoning review93 025695 LTO | No description on file | Closed | |
| 1993-04-05 | Zoning review93 024949 LTO | No description on file | Closed | |
| 1989-05-12 | Zoning review89 030038 LTO | No description on file | Closed | |
| 1986-07-09 | Zoning review86 028240 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2553)
- Priority retail street: Yonge Street
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2553)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Yonge Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 174
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2553)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.0 (c4.0; r1.5) SS1 (x2553)
- Height limit
- 20 m
- Corner lot
- Yes, also on Gould St
- Public lane
- Harry Barberian Lane, 7.6 m along it
- House footprint
- 316 m²
- Back yard
- 0 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 23 development applications open within 300 m, up to 85 storeys
- In the College station area
- 14 minor variance decisions within 300 m, 93% approved
What this part means for this house, in plain EnglishUnlock
23 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 8 categories
- Assault: 5.3 times the Toronto median
- Theft over $5,000: 4.6 times the Toronto median
- Robbery: 4.3 times the Toronto median
- Break and enter: 3.2 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Bay Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station2 min walk
- Yonge St at Gould StNearest TTC stop1 min walk
- Gerrard St WNearest cycling route3 min walk
- Tmu - Heaslip HouseSchool3 min walk
- Toronto Metropolitan University - Entr To Business School LobbySchool3 min walk
- Toronto Metropolitan University - School of Image ArtsSchool4 min walk
- Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.33361.1
- Robberycity median 69.5300.1
- Homicidecity median 5.312
- Shootingscity median 10.512
- Auto theftcity median 192.6162.1
- Theft over $5,000city median 46.1210.1
- Break and entercity median 172.8552.2
- Theft from vehiclescity median 188.1402.1
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist