Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 330 Yonge St
330 Yonge St is on a 5.7 m by 30.5 m lot on Yonge St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(2553), changes some of the usual rules for this address. The lot also fronts Gould St.
The City has 19 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposed interior alterations adding washroom, barrier free and powder room, in rear of shop". Status: permit issued. In 2018, a building permit was filed: "In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy, located on the first…". Status: closed. In 2014, a building permit was filed: "Proposal for interior alterations to exsiting retail store on the second floor. not to be used in conjunction with ground floor restaurant". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 22 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 15 minor variance applications in the last 10 years and approved 93%. TMU station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(2553)Moderate
- 22 development applications open within 300 mLowFree check
- Priority retail street: Yonge StreetLow
- Site and Area Specific Policy 174Low
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
19 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-06-23 | Building permit26 184702 | Proposed interior alterations adding washroom, barrier free and powder room, in rear of shop. | Permit Issued | |
| 2026-06-04 | Building permit26 177651 | Proposal for interior alteration - adding barrier free washroom to the ground floor retail store. | Cancelled | |
| 2025-07-15 | By-law investigation25 194514 SIN 00 IR | Signs | Closed | |
| 2025-07-09 | By-law investigation25 191235 SIN 00 IR | Signs | Closed | |
| 2024-02-05 | Zoning review24 111767 LPR | No description on file | Closed | |
| 2024-01-05 | Zoning review24 101260 LTO | No description on file | Closed | |
| 2021-02-26 | Zoning review21 120583 ZPR | No description on file | Closed | |
| 2020-05-12 | Building permit20 144629 | To erect and display one illuminated wall sign displaying static copy. Erected on the first storey of the east elevation of the building.****HOBO**** | Cancelled | |
| 2018-02-27 | Building permit18 111259 | In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign displaying static copy, located on the first storey of the east elevation. The proposed sign is 0.61 metres vertically by 4.8 metres horizontally at a height of 4.22 metres above grade.*****EXCLUCITY**** | Closed | |
| 2017-03-13 | Zoning review17 127984 LTO | No description on file | Closed | |
| 2016-11-04 | Zoning review16 247327 LPR | No description on file | Closed | |
| 2014-12-24 | Building permit14 186100 | Proposal for interior alterations to exsiting retail store on the second floor. NOT to be used in conjunction with ground floor restaurant. | Closed | |
| 2014-10-17 | Building permit14 236131 | To erect and display one illuminated wall sign on the east facing second storey parapet building wall, in conjunction with a business located on the premises.**Round About** | Cancelled | |
| 2014-10-10 | Zoning review14 236104 ZSV | No description on file | Closed | |
| 2009-11-20 | Zoning review09 190031 ZSV | No description on file | Closed | |
| 2009-11-06 | Zoning review09 186139 ZPR | No description on file | Closed | |
| 2009-10-01 | Building permit09 158651 | Proposal for interior alterations to ground floor retail unit for new ice cream shop. "Marble Slab Creamery" | Closed | |
| 1999-04-21 | Zoning review99 022268 LTO | No description on file | Closed | |
| 1981-08-31 | Zoning review81 030636 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2553)
- Priority retail street: Yonge Street
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2553)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Yonge Street
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Site and Area Specific Policy 174
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2553)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 4.0 (c4.0; r1.5) SS1 (x2553)
- Height limit
- 20 m
- Corner lot
- Yes, also on Gould St
- Public lane
- None
- House footprint
- 170 m²
- Back yard
- 0 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 22 development applications open within 300 m, up to 85 storeys
- In the College station area
- 15 minor variance decisions within 300 m, 93% approved
What this part means for this house, in plain EnglishUnlock
22 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 8 categories
- Assault: 5.3 times the Toronto median
- Theft over $5,000: 4.6 times the Toronto median
- Robbery: 4.3 times the Toronto median
- Break and enter: 3.2 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Bay Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station2 min walk
- Yonge St at Gould StNearest TTC stop1 min walk
- Gerrard St WNearest cycling route3 min walk
- Tmu - Heaslip HouseSchool3 min walk
- Toronto Metropolitan University - Entr To Business School LobbySchool3 min walk
- Toronto Metropolitan University - School of Image ArtsSchool3 min walk
- Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.33361.1
- Robberycity median 69.5300.1
- Homicidecity median 5.312
- Shootingscity median 10.512
- Auto theftcity median 192.6162.1
- Theft over $5,000city median 46.1210.1
- Break and entercity median 172.8552.2
- Theft from vehiclescity median 188.1402.1
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist