Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 330 King St W
330 King St W is on a 19 m by 27.3 m lot on John St in Wellington Place. The zoning is CRE. A site-specific exception, 900.12.10(89), changes some of the usual rules for this address. The lot also fronts King St W.
The City has 20 records on this lot since 2010. That is more than at 99% of Toronto houses. In 2023, a building permit was filed: "Maglock and pull station installation - level 3 parking". Status: closed. In 2023, a building permit was filed: "Installation of 1 20 x 70 frame tent anchored with pre-existing permanent anchors at the tiff bell lightow for their 6th floor terrace, proposed intall on…". Status: closed. In 2021, a building permit was filed: "Proposal to install 1 maglock on p1 level elevator lobby of existing multi-unit building". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 26 development applications are open (the tallest up to 80 storeys). St. Andrew station is a 6-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2011ModerateFree check
- Site-specific exception 900.12.10(89)Moderate
- 26 development applications open within 300 mLowFree check
- Priority retail street: John Street, King Street WestLow
- King-Spadina Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2011
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2011
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
20 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-10-18 | By-law investigation25 241717 SIN 00 IR | Signs | Closed | |
| 2025-07-23 | Zoning review25 198724 LPR | No description on file | Application On Hold | |
| 2023-07-05 | Building permit23 145994 | Maglock and Pull Station installation - Level 3 Parking | Closed | |
| 2023-04-14 | Building permit23 129029 | Installation of 1 20 x 70 frame tent anchored with pre-existing permanent anchors at the TIFF Bell Lightow for their 6th floor Terrace, Proposed intall on April 24, 2023 and removal on October 31, 2023 | Closed | |
| 2021-08-19 | Building permit21 182315 | Proposal to install 1 maglock on P1 Level elevator lobby of existing multi-unit building | Closed | |
| 2019-04-10 | Building permit19 137137 | 1 SEASONAL CERTIFIED TEMPORARY TENT, 20 ft x 70 ft ARCHTOP FRAME TENT (Cert # 14 251038) - ANCHORED TO THE FLOOR SLAB WITH PRE-INSTALLED CONNECTIONSINSTALLED April 17th to October 17th, 2019. | Closed | |
| 2019-04-05 | Building permit19 114361 | Proposal for rehabilitation of the interior stone slab finishes on the ground floor and tenth floor common element areas. | Closed | |
| 2017-04-20 | Building permit17 141648 | 1 SEASONAL CERTIFIED TEMPORARY TENT,20 ft x 70 ft ARCHTOP FRAME TENT (Cert # 14 251038)ANCHORED TO THE FLOOR SLAB WITH PRE-INSTALLED CONNECTIONSINSTALLED April 18th to October 25th, 2017. | Closed | |
| 2016-04-06 | Building permit16 135081 | Erect certified temporary tent 20 x 70 to podium roof. Install Apr 20/16. Duration 180 days. | Closed | |
| 2015-04-15 | Building permit15 138798 | 1 CERTIFIED TEMPORARY TENT, 1 _ 20 ft x 70 ft Archtop Frame Tent (Cert # 14 251038) April 20th to October 26th, 2015. | Closed | |
| 2014-04-25 | Building permit14 146648 | erect certified temporary tent, "TIFF Lightbox" Apr 30-Oct 15/14 | Closed | |
| 2013-04-22 | Building permit13 151864 | Proposal to install 1 20' X 70' certified tent (#11-167172) from April 25, 2013 to October 1, 2013 on 6th floor roof top terrace for the Tiff Bell Lightbox. | Closed | |
| 2012-08-22 | Building permit12 222308 | Proposal to install 1 mag lock in existing commercial space on the 6th floor. TIFF Building. Convenience address - 80 John St. | Closed | |
| 2012-04-16 | Building permit12 149765 | Proposal to erect 1 cert tent (20'x70') on 6th floor roof patio. Cert # 11 167172. April 9/12 -July 9/12 Approx. (3 months only) | Closed | |
| 2011-11-29 | Building permit11 301024 | HVAC - CONVENIENCE ADDRESS IS 350 King St E - permit for interior alterations to existing retail store - Unit 105.- DAR optics | Closed | |
| 2011-09-30 | Building permit11 267635 | permit to install 2 maglocks - 1 on floor 4 and 1 on floor 5. In office area in existing office area of existing mixed use building - TIFF BELL LIGHTBOX. | Closed - Dormant | |
| 2011-09-21 | Building permit11 262673 | Proposal to install 1 maglock in existing office space on the 4th floor. Toronto International Film Festival building. Convenience addres is 350 King St. W. | Permit Issued | |
| 2011-05-02 | Building permit11 181963 | Proposal to install 1 certified tent (#11-167172)on the 6th floor patio. Toronto International Film Festival building. Setup date April 27, 2011. Dismantle date May 10,2011. | Closed | |
| 2011-03-24 | Building permit11 136838 | Proposal to install 5 maglocks in existing mixed use building. 3 locks on 6th floor, 1 lock on ground floor, and 1 lock on level P1. | Closed | |
| 2010-09-16 | Building permit10 240026 | Proposal for interior alterations to the 6th floor plus mezzanine level. To be used for a special events space and dinning. Toronto International Film Festival building. | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.12.10(89)
- Priority retail street: John Street, King Street West
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.12.10(89)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: John Street, King Street West
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
King-Spadina Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.12.10(89)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CRE (x89)
- Height limit
- 30 m
- Corner lot
- Yes, also on King St W
- Public lane
- None
- House footprint
- 397 m²
- Back yard
- 0 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 26 development applications open within 300 m, up to 80 storeys
- In the Queen-Spadina station area
- 1 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
26 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 8 categories
- Theft over $5,000: 1.9 times the Toronto median
- Assault: 1.8 times the Toronto median
- Break and enter: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Wellington Place neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St. Andrew StationNearest station6 min walk
- King St West at John St West SideNearest TTC stop1 min walk
- Adelaide St WNearest cycling route2 min walk
- OCAD University - Inclusive Design InstituteSchool9 min walk
- Ogden Jr Public SchoolSchool9 min walk
- OCAD University - Student CentreSchool9 min walk
- OCAD University - Aboveground Art SuppliesSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31169.6
- Robberycity median 69.582
- Homicidecity median 5.35.3
- Shootingscity median 10.510.6
- Auto theftcity median 192.697.9
- Theft over $5,000city median 46.187.3
- Break and entercity median 172.8293.7
- Theft from vehiclescity median 188.1211.7
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist