HousePrecheckCheck an address

328 Bloor St WAnnex, Toronto · City records before you offer

Also 328 1/2 Bloor St W

Commercial residential · CR 3.0 (c2.0; r2.5) SS2 (x2615)7.6 × 39.7 m302 m²on Bloor St W

1 thing to check before you offer, including work or applications in progress
N20 m
7.6 m frontage39.7 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 328 Bloor St W

328 Bloor St W is on a 7.6 m by 39.7 m lot on Bloor St W in Annex. The zoning is CR. A site-specific exception, 900.11.10(2615), changes some of the usual rules for this address.

The City has 16 records on this lot since 1994. That is more than at 99% of Toronto houses. In 2021, a development application was filed: "Site plan approval for a 37-storey mixed-use building atop an 8-storey base building, having a non-residential gross floor area of 627.9 square metres and a…". Status: under review. In 2021, a development application was filed: "Zoning by-law amendment to permit a 36-storey mixed-use building, containing 345 dwelling units and 250 square metres of non-residential gross floor area". Status: under review. In 2021, a development application was filed: "Draft plan of subdivision for 1 development block". Status: under review. Nothing on file is open right now.

Within 300 m, 8 development applications are open (the tallest up to 37 storeys). Spadina station is a 4-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2615)Moderate
  • 8 development applications open within 300 mLowFree check
  • Priority retail street: Bloor Street WestLow
  • Site and Area Specific Policy 334Low
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

16 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2022-04-11Zoning review
21 245851 PSP
No description on fileClosed
2021-12-07Development application
21 245851 STE 11 SA
Site Plan Approval for a 37-storey mixed-use building atop an 8-storey base building, having a non-residential gross floor area of 627.9 square metres and a residential gross floor area of 31,231.27 square metres. A total of 366 residential units are proposed.Under Review
2021-11-22Zoning review
21 234506 PRZ
No description on fileClosed
2021-11-05Development application
21 234506 STE 11 OZ
Zoning By-law amendment to permit a 36-storey mixed-use building, containing 345 dwelling units and 250 square metres of non-residential gross floor area.Under Review
2021-11-05Development application
21 234509 STE 11 SB
Draft Plan of Subdivision for 1 development block.Under Review
2006-03-31Building permit
01 148747
REVISION to install fire escape stairs - Alter plans 01-148747, 425503 and 416043 by altering layout on 1st and 2nd floor restaurant. Also add an additional interior stair from ground to 2nd floor. tenant: pizza pizza N.B. There is no access to the 3rd floor.Cancelled
2005-09-23Building permit
01 148759
install kitchen exhaust system on 1st, & alter hvac system 2nd floor tenant: pizza pizzaClosed
2001-12-18Building permit
01 148755
install fixtures: 2nd floor: 3wc, 2 wb, 1 janitor sink, 1 hand sink tenant: pizza pizza cost included in bp 01-148747Closed
2001-05-22Zoning review
01 012719 LTO
No description on fileClosed
1999-06-17Building permit
99 016397
ALTER H.V.A.C. SYSTEM. REFER TO APPLICATION NUMBER: 425503Closed
1999-06-07Building permit
99 016392
ALTER PLANS AS APPROVED UNDER 416043 BY MAKING LAYOUT CHANGES AND REDUCING THE SIZE OF RESTAURANT. FEE$ 120.00Closed
1999-05-18Building permit
99 016394
INSTALL PLUMBING FIXTURES ON 1ST FLOOR- 3 HUB DRAINS, 2 HAND SIN KS, 1 JANITOR SINK, 1 2-COMPT. K.S., 1 GREASE INT.,1 D.W. REFER TO APPLICATION NUMBER: 425503Closed
1999-05-03Building permit
99 014194
INSTALL SPRINKLER SYSTEM IN BASEMENT, 1ST AND 2ND FLOOR FOR EXISTING RESTAURANT. SEE 416043 TENANT: PIZZA PIZZA. EDCClosed
1999-04-09Building permit
98 020444
MAKE INTERIOR ALTERATIONS TO EXISTING RESTAURANT. BP 225.74M\2Closed
1998-01-12Zoning review
98 025510 LTO
No description on fileClosed
1994-05-27Zoning review
94 024986 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2615)
  • Priority retail street: Bloor Street West
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2615)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Bloor Street West

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 334

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2615)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
7.6 m frontage39.7 m deepon Bloor St W
Zone
CR 3.0 (c2.0; r2.5) SS2 (x2615)
Height limit
18 m
Corner lot
No
Public lane
None
House footprint
253 m²
Back yard
0.8 m
Buildings on the lot
3

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 8 development applications open within 300 m, up to 37 storeys
    • In the Spadina station area
    • 15 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 8 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 8 categories
    • Theft over $5,000: 2.5 times the Toronto median
    • Break and enter: 2.2 times the Toronto median
    • Assault: 1.7 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Annex neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$85,000median $84,500
    Households that own their home41%median 54%
    Population (2021)29,300median 16,813
    Homes built in 1960 or before40%median 29%
    Homes needing major repairs6%median 7%

    Getting around and schools

    • Spadina StationNearest station4 min walk
    • Spadina StationNearest TTC stop1 min walk
    • Bloor St WNearest cycling route1 min walk
    • Paul Penna Downtown Jewish Day School & Miles Nadal Jewish Community CentreSchool2 min walk
    • University of Toronto SchoolsSchool2 min walk
    • Howlett Academy SchoolSchool2 min walk
    • Taddle Creek Montessori SchoolSchool3 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.31080.9
    • Robberycity median 69.580.5
    • Homicidecity median 5.35.2
    • Shootingscity median 10.55.2
    • Auto theftcity median 192.6116.9
    • Theft over $5,000city median 46.1114.3
    • Break and entercity median 172.8387.1
    • Theft from vehiclescity median 188.1220.9

    More about Annex

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 328 Bloor St W

    1 thing to check at 328 Bloor St W before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2615)Moderate
    • 8 development applications open within 300 mLow
    • Priority retail street: Bloor Street WestLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.