HousePrecheckCheck an address

322 Church StDowntown Yonge East, Toronto · City records before you offer

Also 63 Gould St

33.8 × 36.0 m1,205 m²on Church Stcorner, also on Gould St

4 things to check before you offer, including 2 building permits open, the oldest since 2011
N20 m
33.8 m frontage36.0 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 322 Church St

322 Church St is on a 33.8 m by 36 m lot on Church St in Downtown Yonge East. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Gould St. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.

The City has 21 records on this lot since 1998. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "2 wall signs ** student community centre ** ** oakham house **". Status: permit issued. In 2022, a development application was filed: "This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former city of…". Status: closed. In 2020, a building permit was filed: "Proposal for interior alterations to existing restaurant on ground floor". Status: closed. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 10 development applications are open (the tallest up to 85 storeys). Within 300 m, the Committee of Adjustment decided 18 minor variance applications in the last 10 years and approved 94%. TMU station is a 4-minute walk.

Summary

What the City's records show on this house

  • 2 building permits open, the oldest since 2011ModerateFree check
  • Heritage property: designated (Part IV)Moderate
  • Work or applications in progressModerateFree check
  • Zoning not in By-law 569-2013Moderate
  • 10 development applications open within 300 mLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

4 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • 2 building permits open, the oldest since 2011
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. 2 building permits open, the oldest since 2011

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

21 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-07-29Building permit
26 202495
2 Wall Signs ** STUDENT COMMUNITY CENTRE ** ** OAKHAM HOUSE **Permit Issued
2025-09-12By-law investigation
25 224380 WST 00 IR
WasteClosed
2022-12-23Development application
22 242103 STE 13 OZ
This is an application that is to address two main objectives: 1) to bring the portion of the university's lands currently zoned under the former City of Toronto Zoning By-law 438-86 into the City-wide Zoning By-law 569-2013; and 2) to establish bicycle parking, loading space, and automobile parking rates for lands owned and operated by Toronto Metropolitan University as an overlay approach in By-law 569-2013. No development is proposed as part of this application.Closed
2020-03-11Building permit
20 118012
Proposal for interior alterations to existing restaurant on ground floorClosed
2019-09-30Building permit
19 219988
Proposal for new support lintels on the east elevation of existing Student's Centre - Ryerson University. Conveniece address is 63 Gould St.Closed
2014-12-08Building permit
14 257904
Installation of new handrails and refinishing of existing stairs for Ryerson University Student CentreClosed
2014-04-01Building permit
14 132883
Proposed installation of one premise isolation back flow preventer for the Oakham House - Ryerson UniversityClosed
2014-02-10Zoning review
14 115441 LPR
No description on fileClosed
2013-09-27Building permit
13 143408
Revision to reconfigure partitions, exit stair width, and increase occupant load from 288 to 318.Closed
2013-03-06Zoning review
13 129215 LPR
No description on fileClosed
2013-02-13Building permit
13 112853
Proposal to construct a new mini-bar in existing pubPermit Issued
2011-12-16Building permit
11 323179
Proposal for interior alterations to washrooms on third floor of existing office building (30.84m2). Convenience address: 63 Gould StreetClosed
2011-10-27Building permit
11 295598
Proposal to replace 30 windows on south and east elevations, also install solar panels on south elevation for Ryerson University for their conference/banquet room. Convenience address: 63 Gould StreetClosed
2011-04-19Building permit
11 174416
Permit for one backflow device in basement of existing university buildingPermit Issued
2003-08-07Building permit
03 145768
Remove existing fire stair (basement to third floor); maintain all fire safety systems.Closed
2003-07-23Building permit
03 148810
make interior alterations to the 2nd floor in the washrooms and to remove 2 posts with resultant roof truss reinforcement by 2 new steel channels C15 as beams. "Oakham Lounge"Closed
2001-10-16Building permit
01 184553
Make interior alterations to portion of the basement to create a designated smoking room in existing restaurant on first floor & basement. (1st fl. - Oakham Cafe - Bsmt: Ram In The Rye) "health dept. approved rec'd"Closed
2001-03-16Building permit
01 116704
make interior alterations to portion of 2nd & 3rd floors historical Closed
1999-07-22Building permit
99 019368
INSTALL FIXTURES ON 3RD FLOOR- 3 W.C., 2 F.D., 2 W.B., 1 URINAL. SEE BP# 425611Closed
1999-01-07Zoning review
99 021745 LTO
No description on fileClosed
1998-12-03Zoning review
98 026936 LTO
No description on fileClosed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: designated (Part IV)
  • Zoning not in By-law 569-2013

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: designated (Part IV)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
33.8 m frontage36.0 m deepon Church St
Zone
—
Height limit
—
Corner lot
Yes, also on Gould St
Public lane
None
House footprint
597 m²
Back yard
0 m
Buildings on the lot
4

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 10 development applications open within 300 m, up to 85 storeys
    • 18 minor variance decisions within 300 m, 94% approved

    What this part means for this house, in plain EnglishUnlock

    1. 10 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • TMU StationNearest station4 min walk
    • Dundas St East at Church StNearest TTC stop3 min walk
    • Gerrard St ENearest cycling route4 min walk
    • Toronto Metropolitan University - School of Interior DesignSchool1 min walk
    • Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool1 min walk
    • Toronto Metropolitan University - School of Image ArtsSchool2 min walk
    • Tmu - Heaslip HouseSchool2 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    5 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 322 Church St

    4 things to check at 322 Church St before you offer

    • 2 building permits open, the oldest since 2011Moderate
    • Heritage property: designated (Part IV)Moderate
    • Work or applications in progressModerate
    • Zoning not in By-law 569-2013Moderate
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 9 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.