Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2019
Needs a closer lookStill open in the City's records: 19 126909 (Proposed kitec piping replacement, 2019, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)2 Committee of Adjustment files on this lot
Good to know2 approved. A0334/04T (The applicant is seeking relief from the provisions of By-law No. 983-2001 and Zoning B..., 2005); A338/03M (This is an application under Section 45 of the Planning Act for variance from the provi..., 2003).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)5 development applications open within 300 m
Good to know5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
25 records on file: more than at 100% of Toronto houses (median 0).
- Building permit25 153112Closed
Proposal For Chiller and Cooling Tower Replacement.
Jun 2, 2025 · 319 MERTON ST - Building permit19 126909Inspection
Proposed kitec piping replacement.
Apr 12, 2019 · 319 MERTON ST - Building permit18 262998Closed
Proposal to replace kitec plumbing
Jan 8, 2019 · 319 MERTON ST - Building permit18 261598Closed
Proposal for the replacement of kitec plumbing in unit 106.
Jan 3, 2019 · 319 MERTON ST - Building permit15 253987Closed
Proposed Backflow Prevention Devices (Water only)
Dec 16, 2015 · 319 MERTON ST - Zoning review07 224200 ZPRClosedMay 29, 2007 · 319 MERTON ST
- Building permit05 126455Closed
Sprinklers permit in connection with BP 03-201988
Nov 28, 2005 · 319 MERTON ST - Building permit03 201988Closed
Construct a 13 and 14-storey residential building containing 241 dwelling units - Superstructure
Nov 28, 2005 · 319 MERTON ST
Show 17 older records
- Zoning review05 203321 ZPUClosedNov 17, 2005 · 319 MERTON ST
- Building permit05 154952Closed
Interior underground storm & sanitary drains
Jul 11, 2005 · 319 MERTON ST - Building permit03 201999Closed
Multiple unit residential bldg. - Foundation application (Reference BP#03-201988)
May 13, 2005 · 319 MERTON ST - Minor varianceA0334/04TApproved
The applicant is seeking relief from the provisions of By-law No. 983-2001 and Zoning By-law No. 438-86, as amended, in order to construct a residential development. The development will be comprised of two hi-rise towers being 13 and 14 storeys containing 249 dwelling units with below grade residents and visitors parking. The overall residential gross floor area will be 21,078.53 square metres. Note: In its decision of July 3, 2003 the Committee approved a residential development comprised of two towers being 12 and 13 storeys, along with its related variances for excess density and for portions of the development that would be located above the height limits, as well as, not being located within the heavy lines of delineation as outlined on Plan 2, of By-law 983-2001..
Feb 9, 2005 · 319 MERTON ST - Building permit03 202011Closed
Application for multiple unit residential bldg. - partial permit for shoring (referenceBP#03-201988)
Dec 6, 2004 · 319 MERTON ST - Zoning review04 142230 000CancelledJun 1, 2004 · 319 MERTON ST
- Zoning review04 142228 PLOClosedJun 1, 2004 · 319 MERTON ST
- Minor varianceA338/03MApproved
This is an application under Section 45 of the Planning Act for variance from the provisions of the Toronto Zoning By-law 438-86, as amended, to permit the construciton of a thirteen-storey apartment building containing 231 dwelling units with below-grade parking.
Jul 3, 2003 · 319 MERTON ST - Zoning review03 145911 PSPClosedJun 17, 2003 · 319 MERTON ST
- Building permit02 197654Closed
Construct a temporary suite (model suite) attached to sales pavillion.
Feb 20, 2003 · 319 MERTON ST - Zoning review03 107679 ZPRClosedFeb 11, 2003 · 319 MERTON ST
- Building permit02 176421Closed
Construct temporary sales pavillion for future condiminium development. One year maximum
Nov 12, 2002 · 319 MERTON ST - Building permit02 176414Cancelled
Construct temporary sales office. Hold for survey approval.
Sep 26, 2002 · 319 MERTON ST - Building permit01 190559Closed
provide temporary localized shoring and excavation for site decontamination purpose only, as an extension to a previously issued demolition permit for this site. Hole to be backfilled to restore site to original condition at end.
Dec 7, 2001 · 319 MERTON ST - Zoning review01 157733 000ClosedJul 12, 2001 · 319 MERTON ST
- Building permit99 021732Closed
DEMOLISH 5 STOREY WAREHOUSE BUILDING TO GRADE JNB LISTED HISTORICAL
May 24, 2001 · 319 MERTON ST - Zoning review00 138553 000ClosedMar 27, 2000 · 319 MERTON ST
Check before you build
Site-specific exception 900.11.10(2063)
Needs a closer look4 site-specific rules and 4 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86
- Rule B
On 137-147 Merton St. & 319 Merton St., Section 12: (1) 308 of By-law 438-86
- Rule D
On the lands municipally known as 319 Merton St. in 1992, Section 12(1) 308 of former City of Toronto By-law 438-86
- Rule E
On 319 Merton St., City of Toronto by-law 983-01.
- Older by-law A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category. Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86
- Older by-law B
On 137-147 Merton St. & 319 Merton St., Section 12: (1) 308 of By-law 438-86
- Older by-law D
On the lands municipally known as 319 Merton St. in 1992, Section 12(1) 308 of former City of Toronto By-law 438-86
- Older by-law E
On 319 Merton St., City of Toronto by-law 983-01.
2 parts for other addresses
- C On 260 Merton St., former City of Toronto by-law 96-0274
- C On 260 Merton St., former City of Toronto by-law 96-0274
Lot facts
- Area
- 3,543 m²
- Frontage
- 49.3 m
- Depth
- 76 m
- Street
- Mount Pleasant Rd
- Corner lot
- Yes, also on Merton St76 m along it
- Public lane
- None
- Max height
- 21 m
- Max lot coverage
- —
- Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone CR 2.0 (c2.0; r2.0) SS2 (x2063) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: planetree, london (18 cm), planetree, london (18 cm), pagoda, japanese (16 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%9 of 9 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 1
- Multiplex permits
- 0
- Development applications
- 14
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 9 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing three-storey commercial building by constructing a front entrance accessible ramp, a complete fourth storey addition with a side (south) courtyard, and a staircase enclosure on the rooftop level. This building will contain medical office and personal service shop uses. There will be two accessible parking spaces, and one standard parking space provided on-site.
522 MOUNT PLEASANT RD · Jan 14, 2026 · 475 m away - Minor varianceApproved
To alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space.
119 MERTON ST · Nov 19, 2025 · 446 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 39-2025(OLT)), for a new 31-storey residential building, by increasing the building height from 102.9 m to 104.6 m. This is currently being reviewed under Site Plan Control (File 20 21 234919 STE 12 SA). There will be a total of 273 residential dwelling units.
289 BALLIOL ST · Jul 23, 2025 · 137 m away - Minor varianceApproved
To alter the mezzanine levels within two adjacent dwelling units (units 1210 and 1216).
119 MERTON ST · May 31, 2023 · 446 m away - Minor varianceApproved
To alter the existing two-storey office building by constructing a third-storey addition.
170 MERTON ST · Nov 4, 2015 · 320 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to sever the property into two stratified lots and to create new easements/rights-of-way. Also, to maintain existing easements/rights-of-way.
265 BALLIOL ST · Dec 2, 2026 · 130 m away - Building permit
Installation of two mag-locks and associated equipment on exit doors serving the basement.
268 MERTON ST · Nov 10, 2026 · 88 m away - Zoning review
Notice Sent
275 MERTON ST · Oct 27, 2026 · 59 m away - Building permit
An alternative solution is proposed to address exiting from a portion of the ground floor in the building to be located at 289-299 Balliol Street, Toronto, ON. This noted portion served by a single exit is classified as a Group F-3 space with an area of approximately 160.1 sqm.
289 BALLIOL ST · Oct 16, 2026 · 137 m away - Building permit
Targeted waterproofing renewal at the parking garage roof slab, including localized concrete repairs.
221 BALLIOL ST · Sep 11, 2026 · 205 m away - Building permit
Proposed concrete repairs at balcony slabs, shear walls, columns, end walls, roof parapet, exposed building floor slab edges, and entrance canopy; Replacement of balcony guards; Targeted masonry repairs and installation of an elastomeric coating/paint for the exterior walls; General replacement of exterior joint sealants (excluding window and balcony door perimeter joints).
265 BALLIOL ST · Aug 31, 2026 · 130 m away - Building permit
Proposal for balcony repairs
221 BALLIOL ST · Aug 4, 2026 · 205 m away - Building permit
Proposed demolition of row of townhouses/buildings to accommodate proposed project for 45-storey mixed-use residential building - Re: 170/180 Merton St
180 MERTON ST · Jun 4, 2026 · 298 m away - Building permit
REV 01: Proposed to alter approved shoring design to include tiebacks into municipal right of wayPart Permit - Proposal to construct 32-Storey rental residential apartment building with level of underground parking
289 BALLIOL ST · Apr 17, 2026 · 137 m away - Building permit
Proposed to convert the garage sprinkler system from a wet sprinkler to a drysprinkler system.
265 BALLIOL ST · Apr 2, 2026 · 130 m away
Neighbourhood: South Eglinton-Davisville
About the area around the lot, not the lot itself.
- Nearest station
- Davisville Station13 min walk
- Nearest TTC stop
- Mt Pleasant Rd at Merton St1 min walk
- Nearest cycling route
- Kay Gardiner Beltline TrlMulti-Use Trail, 1 min walk
- Nearest traffic count
- 24,133 vehicles in 14 hMount Pleasant Rd / Merton St, 60 m away, Oct 26, 2024
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
- Parks
- Kay Gardner Beltline Park1 min walk
- Mount Pleasant Parkette3 min walk
- The Mission Ground Parkette3 min walk
Schools within 1 km
- GREENWOOD COLLEGE SCHOOL Private 4 min walk
- TORONTO PREP SCHOOL Private 5 min walk
- SUNNYBROOK SCHOOL Private 6 min walk
- HODGSON MIDDLE SCHOOL English Public 7 min walk
- MANOR MONTESSORI - DE SAVERY SITE Private 10 min walk
- DAVISVILLE & SPECTRUM SCHOOL English Public 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | South Eglinton-Davisville | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $80,000 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 22,735 | 16,813 |
| Homes built in 1960 or before | 11% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | South Eglinton-Davisville | City median |
|---|---|---|
| Assault | 436 | 636.3 |
| Robbery | 24.2 | 69.5 |
| Auto theft | 58.8 | 192.6 |
| Theft over $5,000 | 20.8 | 46.1 |
| Break and enter | 128 | 172.8 |
| Theft from vehicles | 100.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.