Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 317 Roncesvalles Ave
317 Roncesvalles Ave is on a 6.1 m by 38.3 m lot on Roncesvalles Ave in Roncesvalles. The zoning is CR. A site-specific exception, 900.11.10(1554), changes some of the usual rules for this address. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.
The City has 7 records on this lot since 1987. That is more than at 97% of Toronto houses. In 2019, a building permit was filed: "Proposal to install a kitchen suppression system". Status: permit issued. In 2016, a building permit was filed: "Interior alterations to basement and ground floor of existing restaurant. occupant load = 53. tenant - "defina"". Status: inspection. In 2015, a Committee of Adjustment application was filed: "To alter the three-storey mixed use building by constructing a rear one-storey addition". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 52 minor variance applications in the last 10 years and approved 96%. Bloor GO station is a 14-minute walk.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2016ModerateFree check
- Heritage property: listedModerate
- Site-specific exception 900.11.10(1554)Moderate
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2016
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2016
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
7 records on file, more than at 97% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2019-03-12 | Building permit19 115345 | Proposal to install a kitchen suppression system. | Permit Issued | |
| 2016-09-23 | Building permit16 219897 | Interior alterations to basement and ground floor of existing restaurant. Occupant load = 53. Tenant - "Defina". | Inspection | |
| 2015-08-17 | Building permit15 207700 | Permit to construct 1-storey addition with interior alterations, basement exit stair & underpinning to ground floor restaurant (57 Seats increased to 70 Seats). | Cancelled | |
| 2015-07-06 | Building permit15 184766 | Proposal to demolish existing rear detached garage serving the existing non resdiential building in orderto faciliate the construcution of a rear additon and alterations approved by the Committee ofn Adjustment | Cancelled | |
| 2015-03-25 | Minor varianceA0073/15TEY | To alter the three-storey mixed use building by constructing a rear one-storey addition. | Approved | |
| 2014-12-02 | Zoning review14 259168 ZPR | No description on file | Closed | |
| 1987-05-14 | Zoning review87 030135 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: listed
- Site-specific exception 900.11.10(1554)
What this part means for this house, in plain EnglishUnlock
Heritage property: listed
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(1554)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1554)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.5 (c1.0; r2.0) SS2 (x1554)
- Height limit
- 14 m
- Corner lot
- No
- Public lane
- Ln E Roncesvalles S Grenadier, 5.9 m along it
- House footprint
- 212 m²
- Back yard
- 1.4 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 30 suite and multiplex permits within 300 m in 10 years
- 52 minor variance decisions within 300 m, 96% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Roncesvalles neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Bloor GO StationNearest station14 min walk
- Roncesvalles Ave at Grenadier RdNearest TTC stop1 min walk
- Fermanagh AveNearest cycling route4 min walk
- St Vincent de Paul Catholic Elementary SchoolSchool4 min walk
- Howard Jr Public SchoolSchool5 min walk
- Academy of Enlightened MindsSchool7 min walk
- Westminster Classical Christian Academy Elementary SchoolSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3939.5
- Robberycity median 69.566.2
- Auto theftcity median 192.6102.4
- Theft over $5,000city median 46.16
- Break and entercity median 172.8252.9
- Theft from vehiclescity median 188.1150.6
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist