HousePrecheckCheck an address

317 Queen St EMoss Park, Toronto · City records before you offer

Also 315 Queen St E

(H) CR 6.75 (c0.95; r5.8) SS2 (x782)24.9 × 30.9 m757 m²on Queen St Ecorner, also on Berkeley St

3 things to check before you offer, including heritage property: designated (Part IV)
N20 m
24.9 m frontage30.9 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 317 Queen St E

317 Queen St E is on a 24.9 m by 30.9 m lot on Queen St E in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(782), changes some of the usual rules for this address. The lot also fronts Berkeley St. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.

The City has 19 records on this lot since 2003. That is more than at 99% of Toronto houses. In 2016, a development application was filed: "Proposal for a new 19-storey mixed-use building next to the existing berkeley church, containing 150 dwelling units and 1,066 square metres of non-residential…". Status: omb approved. In 2016, a development application was filed: "Inactive site plan application for a 25-storey mixed-use building: 206 dwelling units, 6 levels of below-grade parking, total combined gfa 15,711 sq. m". Status: under review. In 2012, a building permit was filed: "Interior alterations to portion of ground floor for new assmebly use and interior alterations to ground, 2nd, and 3rd floor offices.(this permit does not…". Status: closed. Nothing on file is open right now.

Within 300 m, 14 development applications are open (the tallest up to 46 storeys). The nearest TTC stop is Queen St East at Ontario St, a 1-minute walk.

Summary

What the City's records show on this house

  • Heritage property: designated (Part IV)Moderate
  • Work or applications in progressModerateFree check
  • Holding provision (H)Moderate
  • Site-specific exception 900.11.10(782)Moderate
  • 2 by-law investigations closed in the last two yearsLow
  • 14 development applications open within 300 mLowFree check
  • Priority retail street: Queen Street EastLow
  • 1 City tree in front of this lotLowFree check
  • King-Parliament Secondary PlanLow
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

3 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • 2 by-law investigations closed in the last two years
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 2 by-law investigations closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

19 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-07-16By-law investigation
26 236548 LGW 00 IV
Notice Issued Long GrassNotice Issued
2026-07-16By-law investigation
26 203534 LGW 00 IR
Long Grass and WeedsNotice Issued
2026-04-22By-law investigation
26 147893 PRS 00 IR
Property StandardsClosed
2026-01-05By-law investigation
26 101100 WST 00 IR
WasteClosed
2025-07-08By-law investigation
25 190005 WST 00 IR
WasteClosed
2025-03-01By-law investigation
25 123511 PRS 00 IR
Property StandardsClosed
2022-06-01Consent (lot split)
B0028/22TEY
To obtain consent to create an easement/right-of-way in favour of 132 Berkeley Street.Approved
2016-06-27Building permit
16 180832
To convert the existing two-storey building from a film studio to a place of assembly. Note: Permit No. 04 182339 BA was originally submitted for the exact purpose, however, the application was withdrawn due to inactivity.Cancelled
2016-05-25Development application
16 161250 STE 28 OZ
Proposal for a new 19-storey mixed-use building next to the existing Berkeley Church, containing 150 dwelling units and 1,066 square metres of non-residential gross floor area.OMB Approved
2016-05-25Development application
16 161258 STE 28 SA
INACTIVE Site Plan application for a 25-storey mixed-use building: 206 dwelling units, 6 levels of below-grade parking, total combined GFA 15,711 sq. m.Under Review
2012-07-09Building permit
11 240326
Interior alterations to portion of ground floor for new assmebly use and interior alterations to ground, 2nd, and 3rd floor offices.(this permit does not include 3rd floor, or any additions)Closed
2011-07-25Building permit
11 242917
Proposal to install fire alarms on all floors of exisitng multi use building. See related building permit 11 240326 BLD.Closed
2010-09-03Building permit
10 252794
As of 06/21/11, proposal to construct new enclosed wheelchair ramp on north-east side of building. Cancelled
2009-11-12Building permit
09 187412
Proposal for multiple work; - Proposal to demo existing rear second storey and rebuild. - Remove second storey shed from roof top - Construction of single storey storage building (@ rear) - Exist stairwell/ramp (side elevation)Cancelled
2007-03-07Zoning review
07 114151 LTO
No description on fileClosed
2004-10-18Building permit
04 182339
Change of use - no construction . PPR ( D.Tapp is familiar)Closed
2004-05-18Zoning review
04 136326 LTO
No description on fileClosed
2004-05-12Zoning review
04 134298 ZPR
No description on fileClosed
2003-02-19Zoning review
03 109390 LTO
No description on fileClosed
Significant

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: designated (Part IV)
  • Holding provision (H)
  • Site-specific exception 900.11.10(782)

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: designated (Part IV)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Holding provision (H)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. Site-specific exception 900.11.10(782)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. Priority retail street: Queen Street East

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  5. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  6. King-Parliament Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(782)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
24.9 m frontage30.9 m deepon Queen St E
Zone
(H) CR 6.75 (c0.95; r5.8) SS2 (x782)
Height limit
25 m
Corner lot
Yes, also on Berkeley St
Public lane
None
House footprint
471 m²
Back yard
0 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 14 development applications open within 300 m, up to 46 storeys
    • In the Corktown station area
    • 1 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 14 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 8 categories
    • Assault: 3.5 times the Toronto median
    • Robbery: 2.4 times the Toronto median
    • Break and enter: 2.0 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Moss Park neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$65,000median $84,500
    Households that own their home35%median 54%
    Population (2021)21,490median 16,813
    Homes built in 1960 or before17%median 29%
    Homes needing major repairs8%median 7%

    Getting around and schools

    • Queen StationNearest station18 min walk
    • Queen St East at Ontario StNearest TTC stop1 min walk
    • Richmond St ENearest cycling route2 min walk
    • Liberty Prep SchoolSchool2 min walk
    • St Paul Catholic Elementary SchoolSchool6 min walk
    • Inglenook Community SchoolSchool9 min walk
    • Ecole Elementaire Gabrielle RoySchool9 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32226.8
    • Robberycity median 69.5166.6
    • Homicidecity median 5.33.4
    • Shootingscity median 10.53.4
    • Auto theftcity median 192.681.6
    • Theft over $5,000city median 46.164.6
    • Break and entercity median 172.8350.2
    • Theft from vehiclescity median 188.1275.4

    More about Moss Park

    Ready emails

    Copy and send as they are.

    4 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 317 Queen St E

    3 things to check at 317 Queen St E before you offer

    • Heritage property: designated (Part IV)Moderate
    • Work or applications in progressModerate
    • Holding provision (H)Moderate
    • Site-specific exception 900.11.10(782)Moderate
    • and 6 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 7 steps to take before you offer, so nothing slips
    • What each of the 10 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.