Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 311 Queen St E
311 Queen St E is on a 24 m by 31 m lot on Queen St E in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(782), changes some of the usual rules for this address.
The City has 21 records on this lot since 2007. That is more than at 99% of Toronto houses. In 2022, a building permit was filed: "Proposal for outdoor canopy". Status: closed. In 2018, a building permit was filed: "Proposal to temporarily install two (2) 15' x 40' frame tents for the berkely field house event venue (cert#15 159491) from february 21 to february 23, 2018". Status: closed. In 2018, a building permit was filed: "Proposal to temporarily install two (2) 15' x 40' frame tents for the berkely field house event venue (cert#15 159491) from february 2 to february 5, 2018". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 18 development applications are open (the tallest up to 46 storeys). The nearest TTC stop is Queen St East at Ontario St, a 1-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2016ModerateFree check
- Work or applications in progressModerateFree check
- Holding provision (H)Moderate
- Site-specific exception 900.11.10(782)Moderate
- 3 by-law investigations closed in the last two yearsLow
- 18 development applications open within 300 mLowFree check
- Priority retail street: Queen Street EastLow
- King-Parliament Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2016
- Work or applications in progress
- 3 by-law investigations closed in the last two years
What this part means for this house, in plain EnglishUnlock
Building permit open since 2016
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
3 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
21 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-12-16 | By-law investigation25 267080 WST 00 IR | Waste | Closed | |
| 2025-07-24 | By-law investigation25 199626 PRS 00 IR | Property Standards | Closed | |
| 2025-05-31 | By-law investigation25 169019 PRS 00 IR | Property Standards | Closed | |
| 2025-04-15 | By-law investigation25 145281 PRS 00 IR | Property Standards | Closed | |
| 2022-03-28 | Building permit22 125153 | Proposal for outdoor canopy. | Closed | |
| 2021-10-16 | Building permit21 226687 | Installing a 20ft x 60ft x 10ft tent - for the "BERKLEY FIELD EVENT VENUE" from Oct 5 to Nov 15, 2021 | Cancelled | |
| 2018-04-19 | Building permit18 146274 | Proposal to install one temporary tent / marquis at west side (in the middle of property) of existing mixed use building. April 25 2018 - October 25 2018 | Cancelled | |
| 2018-02-13 | Building permit18 116076 | Proposal to temporarily install two (2) 15' x 40' frame tents for the Berkely Field House Event Venue (Cert#15 159491) from February 21 to February 23, 2018. | Closed | |
| 2018-01-19 | Building permit18 105901 | Proposal to temporarily install two (2) 15' x 40' frame tents for the Berkely Field House Event Venue (Cert#15 159491) from February 2 to February 5, 2018. | Closed | |
| 2017-04-21 | Building permit17 145059 | Proposal to install one temporary certified tent (#14-154242). 15' x 40' marquis from April 21,2017 to Oct 21, 2017 | Closed | |
| 2016-05-25 | Development application16 161250 STE 28 OZ | Proposal for a new 19-storey mixed-use building next to the existing Berkeley Church, containing 150 dwelling units and 1,066 square metres of non-residential gross floor area. | OMB Approved | |
| 2016-05-25 | Development application16 161258 STE 28 SA | INACTIVE Site Plan application for a 25-storey mixed-use building: 206 dwelling units, 6 levels of below-grade parking, total combined GFA 15,711 sq. m. | Under Review | |
| 2016-04-28 | Building permit16 146202 | Proposal to install one temporary 15' x 50' tent / marquis at west side (middle of property) of existing mixed use building. April 28-Nov1/16/16. | Closed | |
| 2016-02-02 | Building permit15 268361 | Proposal to demolish 3 storey storage building and shed. | Work Not Started | |
| 2015-05-14 | Building permit15 156305 | Proposal to install one temporary tent / marquis at west side (in the middle of property) of existing mixed use building. Date of erection May 15th and dismantled on October 31st, 2015. | Closed | |
| 2014-05-09 | Building permit14 154242 | Proposal to install one temporary tent / marquis at west side (in the middle of property) of existing mixed use building. | Closed | |
| 2013-05-22 | Zoning review13 172319 LTO | No description on file | Closed | |
| 2013-04-16 | Building permit13 149026 | Permit to install one temporary tent / marquis at west side (in the middle of property) of existing mixed use building. (April 26, 2013 - Nov 15, 2013) | Closed | |
| 2012-06-07 | Building permit12 182321 | permit to install one temporary tent / marquis at west side (in the middle of property) of existing mixed sue building. | Closed | |
| 2008-10-22 | Zoning review08 215163 ZPR | No description on file | Closed | |
| 2007-12-18 | Building permit07 287993 | permit for third floor front addition to existing office space - see 07 232065 br and 07 255541 wnp | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Holding provision (H)
- Site-specific exception 900.11.10(782)
- Priority retail street: Queen Street East
What this part means for this house, in plain EnglishUnlock
Holding provision (H)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(782)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Queen Street East
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
King-Parliament Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(782)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- (H) CR 6.75 (c0.95; r5.8) SS2 (x782)
- Height limit
- 25 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 307 m²
- Back yard
- 0.5 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 18 development applications open within 300 m, up to 46 storeys
- In the Corktown station area
- 1 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
18 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Assault: 3.5 times the Toronto median
- Robbery: 2.4 times the Toronto median
- Break and enter: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Moss Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Queen StationNearest station18 min walk
- Queen St East at Ontario StNearest TTC stop1 min walk
- Richmond St ENearest cycling route2 min walk
- Liberty Prep SchoolSchool2 min walk
- St Paul Catholic Elementary SchoolSchool6 min walk
- Ecole Elementaire Gabrielle RoySchool9 min walk
- George Brown College - St James CampusSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32226.8
- Robberycity median 69.5166.6
- Homicidecity median 5.33.4
- Shootingscity median 10.53.4
- Auto theftcity median 192.681.6
- Theft over $5,000city median 46.164.6
- Break and entercity median 172.8350.2
- Theft from vehiclescity median 188.1275.4
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist