Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 302 Bay St
302 Bay St is on a 27.9 m by 41.9 m lot on Bay St in Yonge-Bay Corridor. The zoning is CR. A site-specific exception, 900.11.10(2333), changes some of the usual rules for this address. The property is designated under Part IV of the Ontario Heritage Act, so changes to its heritage features need a City heritage permit.
The City has 25 records on this lot since 2000. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Rev 1: elevator lobbies, ceiling fire ratings (8th-14th), 8th & 9th floor layouts.proposal for interior alterations to existing office space on floors 4-12 and…". Status: revision issued. In 2024, a building permit was filed: "Revision #2 altering the overhead wet sprinkler system over floors 4-14 of an existing building to suit new partition and office layoutrevision 01: installing…". Status: revision issued. In 2024, a building permit was filed: "Proposal for interior alterations to the first, second and third floors of an existing office building". Status: inspection. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 7 development applications are open (the tallest up to 68 storeys). Within 300 m, the Committee of Adjustment decided 12 minor variance applications in the last 10 years and approved 100%. St Andrew station is a 4-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2024ModerateFree check
- Heritage property: designated (Part IV)Moderate
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(2333)Moderate
- 7 development applications open within 300 mLowFree check
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2024
- Work or applications in progress
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2024
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
25 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2024-11-28 | Building permit23 238606 | REV 1: ELEVATOR LOBBIES, CEILING FIRE RATINGS (8TH-14TH), 8TH & 9TH FLOOR LAYOUTS.Proposal for interior alterations to existing office space on floors 4-12 and 14-15 - "IQ Office" | Revision Issued | |
| 2024-06-25 | Building permit23 126769 | Revision #2 Altering the overhead wet sprinkler system over floors 4-14 of an existing building to suit new partition and office layoutREVISION 01: Installing an overhead wet sprinkler system in a return to base project over floors 3 to 15 of an existing building.BACK TO BASE - FLOORS 3-15 | Revision Issued | |
| 2024-01-16 | Building permit23 172523 | Proposal for interior alterations to the first, second and third floors of an existing office building. | Inspection | |
| 2020-01-30 | Building permit19 265065 | Proposal for interior alterations to an existing office space on the third floor. | Closed | |
| 2019-01-17 | Building permit19 105441 | Proposal to install new magnetic locking device to existing door in an existing office. | Closed | |
| 2018-07-11 | Building permit18 173180 | Proposal to install 2 new backflow prevention devices and expansion tank for premise isolation for office building. | Closed | |
| 2014-05-05 | Building permit14 136509 | Porposal for interior alterations to the 12th floor - tenant is "BMO Financial Group" | Closed | |
| 2013-04-24 | Building permit13 134797 | Revision to permit; (see bubbled drawings). Original roposal was for interior alterations to existing office space on the 4th floor of existing office building. "BMO" (260m2) | Closed | |
| 2012-01-31 | Building permit12 111969 | permit for interior alterations to existing office space - floor 5 - BMO | Closed | |
| 2011-11-30 | Building permit11 301266 | This is for interior alterations to the north portion of the 10th and 11th floors for BMO finacial services. | Closed | |
| 2011-11-09 | Building permit11 301254 | This is for the installation of two(2) electromagnetic locks on the 10th and 11th floor. | Closed | |
| 2011-08-22 | Building permit11 255791 | Minor interior alterations to existing office space on the 4th floor. | Closed | |
| 2011-05-11 | Building permit11 184406 | This is for the installation of one electromagnetic lock on the 6th floor for "BMO" | Closed | |
| 2008-11-26 | Building permit08 222901 | interior alterations to existing office space - floor 10 - BMO | Closed | |
| 2008-02-20 | Building permit08 110359 | Make interior alterations to 8th floor. | Closed | |
| 2007-04-02 | Building permit07 116764 | Fire alarm upgrade for entire building - Bank of Montreal - 15 storey office tower | Closed | |
| 2006-07-06 | Building permit06 149534 | HVAC - Interior alterations to an existing office space on the 15th floor | Closed | |
| 2006-05-08 | Building permit06 131122 | Interior alterations to existing office on the 8th floor. | Closed | |
| 2006-02-15 | Building permit06 108687 | Plumbing - Make interior alterations to portions of 14th floor. - Interior Alterations | Closed | |
| 2005-11-03 | Building permit05 195545 | HVAC - Interior alterations to offices on 7th and 9th floors - Interior Alterations | Closed | |
| 2003-04-22 | Building permit03 112432 | make interior alterations to 9th floor. Tenant: Bank of Montreal | Closed | |
| 2002-06-27 | Building permit02 143104 | HVAC -5TH FLOOR | Closed | |
| 2001-01-18 | Building permit01 104038 | Install 1 maglock at 12th floor at elevator lobby | Closed | |
| 2001-01-17 | Building permit00 362771 | H.V.A.C. alter ductwork on 12th floor existing office. tenant: nesbitt burns. designated: historical. cost included in 00-362759 edc | Closed | |
| 2000-12-22 | Building permit00 362759 | make interior alterations to 12th floor existing office. tenant: nesbitt burns. designated: historical. edc FASTRACK. PICKED UP ON JAN5/01 | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: designated (Part IV)
- Site-specific exception 900.11.10(2333)
What this part means for this house, in plain EnglishUnlock
Heritage property: designated (Part IV)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(2333)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2333)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 12.0 (c8.0; r11.7) SS1 (x2333)
- Height limit
- —
- Corner lot
- No
- Public lane
- None
- House footprint
- 494 m²
- Back yard
- 4.5 m
- Buildings on the lot
- 2
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 7 development applications open within 300 m, up to 68 storeys
- In the Queen station area
- 12 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
7 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 8 categories
- Assault: 5.3 times the Toronto median
- Theft over $5,000: 4.6 times the Toronto median
- Robbery: 4.3 times the Toronto median
- Break and enter: 3.2 times the Toronto median
- Homicide: 2.3 times the Toronto median
- Theft from vehicles: 2.1 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Bay Corridor neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St Andrew StationNearest station4 min walk
- 300 Bay StNearest TTC stop1 min walk
- Adelaide St WNearest cycling route1 min walk
- Victoria Street LincSchool5 min walk
- Keystone International SchoolsSchool7 min walk
- St Michael's Choir School - Gymnasium BldgSchool11 min walk
- St Michael's Choir School - Choral BldgSchool11 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.33361.1
- Robberycity median 69.5300.1
- Homicidecity median 5.312
- Shootingscity median 10.512
- Auto theftcity median 192.6162.1
- Theft over $5,000city median 46.1210.1
- Break and entercity median 172.8552.2
- Theft from vehiclescity median 188.1402.1
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist