Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 301 Keele St
301 Keele St is on a 11.2 m by 34 m lot on Keele St in Junction Area. The zoning is R. A site-specific exception, 900.2.10(737), changes some of the usual rules for this address. The lot also fronts Annette St.
The City has 13 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2025, a development application was filed: "Draft plan of condominium for 4 residentail dwelling units". Status: draft plan approved. In 2025, a building permit was filed: "Rev01: proposed revision removing fire alarms as a requirement. changing north and south wall construction to non-combustible construction to demolish existing…". Status: closed. In 2025, a building permit was filed: "Demolition of existing detach garage, construction of new two storey laneway suite". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open. Within 300 m, the Committee of Adjustment decided 31 minor variance applications in the last 10 years and approved 97%. Keele station is a 15-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Records mention laneway suite, multiplexModerateFree check
- 1 by-law investigation closed in the last two yearsLow
- The back yard may be too tight for a garden suiteLowFree check
- 1 development application open within 300 mLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- Records mention laneway suite, multiplex
- 1 by-law investigation closed in the last two years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention laneway suite, multiplex
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
13 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-08-17 | By-law investigation26 220802 PRS 00 IR | Property Standards | Closed | |
| 2025-12-24 | Development application25 269707 STE 04 CD | Draft Plan of Condominium for 4 residentail dwelling units. | Draft Plan Approved | |
| 2025-09-17 | Building permit24 103906 | REV01: Proposed revision removing fire alarms as a requirement. Changing north and south wall construction to non-combustible construction To demolish existing building and construct a new three storey dwelling for four units | Closed | |
| 2025-03-05 | Building permit24 166540 | Demolition of existing detach garage, construction of new two storey laneway suite | Closed | |
| 2024-04-12 | Building permit24 103937 | To demolish existing dwelling and construct a new three storey dwelling for four units | Closed | |
| 2024-01-24 | Building permit24 107798 | To construct a rear laneway suite | Cancelled | |
| 2023-02-22 | Minor varianceA1285/22TEY | To construct a new three-storey building (fourplex). Also, to construct a two-storey ancillary building (three parking spaces with a second storey laneway suite and a north side balcony), in the rear yard, abutting the laneway. A total of five dwelling units will be constructed on this lot. | Approved | |
| 2023-02-02 | Zoning review23 109552 ZAP | No description on file | Closed | |
| 2023-02-02 | Zoning review23 109549 ZAP | No description on file | Closed | |
| 2022-08-17 | Zoning review22 192157 ZAP | No description on file | Closed | |
| 2003-03-17 | Building permit03 100551 | Make interior alterations to basement for an additional dwelling unit. see c. of a. decision | Closed | |
| 2002-12-03 | Minor varianceA356/02HY | To increase the number of dwelling units from 2 to 3, by adding an additional unit in the basement. | Approved | |
| 2002-09-19 | Zoning review02 174433 ZPR | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Exception 900.2.10(737) does not apply to this address
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Exception 900.2.10(737) does not apply to this address
Nothing to doNothing to do: this does not apply to the house.
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, laneway suite
- Garden suite: needs a closer look
What this part means for this house, in plain EnglishUnlock
The back yard may be too tight for a garden suite
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6) (x737)
- Height limit
- 11 m
- Corner lot
- Yes, also on Annette St
- Public lane
- Ln S Annette E Keele, 11.1 m along it
- New house permit
- 2025
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m
- 30 suite and multiplex permits within 300 m in 10 years
- 31 minor variance decisions within 300 m, 97% approved
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 7 categories
- Theft from vehicles: 3.1 times the Toronto median
- Theft over $5,000: 1.9 times the Toronto median
- Break and enter: 1.8 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Junction Area neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Keele StationNearest station15 min walk
- Keele St at Annette StNearest TTC stop1 min walk
- Annette StNearest cycling route1 min walk
- The Great Lakes College SchoolSchool2 min walk
- Indian Road Crescent Jr Public SchoolSchool4 min walk
- Lucy McCormick Sr SchoolSchool5 min walk
- St Rita Catholic Elementary School & Msgr Fraser SouthwestSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3908.1
- Robberycity median 69.574.6
- Shootingscity median 10.56.2
- Auto theftcity median 192.6236.4
- Theft over $5,000city median 46.187.1
- Break and entercity median 172.8304.8
- Theft from vehiclescity median 188.1578.5
Ready emails
Copy and send as they are.
5 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist