HousePrecheckCheck an address

30 Gloucester StChurch-Wellesley, Toronto · City records before you offer

Residential · R (d2.5) (x89)≈ 100.2 × 47.7 m4,010 m²on Gloucester St

2 things to check before you offer, including 1 open order or by-law investigation
N20 m
≈ 100.2 m frontage≈ 47.7 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 30 Gloucester St

30 Gloucester St is on a 100.2 m by 47.7 m lot on Gloucester St in Church-Wellesley. The zoning is R. A site-specific exception, 900.2.10(89), changes some of the usual rules for this address.

The City has 20 records on this lot since 1987. That is more than at 99% of Toronto houses. In 2023, a building permit was filed: "Proposal for sealant replacement and concrete wall repairs to the entrance canopy slab of the parking garage in an existing apartment building". Status: permit issued. In 2018, a building permit was filed: "Proposal for structural concrete repairs to the garage slab in an existing apartment building". Status: permit issued. In 2015, a building permit was filed: "Replacement of existing obsolete fire alarm control panel and voice communications panel". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection. There is 1 open order or by-law investigation on file. Ask the seller what is outstanding and whether it will be fixed before closing.

Within 300 m, 26 development applications are open (the tallest up to 76 storeys). Wellesley station is a 3-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • 1 open order or by-law investigationSerious
  • 2 building permits open, the oldest since 2018ModerateFree check
  • Site-specific exception 900.2.10(89)Moderate
  • 1 by-law investigation closed in the last two yearsLow
  • No permit for a second unit on fileLowFree check
  • The back yard may be too tight for a garden suiteLowFree check
  • 26 development applications open within 300 mLowFree check
  • 6 City trees in front of this lotLowFree check
  • Site and Area Specific Policy 382Low
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 6 units

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer, 1 of them serious.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Serious

Open City files

How much in the City's records needs answers before an offer

  • 1 open order or by-law investigation
  • 2 building permits open, the oldest since 2018
  • 1 by-law investigation closed in the last two years

What this part means for this house, in plain EnglishUnlock

  1. 1 open order or by-law investigation

    SeriousCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 2 building permits open, the oldest since 2018

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. 1 by-law investigation closed in the last two years

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

City files on this lot

20 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-11-24By-law investigation
25 257668 ZON 00 IR
ZoningClosed
2025-09-11Building order
25 224800 WNP 00 VI
Order Issued No Permit: Construction work taking place without permit. Extensive interior and exterior unit renovations are taking place in unit 402. Plumbing, electrical and walls being relocated inside unit. Additonal units renovations may be taking place including adding nOrder Issued
2025-04-03By-law investigation
25 139137 GRA 00 IR
GraffitiClosed
2023-06-20Building permit
23 156187
Proposal for sealant replacement and concrete wall repairs to the entrance canopy slab of the parking garage in an existing apartment building.Permit Issued
2020-10-16Building permit
20 206750
In conjunction with a multi-storey building on the premises, proposal to erect and display an illuminated overhanging structure sign, displaying static copy at the 1st floor on the south elevation.****GLOUCESTER GATE****Cancelled
2018-08-30Building permit
18 216660
Proposal for structural concrete repairs to the garage slab in an existing apartment building.Permit Issued
2015-12-07Building permit
15 250593
Replacement of existing obsolete fire alarm control panel and voice communications panel.Closed
2012-07-13Building permit
12 192908
Proposal to repair roof of parking garage.Closed
2010-06-14Building permit
10 177513
Permit for one backflow valve in existing Condo buildingClosed
2009-07-29Building permit
09 150906
Proposal for balcony repairs (196) and replace railings (980m) for existing apartment building.Closed
2006-09-11Building permit
05 207247
REVISION to new barrier free doors from B2 level corridor to parking garage, Phase IIIClosed
2004-11-03Building permit
04 174363
Demolish and rebuild concrete slab for parking garage levels 1 and 2. Parking garage repairs (PHASE 2). Existing and proposed: Apartment Building.Closed
2003-11-19Building permit
03 186999
Demolish and rebuild concrete slab for parking garage levels 1 and 2. Parking garage repairs (PHASE 1)Closed
2003-04-16Building permit
03 114089
underground parking garage, temporary shore up garage slab.Closed
2001-02-02Zoning review
01 107698 000
No description on fileClosed
2000-06-06Building permit
00 148275
alter bp425814(990) by making structural modifications. (w24)Closed
1999-06-11Building permit
99 017489
INSTALL H.V.A.C. IN PORTION OF BUILDING COST INCLUDED UNDER PERMIT # 410174 JNBClosed
1999-06-09Building permit
99 016703
ALTER PLANS AS APPROVED UNDER APPL.#410174 BY MAKING STRUCTURAL CHANGES AND LAYOUT CHANGES P AU FAMILAIR SSClosed
1998-05-25Building permit
98 014590
MAKE ALTERATIONS TO POOL ROOM FOR RECREATION ROOM PURPOSES.Closed
1987-09-18Zoning review
87 030394 LTO
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.2.10(89)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.2.10(89)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 6 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 382

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.2.10(89)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Some

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 6 units: likely fits
  • Garden suite: needs a closer look
  • Secondary suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. The back yard may be too tight for a garden suite

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Multiplex up to 6 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N20 m
≈ 100.2 m frontage≈ 47.7 m deepon Gloucester St
Zone
R (d2.5) (x89)
Height limit
30 m
Corner lot
No
Public lane
None
New house permit
None since 2000
House footprint
878 m²
Back yard
10.3 m
Buildings on the lot
6

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Busy

Building nearby

How much neighbours are building and applying to change within 300 m

  • 26 development applications open within 300 m, up to 76 storeys
  • In the Bloor-Yonge station area
  • 3 suite and multiplex permits within 300 m in 10 years

What this part means for this house, in plain EnglishUnlock

  1. 26 development applications open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 3 of 7 categories
  • Theft over $5,000: 2.3 times the Toronto median
  • Assault: 2.0 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Church-Wellesley neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$60,400median $84,500
Households that own their home24%median 54%
Population (2021)22,320median 16,813
Homes built in 1960 or before15%median 29%
Homes needing major repairs5%median 7%

Getting around and schools

  • Wellesley StationNearest station3 min walk
  • Wellesley Station - Northbound PlatformNearest TTC stop2 min walk
  • Wellesley St ENearest cycling route4 min walk
  • The Abelard Centre for EducationSchool3 min walk
  • Humber College - International Graduate SchoolSchool5 min walk
  • The YMCA Academy Secondary SchoolSchool7 min walk
  • National Ballet School - Maison Staines House & Salle Currie HallSchool7 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.31264.6
  • Robberycity median 69.593.2
  • Homicidecity median 5.33.3
  • Auto theftcity median 192.646.6
  • Theft over $5,000city median 46.1106.5
  • Break and entercity median 172.8146.4
  • Theft from vehiclescity median 188.1206.3

More about Church-Wellesley

Ready emails

Copy and send as they are.

5 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 30 Gloucester St

2 things to check at 30 Gloucester St before you offer

  • 1 open order or by-law investigationSerious
  • 2 building permits open, the oldest since 2018Moderate
  • Site-specific exception 900.2.10(89)Moderate
  • 1 by-law investigation closed in the last two yearsLow
  • and 6 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 8 steps to take before you offer, so nothing slips
  • What each of the 10 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.