Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2966-2978 Eglinton Ave E
2966-2978 Eglinton Ave E is on a 58.6 m by 62.2 m lot on Eglinton Ave E in Eglinton East. The zoning is CR. A site-specific exception, 900.11.10(691), changes some of the usual rules for this address.
The City has 11 records on this lot since 2002. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Propose to repair fire separation, fire protection and exit lighting damaged by fire". Status: inspection. In 2021, a development application was filed: "Bousfields inc. has submitted an application for zoning by-law amendment. the application proposes three mixed-use buildings with heights of 25, 30 and 37…". Status: under review. In 2021, a development application was filed: "Draft plan of subdivision to create 4 blocks. the dpos is associated with the zoning by-law amendment application which proposes 3 mixed-use buildings with…". Status: under review. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 5 development applications are open (the tallest up to 46 storeys). Within 300 m, the Committee of Adjustment decided 2 minor variance applications in the last 10 years and approved 100%. Eglinton GO station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(691)Moderate
- 5 development applications open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
11 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-10-09 | Building permit26 246005 | Propose to repair fire separation, fire protection and exit lighting damaged by fire | Inspection | |
| 2021-08-19 | Development application21 201461 ESC 21 OZ | Bousfields Inc. has submitted an application for Zoning By-law Amendment. The application proposes three mixed-use buildings with heights of 25, 30 and 37 storeys. The proposed development would be deployed in 2 phases with phase 1 consisting of the 37-storey building and phase 2 consisting of the 25 and 30 storeys buildings. The application proposes 935 residential units with a mix of unit types resulting in a residential gross floor area of 67,992 square metres. The application also proposes 522 square metres of retail/commercial uses and an overall floor space index of 7.36 times. A total of 742 vehicular and 714 bicycle parking spaces and 3 type G and 6 type C loading spaces would be provided. The proposal would provide a new 930 square-metre public park at the western portion of the site, pedestrian connections and privately-owned publicly accessible open spaces. A related Subdivision Application No. 21 201457 ESC 21 SB to create 4 new blocks has also been submitted by the applicant. | Under Review | |
| 2021-08-19 | Development application21 201457 ESC 21 SB | Draft Plan of Subdivision to create 4 Blocks. The DPOS is associated with the Zoning By-Law Amendment application which proposes 3 mixed-use buildings with heights of 25, 30 and 37 storeys. The proposed 4 blocks would be as follows: block 1 would be occupied by the 37-storey building, block 2 would be occupied by the 25 and 30 storey buildings, block 3 would be occupied by the new public park and block 4 would be the boulevard widening along Eglinton Avenue East to support the future EELRT. See associated Zoning By-Law Amendment application 21 201461 ESC 21 OZ. | Under Review | |
| 2018-07-20 | Building permit18 184023 | Proposal to install a back flow prevention device for 2974-2978 Eglington Ave. East | Closed | |
| 2014-05-13 | Minor varianceA069/14SC | To convert the existing funeral home into a Place of Worship. MEMO RECEIVED FROM CP CONDITIONS FULFILLED AS OF AUGUST 18, 2014 (FM) | Approved | |
| 2013-10-23 | Zoning review13 255218 ZZC | No description on file | Closed | |
| 2013-04-02 | Zoning review13 143174 ZZU | No description on file | Closed | |
| 2011-12-16 | Building permit11 218644 | To erect and display one illuminated ground sign, containing two sign faces, each with static copy and each 8' wide by 5' long and at a height of 13', on the westerly frontage of the premises and perpendicular to Eglinton Avenue East, in conjunction with an existing grocery store operating on the premises. **Shorebazaar Supermarket** | Closed | |
| 2003-11-26 | Zoning review03 195990 LTO | No description on file | Closed | |
| 2003-11-26 | Zoning review03 195971 LTO | No description on file | Closed | |
| 2002-02-14 | Zoning review02 110682 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(691)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(691)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(691)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 0.4 (c0.4; r0.0) SS3 (x691)
- Height limit
- 11 m
- Lot coverage limit
- 33%
- Corner lot
- No
- Public lane
- None
- House footprint
- 520 m²
- Back yard
- 9.4 m
- Buildings on the lot
- 2
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 5 development applications open within 300 m, up to 46 storeys
- In the Eglinton GO station area
- 2 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
5 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 2 of 7 categories
- Theft from vehicles: 3.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Eglinton East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Eglinton GO StationNearest station2 min walk
- Eglinton Ave East at Bellamy Rd North West Side - Eglinton GO StationNearest TTC stop1 min walk
- McCowan District Park TrlNearest cycling route4 min walk
- Umc High SchoolSchool9 min walk
- Pere Philipe Lamarche Catholic Secondary SchoolSchool10 min walk
- Mason Road Jr Public SchoolSchool11 min walk
- John McCrae Sr Public SchoolSchool11 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3825.8
- Robberycity median 69.565.6
- Shootingscity median 10.515.4
- Auto theftcity median 192.6270.1
- Theft over $5,000city median 46.161.7
- Break and entercity median 172.8150.5
- Theft from vehiclescity median 188.1559.5
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist