HousePrecheckCheck an address

2900 Finch Ave EL'Amoreaux West, Toronto · City records before you offer

Commercial residential · CR 0.4 (c0.4; r0.0) SS3 (x548)71.0 × 71.7 m4,962 m²on Finch Ave Ecorner, also on Victoria Park Ave

1 thing to check before you offer, including work or applications in progress
N20 m
71.0 m frontage71.7 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 2900 Finch Ave E

2900 Finch Ave E is on a 71 m by 71.7 m lot on Finch Ave E in L'Amoreaux West. The zoning is CR. A site-specific exception, 900.11.10(548), changes some of the usual rules for this address. The lot also fronts Victoria Park Ave.

The City has 13 records on this lot since 2000. That is more than at 99% of Toronto houses. In 2026, a development application was filed: "Zoning by-law amendment to construct new gas pumps with canopy, a new convenience store/quick-service restaurant with an associated drive-through facility. the…". Status: under review. In 2025, a development application was filed: "This site plan application proposes the demolition of the existing petro canada gasstation located at 2900 finch ave e. the redevelopment includes…". Status: under review. In 2002, a building permit was filed: "Revision to building permit 02-104503 for canopy, framing and foundation". Status: closed. Nothing on file is open right now.

Within 300 m, 4 development applications are open (the tallest up to 26 storeys). Within 300 m, the Committee of Adjustment decided 1 minor variance application in the last 10 years and approved 100%. The nearest TTC stop is Finch Ave East at Victoria Park Ave, a 1-minute walk.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(548)Moderate
  • 4 development applications open within 300 mLowFree check
  • 2 City trees in front of this lotLowFree check
  • Site and Area Specific Policy 347Low
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

13 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-09-23Development application
26 242686 ESC 22 OZ
Zoning By-law Amendment to construct new gas pumps with canopy, a new convenience store/quick-service restaurant with an associated drive-through facility. The existing car wash facilities will remain a part of the development.Under Review
2026-06-22Zoning review
26 189351 ZAP
No description on fileNotice Sent
2025-10-30Zoning review
25 148966 PSP
No description on fileClosed
2025-04-24Development application
25 148966 ESC 22 SA
This site plan application proposes the demolition of the existing Petro Canada gasstation located at 2900 Finch Ave E. The redevelopment includes theconstruction of new gas pumps and canopy, a new convenience store/quick-servicerestaurant with an associated drive-through facility, and comprehensivelandscaping throughout the property. The existing car wash facilities will remain a partof the development.Under Review
2023-10-31Zoning review
23 220643 ZAP
No description on fileClosed
2005-09-20Zoning review
05 182100 LTO
No description on fileClosed
2003-05-22Zoning review
03 135353 ZPU
No description on fileClosed
2002-05-22Building permit
02 104503
REVISION TO BUILDING PERMIT 02-104503 FOR CANOPY, FRAMING AND FOUNDATION.Closed
2002-02-25Building permit
02 110610
SITE SERVICES - NEW CONSTRUCTION OF GAS BAR/CAR WASH AND CONVENIENCE STOREClosed
2002-02-14Building permit
02 110609
SITE SERVICES - NEW CONSTRUCTION OF GAS BAR/CAR WASH AND CONVENIENCE STOREClosed
2002-02-12Building permit
02 109838
PART PERMIT FOR FOUNDATION ORIGINAL PERMIT NO. 02-104503Cancelled
2002-01-24Building permit
02 104521
DEMOLITION OF PETRO CANADA GAS STATION SEE APPLICATION NO. 02-104503 FOR BUILDING PERMITClosed
2000-07-10Minor variance
A125/00SC
No description on fileApproved
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(548)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(548)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. 2 City trees in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 347

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(548)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N50 m
71.0 m frontage71.7 m deepon Finch Ave E
Zone
CR 0.4 (c0.4; r0.0) SS3 (x548)
Height limit
11 m
Lot coverage limit
33%
Corner lot
Yes, also on Victoria Park Ave
Public lane
None
House footprint
595 m²
Back yard
12.1 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 4 development applications open within 300 m, up to 26 storeys
    • 1 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 4 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 5 of 7 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    L'Amoreaux West neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$72,500median $84,500
    Households that own their home54%median 54%
    Population (2021)21,545median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs6%median 7%

    Getting around and schools

    • Don Mills StationNearest station39 min walk
    • Finch Ave East at Victoria Park AveNearest TTC stop1 min walk
    • Corinthian BlvdNearest cycling route8 min walk
    • Chester Le Jr Public SchoolSchool9 min walk
    • Ernest Public SchoolSchool9 min walk
    • Mary Ward Linc and Esl CentreSchool10 min walk
    • Epiphany of Our Lord Catholic AcademySchool10 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3398
    • Robberycity median 69.587.1
    • Shootingscity median 10.54.1
    • Auto theftcity median 192.6228
    • Theft over $5,000city median 46.141.5
    • Break and entercity median 172.8161.7
    • Theft from vehiclescity median 188.1128.5

    More about L'Amoreaux West

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 2900 Finch Ave E

    1 thing to check at 2900 Finch Ave E before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(548)Moderate
    • 4 development applications open within 300 mLow
    • 2 City trees in front of this lotLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.