Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2704 Yonge St
2704 Yonge St is on a 41.2 m by 48.7 m lot on Yonge St in Lawrence Park South. The zoning is CR. A site-specific exception, 900.11.10(764), changes some of the usual rules for this address. The lot also fronts Alexandra Blvd.
The City has 15 records on this lot since 2005. That is more than at 99% of Toronto houses. In 2025, a development application was filed: "Site plan control application proposes the development of a 13-storey residential retirement building. the building will provide a total of 208 residential…". Status: noac issued. In 2025, a development application was filed: "Opa & rezoning application proposes the development of a 13-storey seniors residence providing residential suites, assisted living suites and memory care…". Status: council approved. In 2020, a development application was filed: "Zoning by law amendment application for a 9 storey building, containing residential uses and retail on the ground floor. adopted at nycc june 28, 2022, city…". Status: closed. Nothing on file is open right now.
Within 300 m, 2 development applications are open (the tallest up to 13 storeys). Within 300 m, the Committee of Adjustment decided 48 minor variance applications in the last 10 years and approved 96%. Lawrence station is a 15-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(764)Moderate
- 2 development applications open within 300 mLowFree check
- 5 City trees in front of this lotLowFree check
- Yonge-Eglinton Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
15 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-10-16 | By-law investigation26 255378 ELS 00 IR | Election Signs | Closed | |
| 2026-07-25 | By-law investigation26 208702 GRA 00 IR | Graffiti | Closed | |
| 2026-06-26 | By-law investigation26 191853 GRA 00 IR | Graffiti | Closed | |
| 2026-04-11 | By-law investigation26 142174 GRA 00 IR | Graffiti | Closed | |
| 2026-01-30 | Zoning review25 248864 PSP | No description on file | Closed | |
| 2025-11-17 | Zoning review25 254726 ZAP | No description on file | Application On Hold | |
| 2025-11-04 | Development application25 248864 NNY 08 SA | Site Plan Control Application proposes the development of a 13-storey residential retirement building. The building will provide a total of 208 residential units, being a mix of studio, 1-bedroom, 1 bedroom + den, and 2-bedroom. The retirement residence will offer a range of living options, including memory care, assisted living, independent living, and rental replacement units. A paved access from Alexandra Blvd along the west property line will be provided, leading to 1 level of below-grade parking, providing a total of 24 parking spaces; as well as 35 bicycle parking spaces. The proposed development provides a total GFA of 20,860 square metres and a FSI of 6.93. Additionally, the proposed development provides 3,325.00 square metres of indoor amenity space and 1,023.00 square metres of outdoor amenity space. | NOAC Issued | |
| 2025-10-02 | By-law investigation25 234256 SIN 00 IR | Signs | Closed | |
| 2025-05-28 | Zoning review25 120999 POZ | No description on file | Closed | |
| 2025-04-26 | By-law investigation25 149781 ELS 00 IR | Election Signs | Closed | |
| 2025-02-24 | Development application25 120999 NNY 08 OZ | OPA & Rezoning Application proposes the development of a 13-storey seniors residence providing residential suites, assisted living suites and memory care suites. The building will provide a total of 251 residential units, being a mix of studios, 1-bedroom, 1-bedroom + den and 2-bedroom units. A paved pick up/drop off forecourt along the western property line will be provided, leading to 1 level of below-grade parking, providing a total of 24 parking spaces; as well as 35 bicycle parking spaces. The proposal also includes a 205 square metre public park addition to Snider Parkette and 370 square metre privately owned publicly accessible spaces (POPS). | Council Approved | |
| 2020-09-16 | Development application20 194146 NNY 08 OZ | Zoning By Law Amendment application for a 9 storey building, containing residential uses and retail on the ground floor. Adopted at NYCC June 28, 2022, City Council July 19, 2022. Zoning By-law 830-2022 enacted July 22, 2022. Section 37 benefits included - see PB folder for information. | Closed | |
| 2019-04-30 | Building permit19 131023 | To demolish existing two storey funeral home | Closed | |
| 2008-11-28 | Building permit08 225598 | Installation of backflow preventor to the existing Trull Funeral & Cremation Centre | Closed | |
| 2005-11-22 | Building permit05 190510 | Renovation to existing elevator shaft for new elevator (lift) and alterations to partitions and finishes | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(764)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(764)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
5 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(764)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c0.5; r3.0) SS2 (x764)
- Height limit
- 27 m
- Corner lot
- Yes, also on Alexandra Blvd
- Public lane
- None
- House footprint
- 591 m²
- Back yard
- 15.7 m
- Buildings on the lot
- 2
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 2 development applications open within 300 m, up to 13 storeys
- 5 suite and multiplex permits within 300 m in 10 years
- 48 minor variance decisions within 300 m, 96% approved
What this part means for this house, in plain EnglishUnlock
2 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
- Break and enter: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Lawrence Park South neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Lawrence StationNearest station15 min walk
- Yonge St at Lytton BlvdNearest TTC stop1 min walk
- Duplex AveNearest cycling route3 min walk
- Blyth Academy School - Lawrence ParkSchool2 min walk
- St Clements Early LearningSchool8 min walk
- St Clements SchoolSchool8 min walk
- John Ross Robertson Jr Public SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3200.2
- Robberycity median 69.535.3
- Auto theftcity median 192.6176.6
- Theft over $5,000city median 46.141.2
- Break and entercity median 172.8288.5
- Theft from vehiclescity median 188.188.3
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist