HousePrecheckCheck an address

268 Royal York RdMimico-Queensway, Toronto · City records before you offer

24.1 × 127.8 m2,627 m²on Royal York Rd

2 things to check before you offer, including work or applications in progress
N20 m
24.1 m frontage127.8 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 268 Royal York Rd

268 Royal York Rd is on a 24.1 m by 127.8 m lot on Royal York Rd in Mimico-Queensway. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one.

The City has 5 records on this lot since 1991. That is more than at 93% of Toronto houses. In 2022, a development application was filed: "The proposed development consists of a mixed-use building with 36 storey and 29 storey towers (respectively 116.2 m and 98.7 m in height excl. mechanical…". Status: under review. In 2021, a development application was filed: "Revised site plan control application to permit a mixed-use development consisting of a mixed-use building with 37 storey and 23 storey towers (respectively…". Status: under review. In 2021, a development application was filed: "Revised draft plan of subdivision application to create six blocks for a mixed-use development: a residential development block, future development block…". Status: under review. Nothing on file is open right now.

Within 300 m, 9 development applications are open (the tallest up to 51 storeys). Within 300 m, the Committee of Adjustment decided 13 minor variance applications in the last 10 years and approved 100%. Mimico GO station is a 5-minute walk.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Zoning not in By-law 569-2013Moderate
  • 9 development applications open within 300 mLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

5 records on file, more than at 93% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2022-09-22Development application
22 207193 WET 03 OZ
The proposed development consists of a mixed-use building with 36 storey and 29 storey towers (respectively 116.2 m and 98.7 m in height excl. mechanical penthouses) 413 sqm of retail at grade, a 12,374 sqm multi-storey self-storage building as a future phase, and a 1,146 m² public park.Related applications: Zoning Amendment (21 236250 WET 03 OZ), Subdivision (21 236297 WET 03 SB), Site Plan (21 252097 WET 03 SA)Under Review
2021-12-30Development application
21 252097 WET 03 SA
Revised Site Plan Control application to permit a mixed-use development consisting of a mixed-use building with 37 storey and 23 storey towers (respectively 127 m and 84 m in height including mechanical penthouses) and a 3 level below grade parking garage as an initial phase, a multi-storey self-storage building as a future phase, and a 1,394 m² public park. The revised application proposes a total gross floor area of 51,726 m² in its first phase consisting of 824 residential units, comprising 613 studio/one-bedroom units (74.4%), 167 two-bedroom units (20.3%) and 44 three-bedroom units (5.3%), with 635 m² of retail space at-grade along its Royal York Road frontage. A total of 200 vehicular parking spaces, 619 bicycle spaces, and 2 loading spaces (1 Type 'G', 1 Type 'B') are proposed.Please note that the proposal has been expanded to include the property at 268 Royal York Road since the initial submission. (September 2022)Related applications: Official Plan Amendment (22 207193 WET 03 OZ), Zoning Amendment (21 236250 WET 03 OZ), Subdivision (21 236297 WET 03 SB)Under Review
2021-11-10Development application
21 236297 WET 03 SB
Revised Draft Plan of Subdivision application to create six blocks for a mixed-use development: a residential development block, future development block, parkland dedication, private driveway, pedestrian sidewalk and road widening.The proposed development consists of a mixed-use building with 37 storey and 23 storey towers (respectively 127 m and 84 m in height including mechanical penthouses) and a 3 level below grade parking garage as an initial phase, a multi-storey self-storage building as a future phase, and a 1,394 m² public park.Please note that the proposal has been expanded to include the property at 268 Royal York Road since the initial submission. (September 2022)Related applications: Official Plan Amendment (22 207193 WET 03 OZ), Zoning Amendment (21 236250 WET 03 OZ), Site Plan (21 252097 WET 03 SA)Under Review
2021-11-09Development application
21 236250 WET 03 OZ
The proposed development consists of a mixed-use building with 36 storey and 29 storey towers (respectively 116.2 m and 98.7 m in height excl. mechanical penthouses) 413 sqm of retail at grade, a 12,374 sqm multi-storey self-storage building as a future phase, and a 1,146 m² public park.Related applications: Zoning Amendment (21 236250 WET 03 OZ), Subdivision (21 236297 WET 03 SB), Site Plan (21 252097 WET 03 SA)OMB Appeal
1991-10-11Building permit
91 083502
1-STOREY STORAGE ADD TO COMM. BLDGCancelled
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Zoning not in By-law 569-2013
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Zoning not in By-law 569-2013

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
24.1 m frontage127.8 m deepon Royal York Rd
Zone
—
Height limit
—
Corner lot
No
Public lane
None
House footprint
408 m²
Back yard
76 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 9 development applications open within 300 m, up to 51 storeys
    • 2 suite and multiplex permits within 300 m in 10 years
    • 13 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 9 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 7 categories
    • Assault: 6.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Mimico-Queensway neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$84,000median $84,500
    Households that own their home53%median 54%
    Population (2021)17,045median 16,813
    Homes built in 1960 or before43%median 29%
    Homes needing major repairs7%median 7%

    Getting around and schools

    • Mimico GO StationNearest station5 min walk
    • Royal York Rd at Cavell Ave South SideNearest TTC stop1 min walk
    • Royal York RdNearest cycling route2 min walk
    • St Leo Catholic Elementary SchoolSchool3 min walk
    • St Leo Catholic Elementary School (future Address for Main Entrance)School3 min walk
    • Mimico Adult CentreSchool4 min walk
    • Phoenix Montessori SchoolSchool7 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.34209.2
    • Robberycity median 69.541.5
    • Homicidecity median 5.34.2
    • Auto theftcity median 192.6224.2
    • Theft over $5,000city median 46.166.4
    • Break and entercity median 172.8132.8
    • Theft from vehiclescity median 188.199.6

    More about Mimico-Queensway

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 268 Royal York Rd

    2 things to check at 268 Royal York Rd before you offer

    • Work or applications in progressModerate
    • Zoning not in By-law 569-2013Moderate
    • 9 development applications open within 300 mLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 3 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.