HousePrecheckCheck an address

2660 Eglinton Ave WBeechborough-Greenbrook, Toronto · City records before you offer

Commercial residential · CR 2.5 (c2.5; r2.5) SS2 (x142)≈ 30.0 × 32.8 m835 m²on Eglinton Ave W

1 thing to check before you offer, including work or applications in progress
N10 m
≈ 30.0 m frontage≈ 32.8 m deepirregular lot, estimated

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 2660 Eglinton Ave W

2660 Eglinton Ave W is on a 30 m by 32.8 m lot on Eglinton Ave W in Beechborough-Greenbrook. The zoning is CR. A site-specific exception, 900.11.10(142), changes some of the usual rules for this address.

The City has 24 records on this lot since 2012. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposal for alternative solution to send fire alarm signal to a third party "firetronic"". Status: approved. In 2024, a building permit was filed: "Alternative solution - per sentence 3.13.5.4.(1) of obc, each rapid transit station must be "monitored" by a central supervising station (css) conforming to…". Status: approved. In 2023, a building permit was filed: "Eclrt protection of standpipe systems f". Status: approved. Nothing on file is open right now.

Within 300 m, 3 development applications are open (the tallest up to 33 storeys). Keelesdale station is a 1-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(142)Moderate
  • 3 development applications open within 300 mLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

24 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-10-30Building permit
25 246880
Proposal for alternative solution to send fire alarm signal to a third party "Firetronic".Approved
2024-01-08Building permit
24 102461
Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of CSS and overall approach to fire safety in rapid transit stations and the role played by the CSS, our position of this provision is that monitoring in this context is not exclusively limited to monitoring of the fire alarm system. Further, it is our position that the intent behind this sentence is to ensure that the CSS meets the high level of reliability that would be achieved by complying with CAN/ULC-S561, including the robust fire alarm, emergency power and security requirements contained within this standard.Based on the review described in the SenezCo report dated January 8 2024, accompanying this submission, the coordination of system response for different fire emergencies, will provide the level of protection intended by OBC Sentences 3.13.5.4.(1) and 3.13.5.6.(2) for communication to the central supervising station, including the use of a certified 3rd party monitoring company to relay signals from the station fire alarm panels.Further, the BOCC was designed and constructed in a manner that substantially meets or otherwise meets the intent of CAN/ULC S561, and the functions intended by the OBC definition of a central supervising station. On this basis, and with the implementation of the protocols described in the SenezCo report, the operation of the transit system from the BOCC by CTS affords the level of protection anticipated by the OBC for transit stationsApproved
2023-05-30Building permit
23 152904
ECLRT Protection of Standpipe Systems fApproved
2023-03-30Building permit
15 268939
Revision 02 - addition of platform edge bollards (typical design approvals 22 193328, 22 200930, 22 216439 and 22 216647)Revision 01 - This is an amendment to permits for 15-268939. Refer to attached spreadsheet for the changes. Include Alternative Solution 19-259678 ALTConstruct new entrance for the LRT Keelesdale Station site - MetrolinxClosed
2022-12-22Development application
22 241752 WET 05 SA
The development applications would permit a 33-storey mixed use building with heightof 106.1 metres (112.1 inclusive of the mechanical penthouse), containing 370dwelling units, 324 square metres of non-residential space, 63 parking spaces and434 bicycle parking spaces within three levels of underground parking. The totalproposed gross floor area is 22,529 square metres, resulting in a density of 16.7 timesthe area of the lot.Appeal Received
2022-12-22Development application
22 241754 WET 05 OZ
The development applications would permit a 33-storey mixed use building with height of 106.1 metres (112.1 inclusive of the mechanical penthouse), containing 370 dwelling units, 324 square metres of non-residential space, 63 parking spaces and 434 bicycle parking spaces within three levels of underground parking. The total proposed gross floor area is 22,529 square metres, resulting in a density of 16.7 times the area of the lot.OMB Appeal
2022-11-15Building permit
22 156494
Installation of faregates and barriers/partitions connecting to adjacent walls to create a complete boundary between paid and unpaid station areas.Closed
2022-09-08Building permit
22 201167
Provide edge installation for bollard barriersCancelled
2022-08-16Building permit
22 191525
Procedures in place in lieu of Visual Alarms in stationApproved
2018-02-06Zoning review
13 165957 PSP
No description on fileClosed
2017-02-08Building permit
17 114352
Retail fire separatons for the Eglinton LRT line from Mount Dennis Station to Kennedy StationRefused
2017-01-18Building permit
17 105861
Electrical loads for Eglinton Crosstown LRT for operation of traction power and station/tunnel emergency ventilation system. From Mount Dennis Station to Kennedy StationApproved
2016-12-20Building permit
16 268966
Proposed that the opening in concourse floor assemblies at stations be provided with sprinkler protected glazed wall assemeblies from concourse to ceiling to be constructed in accordance with the requirement of ULC/ORD C263.1, "Sprinklered-Protected Window Systems"Refused
2016-11-18Building permit
16 253045
Proposed to permit the design and construction of the station entrance headhouses with no limit on the percentage of unprotected openings and no fire-resistance rating on the roof assembly based on the limited probability that flashover or full-compartment involvement will occur with these structures.Approved
2016-11-18Building permit
16 253033
Elevator shaft enclosures in the stations will be of glazed assemblies that will not comply with the acceptable solution of OBC Division B. An alternative solution approach is proposed to building code compliance relative to 2012 OBC of the elevator shaft construction requirements forming part of the then new Eglinton Crosstown LRT Project.Approved
2016-11-18Building permit
16 252979
Proposed design of the service rooms at rapid transit stations does not comply with the applicable egress requirements. The alternative approach to compliance for service rooms and suites is base on the provision of these being normally unoccupied and controlled access for authorized staff, fire separation of not less than 1-hour fire-resistance rating from adjacent floor areas, provision for audible and visual notification devices for emergency notification, separate fire alarm zoning for the west service suites at concourse and platform level, and timed egress analysis for extended length of travel requirements.Approved
2016-07-05Building permit
16 185400
Alternative Solutions for the headroom clearance for the stations and stops (MSF Service)for the Eglinton Crosstown LRT to run from Mount Dennis (Weston Rd) and Kennedy stationRefused
2016-06-16Building permit
16 175498
Alternative Solutions for the Unsprinklered Escalator Truss Spaces at Stations for the Eglinton Crosstown LRT to run from Mount Dennis (Weston Rd) and Kennedy station See also 14-153120 ALTApproved
2016-06-16Building permit
16 175489
Alternative Solutions for the Building Code submission for the Eglinton Crosstown LRT to run from Mount Dennis (Weston Rd) and Kennedy stationCancelled
2016-01-27Building permit
15 259524
Demolish existing ambulatory building for the future Keele Station Emergency Exit building for the Eglinton LRT LineClosed
2013-03-14Development application
13 133203 WET 12 SA
Eglinton Crosstown LRT - Keelesdale Station including secondary entrance(s), vent shafts, traction sub-station and bus terminal.Closed
2013-03-13Development application
13 132793 WET 12 SA
No description on fileClosed
2013-03-12Development application
13 132074 WET 12 SA
No description on fileClosed
2012-05-04Zoning review
12 166729 ZPR
No description on fileClosed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(142)
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(142)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(142)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
≈ 30.0 m frontage≈ 32.8 m deepon Eglinton Ave W
Zone
CR 2.5 (c2.5; r2.5) SS2 (x142)
Height limit
24 m
Corner lot
No
Public lane
None
House footprint
145 m²
Back yard
8.3 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 3 development applications open within 300 m, up to 33 storeys
    • In the Keelesdale station area
    • 24 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 3 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime near median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 7 categories
    • Robbery: 2.1 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Beechborough-Greenbrook neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$62,400median $84,500
    Households that own their home34%median 54%
    Population (2021)6,260median 16,813
    Homes built in 1960 or before42%median 29%
    Homes needing major repairs12%median 7%

    Getting around and schools

    • Keelesdale StationNearest station1 min walk
    • Keelesdale Station Westbound PlatformNearest TTC stop1 min walk
    • Eglinton Ave WNearest cycling route3 min walk
    • York Memorial Collegiate Institute (under Construction)School2 min walk
    • Charles E Webster Jr Public SchoolSchool5 min walk
    • Keelesdale Jr Public SchoolSchool7 min walk
    • Silverthorn Community SchoolSchool9 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3692.3
    • Robberycity median 69.5148.3
    • Shootingscity median 10.512.4
    • Auto theftcity median 192.6247.2
    • Theft over $5,000city median 46.137.1
    • Break and entercity median 172.8111.3
    • Theft from vehiclescity median 188.1148.3

    More about Beechborough-Greenbrook

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 2660 Eglinton Ave W

    1 thing to check at 2660 Eglinton Ave W before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(142)Moderate
    • 3 development applications open within 300 mLow

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 3 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.