HousePrecheckCheck an address

255 Dundas St EMoss Park, Toronto · City records before you offer

Also 251 Dundas St E

Commercial residential · CR 1.5 (c1.0; r1.0) SS2 (x2389)8.7 × 43.4 m365 m²on Dundas St Ecorner, also on Pembroke St

2 things to check before you offer, including heritage property: in a Heritage Conservation District (Part V)
N20 m
8.7 m frontage43.4 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 255 Dundas St E

255 Dundas St E is on a 8.7 m by 43.4 m lot on Dundas St E in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(2389), changes some of the usual rules for this address. The lot also fronts Pembroke St. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.

The City has 7 records on this lot since 2010. That is more than at 97% of Toronto houses. In 2022, a development application was filed: "Site plan approval application to facilitate the redevelopment of the site for a 49-storey mixed-use building having a non-residential gross floor area of…". Status: under review. In 2022, a development application was filed: "Revised official plan amendment and zoning by-law amendment application has been submitted to permit a 52-storey mixed-use building containing 630 dwelling…". Status: council approved. In 2016, a building permit was filed: "Revision to change door to wall in basement furnace room". Status: closed. Nothing on file is open right now.

Within 300 m, 11 development applications are open (the tallest up to 60 storeys). TMU station is a 11-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Heritage property: in a Heritage Conservation District (Part V)Moderate
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2389)Moderate
  • 11 development applications open within 300 mLowFree check
  • Priority retail street: Dundas Street EastLow
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

7 records on file, more than at 97% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2022-03-18Development application
22 124213 STE 13 SA
Site Plan Approval application to facilitate the redevelopment of the site for a 49-storey mixed-use building having a non-residential gross floor area of 198.40 square metres, and a residential gross floor area of 41,363.20 square metres. 678 residential dwelling units are proposed, of which, 8 are rental replacement units.Under Review
2022-03-18Development application
22 124214 STE 13 OZ
Revised Official Plan Amendment and Zoning By-law Amendment application has been submitted to permit a 52-storey mixed-use building containing 630 dwelling units, 149 square metres of retail GFA and 36,600 square metres of residential GFA,. No vehicle parking is proposed. 699 bicycle parking spaces are proposed. A related Site Plan Control Application has been submitted (2022 124213 STE 13 SA).Council Approved
2016-03-21Building permit
09 139853
Revision to change door to wall in basement furnace room.Closed
2015-12-09Building permit
08 200713
Revision # 02 - To block off the stairs from the ground floor to the basement and to replace glass wall with a masonry wall at the rear.Revision to add a commercial unit on the ground floor. Original permit was to convert to a three unit residential building. Applicant now wants add a commercial unit in addtion to the three residential units. As a result of the additional commercial unit the residential units have a smaller floor area.Closed
2015-02-24Zoning review
15 120669 LTO
No description on fileClosed
2014-10-27Building permit
14 240474
Proposal for interior alterations on the ground floor of Unit 1, "Papa Johns Pizza"Closed
2010-06-18Zoning review
10 200444 LPR
No description on fileClosed
Some

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: in a Heritage Conservation District (Part V)
  • Site-specific exception 900.11.10(2389)
  • Priority retail street: Dundas Street East

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: in a Heritage Conservation District (Part V)

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.11.10(2389)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. Priority retail street: Dundas Street East

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2389)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N20 m
8.7 m frontage43.4 m deepon Dundas St E
Zone
CR 1.5 (c1.0; r1.0) SS2 (x2389)
Height limit
12 m
Corner lot
Yes, also on Pembroke St
Public lane
None
House footprint
183 m²
Back yard
19.1 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Major change

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 11 development applications open within 300 m, up to 60 storeys
    • In the Moss Park station area
    • 24 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 11 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 3 of 8 categories
    • Assault: 3.5 times the Toronto median
    • Robbery: 2.4 times the Toronto median
    • Break and enter: 2.0 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Moss Park neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$65,000median $84,500
    Households that own their home35%median 54%
    Population (2021)21,490median 16,813
    Homes built in 1960 or before17%median 29%
    Homes needing major repairs8%median 7%

    Getting around and schools

    • TMU StationNearest station11 min walk
    • Dundas St East at Sherbourne StNearest TTC stop2 min walk
    • Sherbourne StNearest cycling route2 min walk
    • Ecole Elementaire Gabrielle RoySchool2 min walk
    • Toronto Metropolitan University - School of Interior DesignSchool7 min walk
    • Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool8 min walk
    • St Michael's Choir School - SecondarySchool8 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32226.8
    • Robberycity median 69.5166.6
    • Homicidecity median 5.33.4
    • Shootingscity median 10.53.4
    • Auto theftcity median 192.681.6
    • Theft over $5,000city median 46.164.6
    • Break and entercity median 172.8350.2
    • Theft from vehiclescity median 188.1275.4

    More about Moss Park

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 255 Dundas St E

    2 things to check at 255 Dundas St E before you offer

    • Heritage property: in a Heritage Conservation District (Part V)Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2389)Moderate
    • 11 development applications open within 300 mLow
    • and 2 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 4 steps to take before you offer, so nothing slips
    • What each of the 6 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.