HousePrecheckCheck an address

2547 Yonge StMount Pleasant East, Toronto · City records before you offer

Commercial residential · CR SS2 (x530)5.4 × 40.3 m212 m²on Yonge Stbacks onto Sherwood Lane

2 things to check before you offer, including building permit open since 2018
N10 m
5.4 m frontage40.3 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 2547 Yonge St

2547 Yonge St is on a 5.4 m by 40.3 m lot on Yonge St in Mount Pleasant East. The zoning is CR. A site-specific exception, 900.11.10(530), changes some of the usual rules for this address. The City lists the property on its Heritage Register. Listing does not stop changes inside, but the City must get 60 days' notice before any demolition.

The City has 3 records on this lot since 2017. That is more than at 81% of Toronto houses. In 2018, a building permit was filed: "Revision - to reflect the as built conditionsproposed interior laterations and rear one storey addition to existing mixed use building and conversion of the…". Status: revision issued. In 2017, a building permit was filed: "In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign, displaying static copy, located on the…". Status: closed. In 2017, a zoning review was filed. Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 2 development applications are open (the tallest up to 15 storeys). Within 300 m, the Committee of Adjustment decided 38 minor variance applications in the last 10 years and approved 87%. Eglinton station is a 14-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2018ModerateFree check
  • Heritage property: listedModerate
  • Site-specific exception 900.11.10(530)Moderate
  • 2 development applications open within 300 mLowFree check
  • Yonge-Eglinton Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2018
  • No open orders or by-law investigations
  • No work or applications in progress

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2018

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

3 records on file, more than at 81% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2018-01-17Building permit
17 198789
REVISION - to reflect the as built conditionsProposed interior laterations and rear one storey addition to existing mixed use building and conversion of the ground floor into eating establishment.Revision Issued
2017-11-14Building permit
17 255496
In conjunction with a two storey building on the premises, proposal to erect and display one illuminated wall sign, displaying static copy, located on the first and second storey west elevation. The proposed sign is 0.81 metres vertically by 1.92 metres horizontally at a height of 3.66 metres above grade.**LOUIE'S CLASSICO PIZZERIA**Closed
2017-05-31Zoning review
17 169957 ZZC
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Heritage property: listed
  • Site-specific exception 900.11.10(530)

What this part means for this house, in plain EnglishUnlock

  1. Heritage property: listed

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Site-specific exception 900.11.10(530)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  3. Yonge-Eglinton Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(530)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
5.4 m frontage40.3 m deepon Yonge St
Zone
CR SS2 (x530)
Height limit
27 m
Corner lot
No
Public lane
Sherwood Lane, 5.4 m along it
House footprint
111 m²
Back yard
13.5 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Active

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 2 development applications open within 300 m, up to 15 storeys
    • 3 suite and multiplex permits within 300 m in 10 years
    • 38 minor variance decisions within 300 m, 87% approved

    What this part means for this house, in plain EnglishUnlock

    1. 2 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime below median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 4 of 6 categories

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Mount Pleasant East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$110,000median $84,500
    Households that own their home55%median 54%
    Population (2021)16,370median 16,813
    Homes built in 1960 or before52%median 29%
    Homes needing major repairs5%median 7%

    Getting around and schools

    • Eglinton StationNearest station14 min walk
    • Yonge St at Sherwood AveNearest TTC stop1 min walk
    • Duplex AveNearest cycling route3 min walk
    • St Clements SchoolSchool2 min walk
    • St Clements Early LearningSchool3 min walk
    • John Fisher Jr Public SchoolSchool4 min walk
    • Blyth Academy School - Lawrence ParkSchool5 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.3336.5
    • Robberycity median 69.510.2
    • Auto theftcity median 192.6224.4
    • Theft over $5,000city median 46.145.9
    • Break and entercity median 172.8204
    • Theft from vehiclescity median 188.1107.1

    More about Mount Pleasant East

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 2547 Yonge St

    2 things to check at 2547 Yonge St before you offer

    • Building permit open since 2018Moderate
    • Heritage property: listedModerate
    • Site-specific exception 900.11.10(530)Moderate
    • 2 development applications open within 300 mLow
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 7 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.