HousePrecheckCheck an address

251 Markham StTrinity-Bellwoods, Toronto · City records before you offer

Residential · R (d0.6)5.3 × 38.6 m204 m²on Markham Stbacks onto College Pl

2 things to check before you offer, including building permit open since 2024
N10 m
5.3 m frontage38.6 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 251 Markham St

251 Markham St is on a 5.3 m by 38.6 m lot on Markham St in Trinity-Bellwoods. The zoning is R.

The City has 8 records on this lot since 2016. That is more than at 98% of Toronto houses. In 2026, a building permit was filed: "Proposal for multiple projects (interior alterations and second storey addition). see related party wall permit for 249 markham st. #26 119372 bld 00 srsee…". Status: inspection. In 2025, a Committee of Adjustment application was filed: "To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition (the second level will be cantilevered)". Status: closed. In 2024, a building permit was filed: "Alterations to existing detached garage, new flat roof, replace doors and windows". Status: inspection. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 1 development application is open (the tallest up to 6 storeys). Within 300 m, the Committee of Adjustment decided 65 minor variance applications in the last 10 years and approved 88%. The nearest TTC stop is Bathurst St at Nassau St - Toronto Western Hospital, a 1-minute walk.

Summary

What the City's records show on this house

  • Building permit open since 2024ModerateFree check
  • Work or applications in progressModerateFree check
  • No permit for a second unit on fileLowFree check
  • A garden suite may lack room for its fire access pathLowFree check
  • 1 development application open within 300 mLowFree check
  • 1 City tree in front of this lotLowFree check
  • 1 Committee of Adjustment file on this lotLowFree check

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

What the rules allow here: Multiplex up to 4 units · Laneway suite

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2024
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2024

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  3. No permit for a second unit on file

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  4. 1 Committee of Adjustment file on this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

City files on this lot

8 records on file, more than at 98% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-04-15Building permit
26 104584
Proposal for multiple projects (interior alterations and second storey addition). See related party wall permit for 249 Markham St. #26 119372 BLD 00 SRSee related party wall permit for 253 Markham St #26 119382 BLD 00 SRInspection
2025-03-26Minor variance
A0097/25TEY
To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition (the second level will be cantilevered).Approved
2024-11-04Zoning review
24 234631 ZAP
No description on fileApplication On Hold
2024-05-17Building permit
24 146110
Alterations to existing detached garage, new flat roof, replace doors and windows.Inspection
2024-04-23Building permit
24 139809
EXISTING DETACHED GARAGE. DEMOLISH EXISTING SLOPED ROOF WITH NEW FLAT ROOF. REPLACE EXISTING DOORS AND WINDOWS.Cancelled
2022-11-02Building permit
22 221765
Admin party wall permit for work at 253 Markham St (22-217667)Closed
2018-07-13Building permit
18 193443
Proposal for interior alterations to first and second floor, new two storey rear addition to existing townhouse along with alterations to the roof of existing detached garage.Cancelled
2016-10-20Building permit
16 237436
Proposal for party wall administration permit in relation to 253 Markham Street, permit 16-216074 BLD.Closed
Clear

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • No heritage listing or designation
  • No site-specific zoning exception

What this part means for this house, in plain EnglishUnlock

  1. 1 City tree in front of this lot

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Good

Build potential

How much more the rules allow on this lot, beyond what is on record

  • Multiplex up to 4 units: allowed
  • Garden suite: needs a closer look
  • Laneway suite: likely fits

What this part means for this house, in plain EnglishUnlock

  1. A garden suite may lack room for its fire access path

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Multiplex up to 4 units

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Laneway suite

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

The lot and what the rules allow

N10 m
5.3 m frontage38.6 m deepon Markham St
Zone
R (d0.6)
Height limit
11 m
Corner lot
No
Public lane
College Pl, 5.3 m along it
New house permit
None since 2000
House footprint
106 m²
Back yard
15.7 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

Why, measured on this lot, and the most you could buildUnlock

Some

Building nearby

How much neighbours are building and applying to change within 300 m

  • 1 development application open within 300 m, up to 6 storeys
  • 21 suite and multiplex permits within 300 m in 10 years
  • 65 minor variance decisions within 300 m, 88% approved

What this part means for this house, in plain EnglishUnlock

  1. 1 development application open within 300 m

    LowCheck if it applies

    What the record shows, what it means for you and what to doUnlock

What the City allowed next door

Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

What neighbours have built and changed around you, and how the City decidedUnlock

Crime near median

Area safety

Police-reported crime in the neighbourhood against the Toronto median

  • Lower than the Toronto median in 3 of 7 categories
  • Break and enter: 2.0 times the Toronto median
  • Theft over $5,000: 1.5 times the Toronto median

Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

What this part means for this house, in plain EnglishUnlock

Trinity-Bellwoods neighbourhood

About the area, not this house.

2021 Census, against the median Toronto neighbourhood

Median household income (2020)$92,000median $84,500
Households that own their home56%median 54%
Population (2021)15,415median 16,813
Homes built in 1960 or before68%median 29%
Homes needing major repairs8%median 7%

Getting around and schools

  • Bathurst StationNearest station21 min walk
  • Bathurst St at Nassau St - Toronto Western HospitalNearest TTC stop1 min walk
  • Palmerston AveNearest cycling route2 min walk
  • Kensington Community SchoolSchool4 min walk
  • Westside Montessori Elementary SchoolSchool6 min walk
  • King Edward Jr & Sr Public SchoolSchool7 min walk
  • St Francis of Assisi Catholic Elementary SchoolSchool9 min walk

Police-reported crime, 2025, per 100,000 people

  • Assaultcity median 636.3946.7
  • Robberycity median 69.558.4
  • Shootingscity median 10.55.8
  • Auto theftcity median 192.676
  • Theft over $5,000city median 46.170.1
  • Break and entercity median 172.8350.6
  • Theft from vehiclescity median 188.1280.5

More about Trinity-Bellwoods

Ready emails

Copy and send as they are.

4 questions for the seller and your lawyer, written outUnlock

What we checked, and what the City's records don't cover

We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

See every source and when we loaded it · Pre-offer checklist

Something here not right?

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

Full pre-offer report · 251 Markham St

2 things to check at 251 Markham St before you offer

  • Building permit open since 2024Moderate
  • Work or applications in progressModerate
  • No permit for a second unit on fileLow
  • A garden suite may lack room for its fire access pathLow
  • and 3 more

The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

$29 CAD one time · opens right away

See a sample report

Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

Also in the report

  • A PDF to forward to your agent and lawyer
  • What you can build on this lot, measured on it
  • Every line linked to the City record it comes from
  • 15 sets of public records, already searched and read for you
  • A clear list of the 6 steps to take before you offer, so nothing slips
  • What each of the 7 findings can cost you or stop you doing, in plain English
  • A two-minute summary of this house, and what to find out first before you offer
  • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
  • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
  • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.