Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 245 Torrens Ave
245 Torrens Ave is on a 9.1 m by 45.7 m lot on Torrens Ave in Old East York. The zoning is RD.
The City has 15 records on this lot since 2025. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "New three-storey semi-detached dwelling on a conveyed lot". Status: inspection. In 2026, a building permit was filed: "Proposal to demolish existing dwelling and construct a new three-storey single family semi-detached dwelling with integral garage". Status: permit issued. In 2026, a Committee of Adjustment application was filed: "To construct a new three-storey semi-detached dwelling (basement level is considered the first level) with an integral garage, a front porch, a rear ground…". Status: closed. 3 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 1 development application is open (the tallest up to 7 storeys). The nearest TTC stop is Donlands Ave at Torrens Ave, a 2-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- No permit for a second unit on fileLowFree check
- 1 development application open within 300 mLowFree check
- 3 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
3 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
15 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-09-16 | Building permit26 216620 | New three-storey semi-detached dwelling on a conveyed lot | Inspection | |
| 2026-09-01 | Building permit26 216648 | Proposal to demolish existing dwelling and construct a new three-storey single family semi-detached dwelling with integral garage. | Permit Issued | |
| 2026-09-01 | Building permit26 216608 | Proposal to demolish existing dwelling and construct a new three-storey single family semi-detached dwelling with integral garage. | Inspection | |
| 2026-05-13 | Consent (lot split)B0022/26TEY | To obtain consent to sever the property into two undersized residential lots. | Approved | |
| 2026-05-13 | Minor varianceA0137/26TEY | To construct a new three-storey semi-detached dwelling (basement level is considered the first level) with an integral garage, a front porch, a rear ground floor (second level) deck, and a rear basement walkout. | Approved | |
| 2026-05-13 | Minor varianceA0136/26TEY | To construct a new three-storey semi-detached dwelling (basement level is considered the first level) with an integral garage, a front porch, a rear ground floor (second level) deck, and a rear basement walkout. | Approved | |
| 2026-01-27 | Zoning review26 109634 ZAP | No description on file | Closed | |
| 2026-01-27 | Zoning review26 109631 ZAP | No description on file | Closed | |
| 2025-10-27 | Building permit25 245276 | Proposal to construct a three storey building with 6 units. (520.7m2) | Cancelled | |
| 2025-10-07 | Building permit25 236649 | Proposal to construct a two storey garden suite. | Cancelled | |
| 2025-10-06 | Building permit25 235819 | PROPOSAL TO DEMOLISH A ONE STOREY SINGLE FAMILY DWELLING AND CONSTRUCT A NEW THREE STOREY SIX-UNIT APARTMENT BUILDING | Cancelled | |
| 2025-01-27 | Zoning review25 109129 ZAP | No description on file | Cancelled | |
| 2025-01-27 | Zoning review25 109120 ZAP | No description on file | Closed | |
| 2025-01-27 | Zoning review25 109117 ZAP | No description on file | Closed | |
| 2025-01-27 | Zoning review25 109100 ZAP | No description on file | Application On Hold |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: allowed
- Garden suite: likely fits
- Secondary suite: allowed
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- RD (f6.0; a185; d0.75)
- Height limit
- 8.5 m
- Lot coverage limit
- 35%
- Corner lot
- No
- Public lane
- None
- New house permit
- 2026
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 7 storeys
- In the Cosburn station area
- 21 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Old East York neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Donlands StationNearest station22 min walk
- Donlands Ave at Torrens AveNearest TTC stop2 min walk
- Cosburn AveNearest cycling route3 min walk
- William Burgess Elementary SchoolSchool6 min walk
- Holy Cross Catholic Elementary SchoolSchool6 min walk
- The Three Hierarchs AcademySchool8 min walk
- Chester Elementary SchoolSchool13 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3655.3
- Robberycity median 69.559.6
- Shootingscity median 10.59.9
- Auto theftcity median 192.6238.3
- Theft over $5,000city median 46.149.6
- Break and entercity median 172.899.3
- Theft from vehiclescity median 188.1268.1
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist