Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 240 Manor Rd E
240 Manor Rd E is on a 30.5 m by 38.9 m lot on Manor Rd E in Mount Pleasant East. The zoning is R. A site-specific exception, 900.2.10(930), changes some of the usual rules for this address.
The City has 10 records on this lot since 2014. That is more than at 99% of Toronto houses. In 2025, a building permit was filed: "Proposal for fire alarm system modification and install heat detectors". Status: permit issued. In 2024, a building permit was filed: "Fire alarm system modification". Status: inspection. In 2021, a building permit was filed: "Underpinning a retaining wall to facilitate the removal of the contaminated soil". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Mount Pleasant station is a 9-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2024ModerateFree check
- Work or applications in progressModerateFree check
- Site-specific exception 900.2.10(930)Moderate
- No permit for a second unit on fileLowFree check
- 3 City trees in front of this lotLowFree check
- Yonge-Eglinton Secondary PlanLow
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 4 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2024
- Work or applications in progress
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Building permit open since 2024
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-10-02 | Building permit25 225428 | Proposal for fire alarm system modification and install heat detectors | Permit Issued | |
| 2024-01-15 | Building permit23 236618 | Fire Alarm System Modification | Inspection | |
| 2021-12-23 | Building permit21 238111 | Underpinning a retaining wall to facilitate the removal of the contaminated soil | Closed | |
| 2016-06-06 | Building permit15 231860 | REV - 01 for a new exterior canopy on the east side of the church. | Closed | |
| 2016-04-13 | Minor varianceA0117/16TEY | To maintain the existing place of worship and add a day nursery within the existing building on the reduced lot, and to construct a new east side walkway and staircase with canopy above, which comes as a result of the eastern portion of the property being severed from the lot and transferred to the City of Toronto. To two-storey portion of the existing building located on the conveyed lot will be demolished. NOTE: On December 2, 2015, the Committee considered the subject proposal and approved variances to the Zoning By-law by virtue of Minor Variance Decision A0966/15TEY. However, due to a miscommunication, a variance pertaining to the new canopy was omitted from the hearing notice, and is now identified below for consideration under By-law 569-2013. | Approved | |
| 2016-03-30 | Building permit15 231874 | Proposal for a new domestic water line on exterior of building | Closed | |
| 2016-03-15 | Building permit16 117673 | Proposal to demolish existing 1 storey auditorium and breezeway building. New Address - 250 MANOR RD E. (Lots 39,40) Note: See active BLD 15 231860 for adjacent renovation including alterations to existing adjoining wall at 240 Manor Rd East. | Closed | |
| 2015-12-02 | Minor varianceA0966/15TEY | To maintain the existing place of worship and add a day nursery within the existing building on the reduced lot, which comes as a result of the eastern portion of the property being severed from the lot and transferred to the City of Toronto. To two-storey portion of the existing building located on the conveyed lot will be demolished. | Approved | |
| 2015-09-30 | Zoning review15 230758 ZPR | No description on file | Cancelled | |
| 2014-12-03 | Zoning review14 259540 ZPR | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(930)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(930)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
3 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(930)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 4 units: likely fits
- Secondary suite: likely fits
- No public lane, so no laneway suite
What this part means for this house, in plain EnglishUnlock
Multiplex up to 4 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6) (x930)
- Height limit
- 10 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 586 m²
- Back yard
- 5.5 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- In the Mount Pleasant station area
- 7 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Mount Pleasant East neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Mount Pleasant StationNearest station9 min walk
- Mt Pleasant Rd at Manor Rd EastNearest TTC stop4 min walk
- Broadway AveNearest cycling route12 min walk
- Manor Montessori - de Savery SiteSchool7 min walk
- Toronto Stem SchoolSchool7 min walk
- Hodgson Middle SchoolSchool7 min walk
- Toronto Prep SchoolSchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3336.5
- Robberycity median 69.510.2
- Auto theftcity median 192.6224.4
- Theft over $5,000city median 46.145.9
- Break and entercity median 172.8204
- Theft from vehiclescity median 188.1107.1
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist