HousePrecheckCheck an address

239 Yonge StDowntown Yonge East, Toronto · City records before you offer

Commercial residential · CR 4.0 (c4.0; r4.0) SS1 (x2114)8.7 × 37.6 m324 m²on Yonge Stbacks onto O'Keefe Lane

2 things to check before you offer, including building permit open since 2024
N10 m
8.7 m frontage37.6 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 239 Yonge St

239 Yonge St is on a 8.7 m by 37.6 m lot on Yonge St in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(2114), changes some of the usual rules for this address.

The City has 13 records on this lot since 1998. That is more than at 99% of Toronto houses. In 2025, a development application was filed: "Site plan approval for a 67-storey mixed use building with 787 square metres of non-residential uses at grade. a total of 774 residential units are proposed". Status: under review. In 2025, a development application was filed: "Combined official plan & zoning by-law amendment for a 67-storey mixed use building with 787 square metres of non-residential uses at grade. a total of 774…". Status: under review. In 2024, a building permit was filed: "Rev01: layout revision due to site conditionproposed interior alterations to convert an existing vacant unit into a recreation use". Status: revision issued. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 11 development applications are open (the tallest up to 71 storeys). Within 300 m, the Committee of Adjustment decided 7 minor variance applications in the last 10 years and approved 100%. TMU station is a 3-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Building permit open since 2024ModerateFree check
  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(2114)Moderate
  • 11 development applications open within 300 mLowFree check
  • Priority retail street: Yonge StreetLow
  • Site and Area Specific Policy 174Low
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

2 things to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

Check carefully

Open City files

How much in the City's records needs answers before an offer

  • Building permit open since 2024
  • Work or applications in progress
  • No open orders or by-law investigations

What this part means for this house, in plain EnglishUnlock

  1. Building permit open since 2024

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

  2. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

13 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2025-06-05Zoning review
25 171912 LPR
No description on fileClosed
2025-02-11Zoning review
25 102468 POZ
No description on fileClosed
2025-01-08Development application
25 102470 STE 13 SA
Site Plan Approval for a 67-storey mixed use building with 787 square metres of non-residential uses at grade. A total of 774 residential units are proposed.Under Review
2025-01-08Development application
25 102468 STE 13 OZ
Combined Official Plan & Zoning By-law Amendment for a 67-storey mixed use building with 787 square metres of non-residential uses at grade. A total of 774 residential units are proposed.Under Review
2024-09-30Building permit
24 178273
REV01: Layout revision due to site conditionProposed interior alterations to convert an existing vacant unit into a recreation use.Revision Issued
2023-01-11Building permit
20 213378
REV #1-REMOVE MAGLOCKProposal to add stairs on top roof, rear egress stair and access door for servicing the fire exit of 241 St.Closed
2019-12-23Zoning review
19 264267 ZZC
No description on fileClosed
2005-12-20Building permit
05 195253
Interior alterior renovation to add a replace an existing staircaseClosed
2003-02-20Zoning review
03 110023 ZPU
No description on fileClosed
2002-06-13Zoning review
02 145765 ZSV
No description on fileClosed
2002-05-01Zoning review
02 131702 ZPR
No description on fileClosed
2002-04-05Building permit
02 102534
make interior alterations for retail store purposes and alter storefront tenant: stitches. Hold for Letter of Undertaking.Closed
1998-10-06Zoning review
98 026727 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(2114)
  • Priority retail street: Yonge Street
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(2114)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Yonge Street

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Site and Area Specific Policy 174

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  4. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(2114)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
8.7 m frontage37.6 m deepon Yonge St
Zone
CR 4.0 (c4.0; r4.0) SS1 (x2114)
Height limit
30 m
Corner lot
No
Public lane
O'Keefe Lane, 8.5 m along it
House footprint
318 m²
Back yard
0.2 m
Buildings on the lot
1

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 11 development applications open within 300 m, up to 71 storeys
    • In the Dundas station area
    • 7 minor variance decisions within 300 m, 100% approved

    What this part means for this house, in plain EnglishUnlock

    1. 11 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • TMU StationNearest station3 min walk
    • Opposite 247 Yonge St - Toronto Eaton CentreNearest TTC stop1 min walk
    • Shuter StNearest cycling route1 min walk
    • St Michael's Choir School - Gymnasium BldgSchool2 min walk
    • St Michael's Choir School - Choral BldgSchool2 min walk
    • St Michael's Choir School - ElementarySchool3 min walk
    • St Michael's Choir School - SecondarySchool3 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    4 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 239 Yonge St

    2 things to check at 239 Yonge St before you offer

    • Building permit open since 2024Moderate
    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(2114)Moderate
    • 11 development applications open within 300 mLow
    • and 3 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 7 steps to take before you offer, so nothing slips
    • What each of the 7 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.