Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 237 Dundas St E
237 Dundas St E is on a 7.2 m by 30.5 m lot on Dundas St E in Moss Park. The zoning is CR. A site-specific exception, 900.11.10(2389), changes some of the usual rules for this address. The property is inside a Heritage Conservation District, so many outside changes need a City heritage permit.
The City has 4 records on this lot since 2004. That is more than at 88% of Toronto houses. In 2022, a development application was filed: "Site plan approval application to facilitate the redevelopment of the site for a 49-storey mixed-use building having a non-residential gross floor area of…". Status: under review. In 2022, a development application was filed: "Revised official plan amendment and zoning by-law amendment application has been submitted to permit a 52-storey mixed-use building containing 630 dwelling…". Status: council approved. In 2021, a zoning review was filed. Status: closed. Nothing on file is open right now.
Within 300 m, 11 development applications are open (the tallest up to 60 storeys). TMU station is a 11-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Heritage property: in a Heritage Conservation District (Part V)Moderate
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(2389)Moderate
- 11 development applications open within 300 mLowFree check
- Priority retail street: Dundas Street EastLow
- Downtown Plan Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- No open orders or by-law investigations
- No permits left open for years
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
4 records on file, more than at 88% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2022-03-18 | Development application22 124213 STE 13 SA | Site Plan Approval application to facilitate the redevelopment of the site for a 49-storey mixed-use building having a non-residential gross floor area of 198.40 square metres, and a residential gross floor area of 41,363.20 square metres. 678 residential dwelling units are proposed, of which, 8 are rental replacement units. | Under Review | |
| 2022-03-18 | Development application22 124214 STE 13 OZ | Revised Official Plan Amendment and Zoning By-law Amendment application has been submitted to permit a 52-storey mixed-use building containing 630 dwelling units, 149 square metres of retail GFA and 36,600 square metres of residential GFA,. No vehicle parking is proposed. 699 bicycle parking spaces are proposed. A related Site Plan Control Application has been submitted (2022 124213 STE 13 SA). | Council Approved | |
| 2021-05-19 | Zoning review21 157065 LTO | No description on file | Closed | |
| 2004-03-29 | Zoning review04 120289 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Heritage property: in a Heritage Conservation District (Part V)
- Site-specific exception 900.11.10(2389)
- Priority retail street: Dundas Street East
What this part means for this house, in plain EnglishUnlock
Heritage property: in a Heritage Conservation District (Part V)
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(2389)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Priority retail street: Dundas Street East
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2389)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 1.5 (c1.0; r1.0) SS2 (x2389)
- Height limit
- 12 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 76 m²
- Back yard
- 15.2 m
- Buildings on the lot
- 3
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 11 development applications open within 300 m, up to 60 storeys
- In the Moss Park station area
- 23 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
11 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Assault: 3.5 times the Toronto median
- Robbery: 2.4 times the Toronto median
- Break and enter: 2.0 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Moss Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- TMU StationNearest station11 min walk
- Dundas St East at Sherbourne StNearest TTC stop2 min walk
- Sherbourne StNearest cycling route2 min walk
- Ecole Elementaire Gabrielle RoySchool2 min walk
- Toronto Metropolitan University - School of Interior DesignSchool7 min walk
- Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool8 min walk
- St Michael's Choir School - SecondarySchool8 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.32226.8
- Robberycity median 69.5166.6
- Homicidecity median 5.33.4
- Shootingscity median 10.53.4
- Auto theftcity median 192.681.6
- Theft over $5,000city median 46.164.6
- Break and entercity median 172.8350.2
- Theft from vehiclescity median 188.1275.4
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist