Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2350 Yonge St
2350 Yonge St is on a 5.6 m by 41.2 m lot on Yonge St in Yonge-Eglinton. The zoning is CR. A site-specific exception, 900.11.10(2433), changes some of the usual rules for this address.
The City has 18 records on this lot since 1991. That is more than at 99% of Toronto houses. In 2022, a development application was filed: "Proposal for 50-storey residential building containing a total of 323 residential dwelling units. the proposed development will have a total gross floor area…". Status: under review. In 2018, a building permit was filed: "Proposed installation of a back flow prevention device for an existing mixed-use building". Status: closed. In 2014, a building permit was filed: "Proposal to remove the fire alarm in the building, related to permit #14-107541". Status: closed. Nothing on file is open right now.
Within 300 m, 30 development applications are open (the tallest up to 65 storeys). Within 300 m, the Committee of Adjustment decided 14 minor variance applications in the last 10 years and approved 100%. Eglinton station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Site-specific exception 900.11.10(2433)Moderate
- 1 by-law investigation closed in the last two yearsLow
- 30 development applications open within 300 mLowFree check
- Yonge-Eglinton Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- 1 by-law investigation closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 by-law investigation closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
18 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-11-23 | Zoning review26 273400 LTO | No description on file | Closed | |
| 2026-05-04 | By-law investigation26 154341 PRS 00 IR | Property Standards | Closed | |
| 2025-11-04 | Zoning review25 248840 LTO | No description on file | Closed | |
| 2024-08-01 | Zoning review24 191437 LTO | No description on file | Closed | |
| 2022-12-02 | Zoning review22 235431 LTO | No description on file | Closed | |
| 2022-07-29 | Zoning review22 176294 PRZ | No description on file | Closed | |
| 2022-07-13 | Development application22 176293 NNY 08 SA | Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential space. (see 21-144988 NNY 8 PAC) | Under Review | |
| 2022-07-13 | Development application22 176294 NNY 08 OZ | Proposal for 50-storey residential building containing a total of 323 residential dwelling units. The proposed development will have a total gross floor area (GFA) of approximately 20,562 square metres, comprised entirely of residential space. (see 21-144988 NNY 8 PAC) | OMB Appeal | |
| 2018-03-07 | Building permit18 117465 | Proposed installation of a back flow prevention device for an existing mixed-use building. | Closed | |
| 2014-08-29 | Building permit14 166922 | Proposal to remove the fire alarm in the building, related to permit #14-107541 | Closed | |
| 2014-04-30 | Building permit14 107541 | To complete interior alterations to open a new restaurant "Star King Viet Thai Cuisine" which will contain 30 seats (max.). | Closed | |
| 2013-08-28 | Zoning review13 227816 LPR | No description on file | Closed | |
| 2013-02-06 | Building permit11 272525 | Revision - removal of non-load bearing walls and corridor, to create second egress (fire escape for all floors) on main floor for existing tenant Novus Optical, remove staircase and demising wall to create space for one tenant only (previous two tenants) add washroom on second floor, remove staircase on third floor | Closed | |
| 2010-10-27 | Minor varianceA0417/10NY | The applicant proposes to construct a two storey commercial addition at the rear (west side) of an existing three storey commercial building. The addition would provide for an optometrist office on the main floor and additional office space on the second floor, requiring a total of four (4) parking spaces, as stated in Toronto Zoning By-law 438-86. The applicant is proposing to provide two (2) parking spaces. | Approved | |
| 2010-03-30 | Zoning review10 142603 ZZC | No description on file | Closed | |
| 2003-02-05 | Zoning review03 106427 LTO | No description on file | Closed | |
| 1997-03-19 | Building permit97 012843 | MAKE INTERIOR ALTERATIONS AND CONVERT RESTAURNT ON FIRST FLOOR TO CONVERT USE TO OFFICE/RETAIL STORE. JB | Closed | |
| 1991-08-27 | Zoning review91 026834 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2433)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2433)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2433)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 3.0 (c2.0; r2.5) SS2 (x2433)
- Height limit
- 16 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 69 m²
- Back yard
- 25.3 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 30 development applications open within 300 m, up to 65 storeys
- In the Eglinton station area
- 14 minor variance decisions within 300 m, 100% approved
What this part means for this house, in plain EnglishUnlock
30 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 6 categories
- Theft over $5,000: 2.2 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Yonge-Eglinton neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Eglinton StationNearest station5 min walk
- Yonge St at Orchard View BlvdNearest TTC stop1 min walk
- Montgomery AveNearest cycling route2 min walk
- Caesar International AcademySchool3 min walk
- St Monica Catholic Elementary SchoolSchool4 min walk
- North Toronto Collegiate InstituteSchool4 min walk
- Eglinton Linc and Esl CentreSchool4 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3713.8
- Robberycity median 69.595.2
- Auto theftcity median 192.6115.6
- Theft over $5,000city median 46.1102
- Break and entercity median 172.8136
- Theft from vehiclescity median 188.154.4
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist