Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 235 Heath St E
235 Heath St E is on a 14.1 m by 41.4 m lot on Heath St E in Rosedale-Moore Park. The zoning is R. A site-specific exception, 900.2.10(977), changes some of the usual rules for this address. The lot also fronts Mount Pleasant Rd.
The City has 10 records on this lot since 2015. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Proposal for two storey garden suite with integral garage". Status: inspection. In 2025, a building permit was filed: "Rev: proposed structural alterations - fromt stair pier & beam; steel beams & posts for trimmer joists in 1st floor; conbination beam i 2nd floorproposed a new…". Status: revision issued. In 2025, a Committee of Adjustment application was filed: "To alter the existing rear one-storey ancillary building by constructing a one-storey west side addition (with a basement level), and a complete second storey…". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 47 minor variance applications in the last 10 years and approved 94%. St Clair station is a 14-minute walk.
Summary
What the City's records show on this house
- Work or applications in progressModerateFree check
- Records mention garden suiteModerateFree check
- Site-specific exception 900.2.10(977)Moderate
- 2 City trees in front of this lotLowFree check
- Yonge-St. Clair Secondary PlanLow
- 3 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Work or applications in progress
- Records mention garden suite
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Work or applications in progress
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
Records mention garden suite
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
3 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
10 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-02-06 | Building permit25 182016 | proposal for two storey garden suite with integral garage | Inspection | |
| 2025-12-10 | Building permit22 199989 | REV: Proposed structural alterations - fromt stair pier & beam; steel beams & posts for trimmer joists in 1st floor; conbination beam i 2nd floorProposed a new Single Family Dwelling Three Storey Detached House with a Finished Basement and a Detached Garage at the Rear Yard. (Existing Detached House & garage will be demolished). | Revision Issued | |
| 2025-02-26 | Minor varianceA1008/24TEY | To alter the existing rear one-storey ancillary building by constructing a one-storey west side addition (with a basement level), and a complete second storey addition above the entire building. This building will contain two parking spaces (abutting Mt. Pleasant Road) and one garden suite (to occupy both levels). | Approved | |
| 2024-06-27 | Zoning review24 171400 ZAP | No description on file | Application On Hold | |
| 2023-06-30 | Building permit22 199965 | Proposal to demolish the existing 2 storey SFD-detached dwelling. | Closed | |
| 2022-03-02 | Minor varianceA0986/21TEY | To construct a new three-storey detached dwelling. | Approved | |
| 2021-04-19 | Zoning review21 142949 ZZC | No description on file | Closed | |
| 2021-01-08 | Zoning review21 102089 ZPR | No description on file | Closed | |
| 2016-09-07 | Minor varianceA0503/16TEY | To construct a new three-storey detached dwelling with rear first and third-storey decks. | Withdrawn | |
| 2015-06-22 | Zoning review15 178474 ZZC | No description on file | Cancelled |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(977)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(977)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Yonge-St. Clair Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(977)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: garden suite
- Multiplex up to 6 units: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (u4; d0.6) (x977)
- Height limit
- 12 m
- Corner lot
- Yes, also on Mount Pleasant Rd
- Public lane
- None
- New house permit
- 2025
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 0 development applications within 300 m in 10 years, none open
- 7 suite and multiplex permits within 300 m in 10 years
- 47 minor variance decisions within 300 m, 94% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 1 of 6 categories
- Break and enter: 2.6 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Rosedale-Moore Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- St Clair StationNearest station14 min walk
- Mt Pleasant Rd at Heath St EastNearest TTC stop1 min walk
- Moore AveNearest cycling route3 min walk
- Our Lady of Perpetual Help Catholic Elementary SchoolSchool9 min walk
- Deer Park Jr & Sr Public SchoolSchool10 min walk
- Whitney Jr Public SchoolSchool12 min walk
- Sunnybrook SchoolSchool13 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.4
- Robberycity median 69.586.8
- Auto theftcity median 192.6199.6
- Theft over $5,000city median 46.165.1
- Break and entercity median 172.8455.6
- Theft from vehiclescity median 188.1182.2
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist