Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2341 Queen St E
2341 Queen St E is on a 10.5 m by 25 m lot on Queen St E in The Beaches. This lot is not covered by Toronto's city-wide zoning by-law 569-2013, so a by-law of the former city or borough most likely still applies. Toronto Building can confirm which one. The lot also fronts Balsam Ave.
The City has 16 records on this lot since 1998. That is more than at 99% of Toronto houses. In 2009, a building permit was filed: "Proposal to demolish part of existing attached garage at rear, deck on existing roof at rear, and reconstruct portion of rear stair of 4 unit building. see pal…". Status: inspection. In 2006, a Committee of Adjustment application was filed: "The applicant is seeking relief from the provisions of zoning by-law no. 438-86, as amended, in order to maintain the existing apartment building on the front…". Status: closed. In 2005, a building permit was filed: "Proposed severance of existing lot to create 3 new lots". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Within 300 m, the Committee of Adjustment decided 56 minor variance applications in the last 10 years and approved 79%. The nearest TTC stop is Queen St East at Beech Ave, a 3-minute walk.
Summary
What the City's records show on this house
- Building permit open since 2009ModerateFree check
- Zoning not in By-law 569-2013Moderate
- 2 City trees in front of this lotLowFree check
- 4 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
2 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2009
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2009
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
4 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
16 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2021-01-18 | Building permit14 236136 | Rev 02 - TO CONVERT GARAGE PARKING SPACE TO STORAGE, AND CONSTRUCT SECOND FLOOR REAR BALCONY.REVISION 01 - to amend the existing steel structure interiorProposal to reconstruct existing front yard, front stairs and access to entrances. Also, proposed new front canopy. Exisitng lower level commercial space with three dwelling units above. See also 09-117043 for previous works on property. | Cancelled | |
| 2020-02-05 | Zoning review20 112570 ZZU | No description on file | Closed | |
| 2018-09-11 | Zoning review18 223629 ZPR | No description on file | Closed | |
| 2014-07-14 | Zoning review14 190000 ZZC | No description on file | Closed | |
| 2014-07-08 | Zoning review14 186536 ZZC | No description on file | Cancelled | |
| 2009-04-06 | Building permit09 117043 | Proposal to demolish part of existing attached garage at rear, deck on existing roof at rear, and reconstruct portion of rear stair of 4 unit building. See PAL 08 205251 | Inspection | |
| 2008-09-19 | Zoning review08 205251 ZAL | No description on file | Closed | |
| 2006-12-06 | Consent (lot split)B0075/05TEY | The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, in order to maintain the existing apartment building (4 units) on the front portion of the site, including the construction of a rear three storey fire escape/balconies and on the rear portion of the site construct a three storey detached house with an at grade integral garage fronting and gaining access off of Balsam Avenue. Two motor vehicle parking spaces will be provided at the rear of the apartment building. All as shown more particularily on the plans attached to and forming a part of the file at the office of the Committee of Adjustment. An accompanying consent application, B0075/05TEY, to create two new lot parcels for the existing building and for the detached house has been filed with the Committee of Adjustment. Note: the proposed detached house complies with the requirements of the Zoning By-law. | Approved | |
| 2006-12-06 | Minor varianceA0480/05TEY | The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, in order to maintain the existing apartment building on the front portion of the site and construct a pair of three storey semi-detached houses on the rear portion of the site. Two motor vehicle parking spaces will be provided at the rear of the apartment building. Also proposed is to construct a third floor addition to the west side of the apartment building. Each of the proposed semi-detached houses will contain a gross floor area of 217.32 square metres and will be provided with a front integral garage gaining its access from Balsam Avenue. All as shown more particularily on the plans attached to and forming a part of the file at the office of the Committee of Adjustment. An accompanying consent application, B0075/05TEY, to create three new lot parcels for the existing building and for each semi-detached house has been filed with the Committee of Adjustment. | Withdrawn | |
| 2006-12-06 | Minor varianceA0479/05TEY | The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, in order to maintain the existing apartment building on the front portion of the site and construct a pair of three storey semi-detached houses on the rear portion of the site. Two motor vehicle parking spaces will be provided at the rear of the apartment building. Also proposed is to construct a third floor addition to the west side of the apartment building. Each of the proposed semi-detached houses will contain a gross floor area of 217.32 square metres and will be provided with a front integral garage gaining its access from Balsam Avenue. All as shown more particularily on the plans attached to and forming a part of the file at the office of the Committee of Adjustment. An accompanying consent application, B0075/05TEY, to create three new lot parcels for the existing building and for each semi-detached house has been filed with the Committee of Adjustment. | Withdrawn | |
| 2006-12-06 | Minor varianceA0477/05TEY | The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, in order to maintain the existing apartment building on the front portion of the site and construct a pair of three storey semi-detached houses on the rear portion of the site. Two motor vehicle parking spaces will be provided at the rear of the apartment building. Also proposed is to construct a third floor addition to the west side of the apartment building. Each of the proposed semi-detached houses will contain a gross floor area of 217.32 square metres and will be provided with a front integral garage gaining access from Balsam Avenue. All as shown more particularily on the plans attached to and forming a part of the file at the office of the Committee of Adjustment. An accompanying consent application, B0075/05TEY, to create three new lot parcels for the existing building and for each semi-detached house has been filed with the Committee of Adjustment. | Approved | |
| 2006-07-28 | Zoning review06 161615 ZPR | No description on file | Closed | |
| 2005-04-11 | Zoning review05 122027 ZPR | No description on file | Closed | |
| 2005-04-11 | Building permit05 122024 | Proposed severance of existing lot to create 3 new lots | Closed | |
| 2004-10-05 | Zoning review04 179254 000 | No description on file | Closed | |
| 1998-02-25 | Zoning review98 025743 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Zoning not in By-law 569-2013
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Zoning not in By-law 569-2013
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
2 City trees in front of this lot
LowFor later, once you own itSee the tree permit check for this house
What the record shows, what it means for you and what to doUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- —
- Height limit
- —
- Corner lot
- Yes, also on Balsam Ave
- Public lane
- None
- House footprint
- 180 m²
- Back yard
- 0 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- 13 suite and multiplex permits within 300 m in 10 years
- 56 minor variance decisions within 300 m, 79% approved
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
The Beaches neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Danforth GO StationNearest station33 min walk
- Queen St East at Beech AveNearest TTC stop3 min walk
- Balsam AveNearest cycling route1 min walk
- St Denis Catholic Elementary SchoolSchool2 min walk
- Avalon Children's Montessori SchoolSchool4 min walk
- The Cole AcademySchool6 min walk
- The Claremont SchoolSchool6 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3525.6
- Robberycity median 69.525.2
- Auto theftcity median 192.6164
- Theft over $5,000city median 46.150.5
- Break and entercity median 172.8151.4
- Theft from vehiclescity median 188.1243.9
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist