HousePrecheckCheck an address

229 Church StDowntown Yonge East, Toronto · City records before you offer

Also 105 Dundas St E, 111 Dundas St E, 229 Church St

Commercial residential · CR 3.0 (c2.0; r3.0) SS1 (x138)6.1 × 27.4 m159 m²on Church Stcorner, also on Dundas St E

1 thing to check before you offer, including work or applications in progress
N10 m
6.1 m frontage27.4 m deep

Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources

This house at a glance

Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.

About 229 Church St

229 Church St is on a 6.1 m by 27.4 m lot on Church St in Downtown Yonge East. The zoning is CR. A site-specific exception, 900.11.10(138), changes some of the usual rules for this address. The lot also fronts Dundas St E.

The City has 29 records on this lot since 1981. That is more than at 99% of Toronto houses. In 2026, a building permit was filed: "Interior alteration to suite for proposed restaurant, interior partition of walls, plumbing,hvac duct work and sprinkler modificationsoccupant load: 10 persons…". Status: inspection. In 2025, a building permit was filed: "Interior alteration to suite new proposed restaurant, interior partition of walls, plumbing,hvac duct work and sprinkler modifications. " burrito boyz"". Status: inspection. In 2024, a building permit was filed: "Rev 01 - revision to correct the addressproposed interior alterations for fit up of existing condo retail space". Status: closed. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.

Within 300 m, 10 development applications are open (the tallest up to 53 storeys). TMU station is a 5-minute walk, and the lot is in its Major Transit Station Area.

Summary

What the City's records show on this house

  • Work or applications in progressModerateFree check
  • Site-specific exception 900.11.10(138)Moderate
  • 10 development applications open within 300 mLowFree check
  • Priority retail street: Church Street, Dundas Street EastLow
  • Downtown Plan Secondary PlanLow

Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.

Unlock the full report

15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.

What to find out first

1 thing to check before you offer.

What to find out before an offer, the steps to take, what each costs and how long it takesUnlock

A few questions

Open City files

How much in the City's records needs answers before an offer

  • Work or applications in progress
  • No open orders or by-law investigations
  • No permits left open for years

What this part means for this house, in plain EnglishUnlock

  1. Work or applications in progress

    ModerateCheck before you offer

    What the record shows, what it means for you and what to doUnlock

City files on this lot

29 records on file, more than at 99% of Toronto houses (median 0 records).

DateRecordAs the City filed itIn plain wordsStatus
2026-05-06Building permit
26 154821
INTERIOR ALTERATION TO SUITE FOR PROPOSED RESTAURANT, INTERIOR PARTITION OF WALLS, PLUMBING,HVAC DUCT WORK AND SPRINKLER MODIFICATIONSOCCUPANT LOAD: 10 PERSONS (8 PATRONS & 2 STAFF)Inspection
2025-09-10Building permit
25 216961
Interior alteration to suite new proposed restaurant, interior partition of walls, plumbing,hvac duct work and sprinkler modifications. " Burrito Boyz"Inspection
2024-10-21Building permit
23 228926
REV 01 - Revision to correct the addressProposed interior alterations for fit up of existing condo retail space.Closed
2023-12-06Building permit
23 230572
Proposal interior alterations to suite 3 for new proposed restaurant, interior partition of walls, plumbing, hvac, duct work and sprinkler modificationsClosed
2019-07-25Development application
19 195499 STE 13 CD
Draft Plan of Condominium for a 51-storey building containing 604 units and 5 levels of below grade parking containing 142 parking spacesClosed
2018-08-07Building permit
17 269771
Proposal to demolish existing 2-storey mixed use building. See 17 269693 NB for the new condo (mixed-use) development and 17 194656 STE.Closed
2018-06-11Zoning review
17 194656 PSP
No description on fileClosed
2017-07-07Development application
17 194656 STE 27 SA
Application to facilitate the development of a 52 storey building containing 39,595m2 of residential uses and 506m2 of street-related retail uses. A total of 602 dwelling units are proposed.Closed
2014-12-17Development application
14 265043 STE 27 OZ
Proposed 52 Storey residential tower with ground floor retail commercial space.Closed
2014-07-03Zoning review
14 183832 LTO
No description on fileClosed
2013-07-29Zoning review
13 212307 LTO
No description on fileClosed
2013-03-19Building permit
13 112861
103 Dundas St E. No seats.Proposal for interior alterations to existing restaurant - "Aida Sandwich Shop".Closed
2012-06-08Zoning review
12 189382 LTO
No description on fileClosed
2010-04-20Building permit
10 146985
Minor structural alterations for new kitchen exaust to roof. See Mech permit 10 121497 & -01.Closed
2010-04-08Building permit
10 121497
Revision to change direction of kitchen exhaust.Closed
2010-03-01Building permit
10 121503
Proposal to install new kitchen fixtures and grease interceptor. See permit 10-121497 MS.Closed
2009-12-07Zoning review
09 194343 ZPU
No description on fileClosed
2008-09-05Building permit
08 195966
Convenience address for 101 Dundas St E. Interior fit out of new 'Bubble Tea' take out. GF UnitClosed
2008-05-05Zoning review
08 155040 LPR
No description on fileClosed
2008-02-12Building permit
08 110965
Proposa to install 1 hand washing station on main fl.Closed
2008-02-05Building permit
08 106664
Proposal to replace existing kitchen exhaust unit in existing restaurant (+/- 10 seats).Closed
2007-06-22Building permit
07 235741
Make fire damage repairs to roof structure & fire seperation between 227 & 229 Church St.Closed
2003-08-20Zoning review
03 167937 LTO
No description on fileClosed
2002-05-09Zoning review
02 134358 ZSV
No description on fileClosed
2001-12-11Zoning review
01 201643 ZPR
No description on fileClosed
1999-05-25Zoning review
99 022419 LTO
No description on fileClosed
1993-04-21Zoning review
93 025001 LTO
No description on fileClosed
1988-01-26Zoning review
88 030049 LTO
No description on fileClosed
1981-11-10Zoning review
81 030853 LTO
No description on fileClosed
Minor

Restrictions

How much heritage, nature and site-specific rules limit changes to the house

  • Site-specific exception 900.11.10(138)
  • Priority retail street: Church Street, Dundas Street East
  • No heritage listing or designation

What this part means for this house, in plain EnglishUnlock

  1. Site-specific exception 900.11.10(138)

    ModerateCheck if it applies

    What the record shows, what it means for you and what to doUnlock

  2. Priority retail street: Church Street, Dundas Street East

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

  3. Downtown Plan Secondary Plan

    LowFor later, once you own it

    What the record shows, what it means for you and what to doUnlock

If you want to change or build

What the site-specific rules mean for an addition, a garage or a rebuild.

Site-specific exception 900.11.10(138)

What the exception changes for this address, rule by ruleUnlock

Not on this lot

Flood and erosion rules

How much of the lot lies in the areas TRCA regulates for flooding and erosion

  • Outside the areas TRCA regulates

From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.

What this part means for this house, in plain EnglishUnlock

Little left to add

Build potential

How much more the rules allow on this lot, beyond what is on record

What this part means for this house, in plain EnglishUnlock

The lot and what the rules allow

N10 m
6.1 m frontage27.4 m deepon Church St
Zone
CR 3.0 (c2.0; r3.0) SS1 (x138)
Height limit
18 m
Corner lot
Yes, also on Dundas St E
Public lane
None
House footprint
91 m²
Back yard
0 m
Buildings on the lot
2

House and yards from the City's 3D Massing; a survey gives exact figures.

What you can build

    Why, measured on this lot, and the most you could buildUnlock

    Busy

    Building nearby

    How much neighbours are building and applying to change within 300 m

    • 10 development applications open within 300 m, up to 53 storeys
    • In the Dundas station area
    • 13 suite and multiplex permits within 300 m in 10 years

    What this part means for this house, in plain EnglishUnlock

    1. 10 development applications open within 300 m

      LowCheck if it applies

      What the record shows, what it means for you and what to doUnlock

    What the City allowed next door

    Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.

    What neighbours have built and changed around you, and how the City decidedUnlock

    Crime well above median

    Area safety

    Police-reported crime in the neighbourhood against the Toronto median

    • Lower than the Toronto median in 1 of 7 categories
    • Assault: 3.7 times the Toronto median
    • Theft over $5,000: 2.2 times the Toronto median
    • Theft from vehicles: 2.1 times the Toronto median
    • Robbery: 2.1 times the Toronto median
    • Break and enter: 1.6 times the Toronto median

    Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.

    What this part means for this house, in plain EnglishUnlock

    Downtown Yonge East neighbourhood

    About the area, not this house.

    2021 Census, against the median Toronto neighbourhood

    Median household income (2020)$69,500median $84,500
    Households that own their home36%median 54%
    Population (2021)17,700median 16,813
    Homes built in 1960 or before7%median 29%
    Homes needing major repairs4%median 7%

    Getting around and schools

    • TMU StationNearest station5 min walk
    • Dundas St East at Church StNearest TTC stop1 min walk
    • Shuter StNearest cycling route3 min walk
    • St Michael's Choir School - SecondarySchool2 min walk
    • St Michael's Choir School - ElementarySchool2 min walk
    • Toronto Metropolitan University - School of Interior DesignSchool2 min walk
    • Tmu - Heidelberg Centre School of Graphic Comm'ns MgmtSchool3 min walk

    Police-reported crime, 2025, per 100,000 people

    • Assaultcity median 636.32360.8
    • Robberycity median 69.5143.3
    • Shootingscity median 10.511.9
    • Auto theftcity median 192.675.6
    • Theft over $5,000city median 46.199.5
    • Break and entercity median 172.8274.7
    • Theft from vehiclescity median 188.1390.1

    More about Downtown Yonge East

    Ready emails

    Copy and send as they are.

    2 questions for the seller and your lawyer, written outUnlock

    What we checked, and what the City's records don't cover

    We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.

    See every source and when we loaded it · Pre-offer checklist

    Something here not right?

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Scores calibrated on Toronto house lots on 2026-10-19; prices and sources checked on 2026-10-06. Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limits © Toronto and Region Conservation Authority.

    Full pre-offer report · 229 Church St

    1 thing to check at 229 Church St before you offer

    • Work or applications in progressModerate
    • Site-specific exception 900.11.10(138)Moderate
    • 10 development applications open within 300 mLow
    • Priority retail street: Church Street, Dundas Street EastLow
    • and 1 more

    The report explains what each one can cost you on this house and what to ask the seller or the City before you offer.

    $29 CAD one time · opens right away

    See a sample report

    Full refund within 30 days if the report left out or misstated a City record on the lot. Refund policy

    Also in the report

    • A PDF to forward to your agent and lawyer
    • What you can build on this lot, measured on it
    • Every line linked to the City record it comes from
    • 15 sets of public records, already searched and read for you
    • A clear list of the 3 steps to take before you offer, so nothing slips
    • What each of the 5 findings can cost you or stop you doing, in plain English
    • A two-minute summary of this house, and what to find out first before you offer
    • What the City allowed your neighbours, a guide if you plan to build or apply for something similar
    • We watch this address for 90 days. If anything changes in the City's records, we email you the same day
    • A short summary of each part: City files, restrictions, flood and erosion, build potential, building nearby, area safety

    By paying you agree to the terms of use and the refund policy. Payment by Stripe. The report opens right after payment, and we email you a link to it; your account is made from the email you pay with. A screening of public records, not a legal opinion or a home inspection.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.