Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2233 Gerrard St E
2233 Gerrard St E is on a 18.3 m by 61.1 m lot on Gerrard St E in East End-Danforth. The zoning is R. A site-specific exception, 900.2.10(815), changes some of the usual rules for this address.
The City has 13 records on this lot since 2004. That is more than at 99% of Toronto houses. In 2022, a Committee of Adjustment application was filed: "To construct a new four-storey apartment building with a total of 27 residential units. the lots will merge on title and the existing dwellings will be…". Status: closed. In 2009, a building permit was filed: "Plumbing - permit for second floor addition at rear of existing sfd detached house - pleae see 09 158315 br and 09 158384 wnp for br and work no permit folders". Status: inspection. In 2006, a building permit was filed: "Construct ground floor addition; create partywall with 2231 gerrard st. e". Status: inspection. 2 open permits mean the City has not closed the files. Ask the seller whether the work was finished and passed its final inspection.
No development applications are open within 300 m. Danforth GO station is a 8-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- 2 building permits open, the oldest since 2006ModerateFree check
- Site-specific exception 900.2.10(815)Moderate
- 2 by-law investigations closed in the last two yearsLow
- No permit for a second unit on fileLowFree check
- 2 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
What the rules allow here: Multiplex up to 6 units · Garden suite
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- 2 building permits open, the oldest since 2006
- 2 by-law investigations closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
2 building permits open, the oldest since 2006
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
2 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
No permit for a second unit on file
LowCheck if it appliesSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
13 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-09-10 | By-law investigation25 258014 PRS 00 IV | Order Issued Property Standards | Closed | |
| 2025-09-10 | By-law investigation25 223452 PRS 00 IR | Property Standards | Closed | |
| 2022-10-19 | Minor varianceA1365/21TEY | To construct a new four-storey apartment building with a total of 27 residential units. The lots will merge on title and the existing dwellings will be demolished. | Approved | |
| 2022-02-04 | Zoning review22 102990 PSP | No description on file | Closed | |
| 2021-07-02 | Zoning review21 178820 ZPR | No description on file | Closed | |
| 2017-10-13 | Zoning review17 247063 ZPR | No description on file | Closed | |
| 2009-11-06 | Building permit09 167048 | Plumbing - Permit for second floor addition at rear of existing SFD detached house - pleae see 09 158315 BR and 09 158384 WNP for BR and Work no permit folders. | Inspection | |
| 2007-07-09 | Building permit07 240993 | Refusal Notice Proposal to construct a new 3 sty 16 unit condo. See Demo permits for 2231 Gerrard St E (07 240969), 2233 Gerrard St E (07 240977), and 2235 Gerrard St E (07 240986) | Cancelled | |
| 2007-07-09 | Building permit07 240977 | Proposal to demolish existing 2 sty SFD. Also see demo permits for 2231 & 2235 Gerrard St E (07 240969 & 07 240986) and BLD for new 3 sty 16 unit condo (07 240993) | Cancelled | |
| 2006-02-13 | Building permit05 209485 | Construct ground floor addition; create partywall with 2231 Gerrard St. E. | Inspection | |
| 2005-07-06 | Consent (lot split)B0056/05TEY | No description on file | Pending | |
| 2005-06-10 | Zoning review05 141956 PSP | No description on file | Closed | |
| 2004-12-30 | Zoning review04 204159 ZPR | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.2.10(815)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.2.10(815)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.2.10(815)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- Multiplex up to 6 units: likely fits
- Garden suite: likely fits
- Secondary suite: likely fits
What this part means for this house, in plain EnglishUnlock
Multiplex up to 6 units
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
Garden suite
LowFor later, once you own itSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d1.0) (x815)
- Height limit
- 13 m
- Corner lot
- No
- Public lane
- None
- New house permit
- None since 2000
- House footprint
- 73 m²
- Back yard
- 43.7 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application within 300 m in 10 years, none open
- In the Danforth GO station area
- 7 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 4 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
East End-Danforth neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Danforth GO StationNearest station8 min walk
- Gerrard St East at Osborne AveNearest TTC stop1 min walk
- Main StNearest cycling route3 min walk
- Beaches Alternative Jr & Kimberley JrSchool3 min walk
- Malvern Collegiate InstituteSchool7 min walk
- St John Catholic Elementary SchoolSchool8 min walk
- Notre Dame Catholic High SchoolSchool9 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3796.2
- Robberycity median 69.551.8
- Shootingscity median 10.54
- Auto theftcity median 192.6147.3
- Theft over $5,000city median 46.139.8
- Break and entercity median 172.8195.1
- Theft from vehiclescity median 188.1195.1
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist