Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2213 Bloor St W
2213 Bloor St W is on a 6.5 m by 30 m lot on Bloor St W in High Park-Swansea. The zoning is CR. A site-specific exception, 900.11.10(1978), changes some of the usual rules for this address.
The City has 15 records on this lot since 1985. That is more than at 99% of Toronto houses. In 2016, a building permit was filed: "Proposal to install a 3/4 inch backflow prevention device". Status: closed. In 2014, a building permit was filed: "Revisions as per bubbled areas on plansproposal to construct a 2 storey rear addition and renovations to existing two storey building and provide opening to…". Status: revision issued. In 2013, a Committee of Adjustment application was filed: "To construct a two-storey side and rear addition to the existing two-storey retail/office building". Status: closed. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 1 development application is open (the tallest up to 8 storeys). Runnymede station is a 2-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2014ModerateFree check
- Site-specific exception 900.11.10(1978)Moderate
- 1 development application open within 300 mLowFree check
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2014
- No open orders or by-law investigations
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
Building permit open since 2014
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Building permits before buyingWhat this means: Committee of Adjustment
City files on this lot
15 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2016-08-25 | Building permit16 209568 | Proposal to install a 3/4 inch backflow prevention device. | Closed | |
| 2014-06-05 | Building permit13 159016 | Revisions as per bubbled areas on PlansProposal to construct a 2 storey rear addition and renovations to existing two storey building and provide opening to combine with the building at 2209 Bloor St W. | Revision Issued | |
| 2013-09-26 | Minor varianceA236/13EYK | To construct a two-storey side and rear addition to the existing two-storey retail/office building. | Approved | |
| 2013-08-14 | Zoning review13 220759 ZPR | No description on file | Closed | |
| 2013-03-20 | Zoning review13 137737 ZZC | No description on file | Closed | |
| 2010-11-15 | Zoning review10 296494 LTO | No description on file | Closed | |
| 2004-04-27 | Zoning review04 128457 LTO | No description on file | Closed | |
| 2004-01-08 | Building permit04 100983 | Change of use with construction from Retail store to hair Saloon at second floor. | Closed | |
| 2003-11-06 | Building permit03 188606 | HVAC - new roof top unit | Closed | |
| 2000-12-20 | Building permit00 359458 | supply and install h.v.a.c. system. see bp#00-348333 (card printed) | Closed | |
| 2000-12-20 | Building permit00 348347 | install fixtures in basement - 1 w.c., 1 w.b., 1 shower. see bp# 00-348333 issue with building permit. | Closed | |
| 2000-12-20 | Building permit00 348333 | make interior alterations to all floors, also alter storefront. (see encroachment application) (card printed) | Closed | |
| 1993-12-02 | Zoning review93 025842 LTO | No description on file | Closed | |
| 1991-07-11 | Zoning review91 026702 LTO | No description on file | Closed | |
| 1985-01-08 | Zoning review85 026300 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(1978)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(1978)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1978)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.5 (c2.0; r2.0) SS2 (x1978)
- Height limit
- 14 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 129 m²
- Back yard
- 4 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 8 storeys
- In the Runnymede station area
- 6 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 6 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
High Park-Swansea neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Runnymede StationNearest station2 min walk
- Runnymede Rd at Bloor St West South SideNearest TTC stop1 min walk
- Bloor St WNearest cycling route1 min walk
- Humberside Montessori SchoolSchool1 min walk
- Erudite Elementary SchoolSchool6 min walk
- Runnymede Jr & Sr Public SchoolSchool9 min walk
- Ursula Franklin AcademySchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3465.8
- Robberycity median 69.546.6
- Shootingscity median 10.57.8
- Auto theftcity median 192.689.3
- Theft over $5,000city median 46.123.3
- Break and entercity median 172.8229
- Theft from vehiclescity median 188.1128.1
Ready emails
Copy and send as they are.
2 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist