HousePrecheckCheck an address

220 Davisville AveToronto · zoning, lot size and permit records

Open space · OR135.0 × 203.6 m26,496 m²on Acacia Rdcorner, also on Davisville Ave

Not a home

June Rowlands Park

The City of Toronto's real estate inventory lists June Rowlands Park here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 11 183695 (Permit to construct new gazebo in City of Toronto Park, 2011, status Inspection); 09 165350 (Water and sanitary service for new splash pad located at Davisville Park. The new spash..., 2009, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 13 storeysNew buildings may go up around here in the next years. More change nearby than at 96% of Toronto houses.
N50 m
135.0 m frontage203.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Cultural Heritage Evaluation Report required

    Needs a closer look

    This property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.

    What it means. Plans to tear down or rebuild will need a heritage evaluation first.

    How to confirm. Heritage Planning at the City confirms the status. Details

    Official Plan Amendment 720
  • 2 building permits open, the oldest since 2009

    Needs a closer look

    Still open in the City's records: 11 183695 (Permit to construct new gazebo in City of Toronto Park, 2011, status Inspection); 09 165350 (Water and sanitary service for new splash pad located at Davisville Park. The new spash..., 2009, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • By-law investigation26 259845 ELS 00 IRClosed

    Election Signs

    Oct 24, 2026 · 220 DAVISVILLE AVE
  • By-law investigation26 248894 ELS 00 IRClosed

    Election Signs

    Oct 3, 2026 · 220 DAVISVILLE AVE
  • Building permit17 237685Closed

    Proposed erection of a temporary tent (30'x80') structure to be erected on .09.29.2017 and dismantle date will be 10.02.2017.

    Sep 26, 2017 · 220 DAVISVILLE AVE
  • Building permit11 183695Inspection

    Permit to construct new gazebo in City of Toronto Park.

    Jun 9, 2011 · 220 DAVISVILLE AVE
  • Building permit09 165350Inspection

    Water and sanitary service for new splash pad located at Davisville Park. The new spash pad will be replacing the existing wading pool.

    Oct 14, 2009 · 220 DAVISVILLE AVE

Lot facts

Area
26,496 m²
Frontage
135 m
Depth
203.6 m
Street
Acacia Rd
Corner lot
Yes, also on Davisville Ave203.6 m along it
Public lane
None
House footprint
329 m²roof up to 13 m
Back yard
78.9 mhouse to rear lot line
Side yards
5.9 m and 108.3 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
9 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone OR (Open Space Recreation). Chapter 90, section 90.30 of the by-law. Source
  • 32 City trees in front of this lot. The City's street tree inventory lists 32 trees at this address: maple, norway (68 cm), maple, norway (65 cm), maple, norway (65 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
96%26 of 27 decisions
Garden suite permits
3
Laneway suite permits
2
Multiplex permits
9
Development applications
11

Within 300 m, last 10 years. 14 suite and multiplex permits: more than at 81% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever the property into two stratified lots and to create new easements/rights-of-way. Also, to maintain existing easements/rights-of-way.

    265 BALLIOL ST · Dec 2, 2026 · 221 m away
  • Building permit

    Proposed interior tenant fit-out to an existing 3rd-floor office space.

    477 MOUNT PLEASANT RD · Nov 25, 2026 · 163 m away
  • Zoning review

    Not Started

    565 MOUNT PLEASANT RD · Nov 18, 2026 · 292 m away
  • Building permit

    Proposal for interior alterations to floor 4, corridor & demising walls.

    477 MOUNT PLEASANT RD · Nov 18, 2026 · 163 m away
  • Building permit

    Proposed interior alterations to ground, second, third, fourth and fifth floors for elementray school

    477 MOUNT PLEASANT RD · Nov 12, 2026 · 163 m away
  • Building permit

    Installation of two mag-locks and associated equipment on exit doors serving the basement.

    268 MERTON ST · Nov 10, 2026 · 292 m away
  • Minor variancePending

    To construct a new three-storey detached dwelling (duplex) with a front integral garage, a rear ground floor walkout, a front second floor porch with a canopy and stairs, a rear second floor deck with stairs and a rear third floor balcony. Also, to construct a one-storey ancillary building (shed) in the rear yard. There will be a total of two residential dwelling units on this lot.

    136 BELSIZE DR · Oct 29, 2026 · 207 m away
  • Building permit

    An alternative solution is proposed to address exiting from a portion of the ground floor in the building to be located at 289-299 Balliol Street, Toronto, ON. This noted portion served by a single exit is classified as a Group F-3 space with an area of approximately 160.1 sqm.

    289 BALLIOL ST · Oct 16, 2026 · 211 m away
  • Minor varianceApproved

    To construct a new detached dwelling with a rear deck. NOTE: This application was previously deferred at the Committee of Adjustment hearing on August 20, 2026.

    369 MILLWOOD RD · Oct 15, 2026 · 276 m away
  • Building permit

    1 wall sign**PIZZA NELL**

    521 MOUNT PLEASANT RD · Oct 14, 2026 · 178 m away

Neighbourhood: South Eglinton-Davisville

About the area around the lot, not the lot itself.

Nearest station
Davisville Station12 min walk
Nearest TTC stop
Davisville Ave at Mt Pleasant Rd West Side2 min walk
Nearest cycling route
Kay Gardiner Beltline TrlMulti-Use Trail, 6 min walk
Nearest traffic count
3,798 vehicles in 14 hAcacia Rd / Millwood Rd (South), 120 m away, Feb 4, 2026
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
June Rowlands Park1 min walk
Mount Pleasant Parkette2 min walk
Glebe Manor Square3 min walk

Schools within 1 km

  • TORONTO PREP SCHOOL Private 3 min walk
  • GREENWOOD COLLEGE SCHOOL Private 3 min walk
  • MANOR MONTESSORI - DE SAVERY SITE Private 5 min walk
  • HODGSON MIDDLE SCHOOL English Public 5 min walk
  • SUNNYBROOK SCHOOL Private 9 min walk
  • DAVISVILLE & SPECTRUM SCHOOL English Public 9 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth Eglinton-DavisvilleMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home30%54%
Population (2021)22,73516,813
Homes built in 1960 or before11%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth Eglinton-DavisvilleCity median
Assault436636.3
Robbery24.269.5
Auto theft58.8192.6
Theft over $5,00020.846.1
Break and enter128172.8
Theft from vehicles100.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.