Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 2141 Bloor St W
2141 Bloor St W is on a 28.4 m by 40 m lot on Bloor St W in High Park-Swansea. The zoning is CR. A site-specific exception, 900.11.10(1978), changes some of the usual rules for this address. 68% of the lot is in the area TRCA regulates for flooding and erosion. Building or grading in that part usually needs a TRCA permit. 41% of the lot is under the City's ravine and natural feature protection by-law, which limits tree removal and grading there.
The City has 4 records on this lot since 2001. That is more than at 88% of Toronto houses. In 2003, a building permit was filed: "Install 1 mag lock on exit door in basement (card printed)". Status: closed. In 2001, a building permit was filed: "Make alterations to portion of the first floor and basement for office and retail store purposes. also alter front elevation. survey approved (card printed)". Status: inspection. An open permit means the City has not closed the file. Ask the seller whether the work was finished and passed its final inspection.
Within 300 m, 1 development application is open (the tallest up to 8 storeys). Runnymede station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Building permit open since 2001ModerateFree check
- TRCA regulated area (68% of lot)ModerateFree check
- Cultural Heritage Evaluation Report requiredModerate
- Site-specific exception 900.11.10(1978)Moderate
- 2 by-law investigations closed in the last two yearsLow
- 1 development application open within 300 mLowFree check
- Ravine and natural feature protection (41% of lot)LowFree check
- Natural Heritage System (75% of lot)Low
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
3 things to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Building permit open since 2001
- 2 by-law investigations closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Building permit open since 2001
ModerateCheck before you offerSee the open permit check for this house
What the record shows, what it means for you and what to doUnlock
2 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
What this means: Building permits before buying
City files on this lot
4 records on file, more than at 88% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2025-12-24 | By-law investigation25 269716 PRS 00 IR | Property Standards | Closed | |
| 2025-12-11 | By-law investigation25 265466 PRS 00 IR | Property Standards | Closed | |
| 2003-01-23 | Building permit02 196116 | install 1 mag lock on exit door in basement (card printed) | Closed | |
| 2001-01-05 | Building permit00 351960 | Make alterations to portion of the first floor and basement for office and retail store purposes. Also alter front elevation. survey approved (card printed) | Inspection |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Cultural Heritage Evaluation Report required
- Ravine and natural feature protection (41% of lot)
What this part means for this house, in plain EnglishUnlock
Cultural Heritage Evaluation Report required
ModerateCheck before you offerWhat the record shows, what it means for you and what to doUnlock
Site-specific exception 900.11.10(1978)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Ravine and natural feature protection (41% of lot)
LowFor later, once you own itSee the ravine lot check for this house
What the record shows, what it means for you and what to doUnlock
Natural Heritage System (75% of lot)
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto Heritage RegisterWhat this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(1978)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- TRCA regulated area (68% of lot)
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
TRCA regulated area (68% of lot)
ModerateCheck before you offerSee the ravine lot check for this house
What the record shows, what it means for you and what to doUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.5 (c2.0; r2.0) SS2 (x1978)
- Height limit
- 14 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 440 m²
- Back yard
- 4.6 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 8 storeys
- In the Runnymede station area
- 3 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 6 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
High Park-Swansea neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Runnymede StationNearest station5 min walk
- Runnymede Station - Eastbound PlatformNearest TTC stop2 min walk
- Bloor St WNearest cycling route1 min walk
- Humberside Montessori SchoolSchool3 min walk
- Erudite Elementary SchoolSchool9 min walk
- Ursula Franklin AcademySchool10 min walk
- Runnymede Jr & Sr Public SchoolSchool10 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3465.8
- Robberycity median 69.546.6
- Shootingscity median 10.57.8
- Auto theftcity median 192.689.3
- Theft over $5,000city median 46.123.3
- Break and entercity median 172.8229
- Theft from vehiclescity median 188.1128.1
Ready emails
Copy and send as they are.
4 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist