214 Merton StToronto · zoning, lot size and permit records

Commercial residential · CR 2.0 (c2.0; r2.0) SS2 (x2495)18.5 × 37.6 m685 m²on Merton Stbacks onto Ln N Merton W Pailton Cres

Not a home

Land without a building

A demolition permit (22 239928, 2023) is on file and no permit for a new building: the land is probably empty or used for parking. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 22 139700 STE 12 SA (Site Plan Approval for a 40-storey mixed-use building having a non-residential gross fl..., 2022). Larger work can mean noise and trucks next door; read what each one is for.
  • 9 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: DavisvilleThe City plans more homes around the station: good for transit, and more building over time.
N20 m
18.5 m frontage37.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Cultural Heritage Evaluation Report required

    Needs a closer look

    This property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.

    What it means. Plans to tear down or rebuild will need a heritage evaluation first.

    How to confirm. Heritage Planning at the City confirms the status. Details

    Official Plan Amendment 720
  • Work or applications in progress

    Good to know

    Recent records on this lot: 22 139700 STE 12 SA (Site Plan Approval for a 40-storey mixed-use building having a non-residential gross fl..., 2022).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 9 development applications open within 300 m

    Good to know

    9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Zoning review22 139700 PSPClosed
    Jun 28, 2024 · 214 MERTON ST
  • Building permit22 239928Cancelleddemolition

    Proposed demolition of existing structure at 214 Merton St

    Jan 24, 2023 · 214 MERTON ST
  • Zoning review22 139701 POZClosed
    May 27, 2022 · 214 MERTON ST
  • Development application22 139701 STE 12 OZClosed

    Official Plan and Zoning By-law Amendment application to permit a 40-storey mixed use building with 434 residential units. Official Plan Amendment requested to grant relief from office replacement policy requirements of the Yonge-Eglinton Sedondary Plan. A 371.9-square-metre public park is proposed.

    Apr 28, 2022 · 218 MERTON ST · City file
  • Development application22 139700 STE 12 SAUnder Review

    Site Plan Approval for a 40-storey mixed-use building having a non-residential gross floor area of 347.1 square metres, and a residential gross floor area of 28,700 square metres. 434 residential dwelling units are proposed.

    Apr 28, 2022 · 218 MERTON ST · City file
  • Building permit16 191862Closed

    Proposal to install a 1 1/4 inch backflow prevention device.

    Aug 12, 2016 · 214 MERTON ST
  • Zoning review92 025427 LTOClosed
    Apr 23, 1992 · 214 MERTON ST
  • Zoning review84 026055 LTOClosed
    Jan 11, 1984 · 214 MERTON ST

Check before you build

  • Site-specific exception 900.11.10(2495)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2495)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category.

  2. Older by-law A

    Section 12(2) 270(a) of former City of Toronto By-law 438-86

7 parts for other addresses
  • B On 35 Merton St., former City of Toronto by-law 96-0053
  • C On the even numbered addresses of 64-84 Merton St., former City of Toronto by-laws 97-0523 and 97-0551
  • D On 71 Merton St., former City of Toronto by-law 496-77
  • E On 100 Merton St., former City of Toronto by-law 94-0579
  • F On the lands municipally known as 137 to 147 Merton St. in 1992, Section 12(1) 308 of former City of Toronto By-law 438-86
  • G On 119 Merton St., former City of Toronto by-laws 96-0055 and 97-0594
  • H On 195 Merton St., and 253 Merton St. City of Toronto by-law 358-00.
By-law 569-2013, Chapter 900

Lot facts

Area
685 m²
Frontage
18.5 m
Depth
37.6 m
Street
Merton St
Corner lot
No
Public lane
Ln N Merton W Pailton Cres, 18.1 m along it
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
21 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Davisville. The lot is inside the Davisville Major Transit Station Area approved by the Province (Site and Area Specific Policy 722). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 2.0 (c2.0; r2.0) SS2 (x2495) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%10 of 10 decisions
Garden suite permits
2
Laneway suite permits
0
Multiplex permits
0
Development applications
21

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing three-storey commercial building by constructing a front entrance accessible ramp, a complete fourth storey addition with a side (south) courtyard, and a staircase enclosure on the rooftop level. This building will contain medical office and personal service shop uses. There will be two accessible parking spaces, and one standard parking space provided on-site.

    522 MOUNT PLEASANT RD · Jan 14, 2026 · 491 m away
  • Minor varianceApproved

    To alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space.

    119 MERTON ST · Nov 19, 2025 · 231 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 39-2025(OLT)), for a new 31-storey residential building, by increasing the building height from 102.9 m to 104.6 m. This is currently being reviewed under Site Plan Control (File 20 21 234919 STE 12 SA). There will be a total of 273 residential dwelling units.

    289 BALLIOL ST · Jul 23, 2025 · 233 m away
  • Minor varianceApproved

    To alter the mezzanine levels within two adjacent dwelling units (units 1210 and 1216).

    119 MERTON ST · May 31, 2023 · 231 m away
  • Minor varianceApproved

    To alter the existing two-storey office building by constructing a third-storey addition.

    170 MERTON ST · Nov 4, 2015 · 92 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to sever the property into two stratified lots and to create new easements/rights-of-way. Also, to maintain existing easements/rights-of-way.

    265 BALLIOL ST · Dec 2, 2026 · 202 m away
  • Zoning review

    Not Started

    170 MERTON ST · Nov 20, 2026 · 92 m away
  • Building permit

    Installation of two mag-locks and associated equipment on exit doors serving the basement.

    268 MERTON ST · Nov 10, 2026 · 156 m away
  • Zoning review

    Closed

    119 MERTON ST · Nov 3, 2026 · 231 m away
  • Zoning review

    Notice Sent

    275 MERTON ST · Oct 27, 2026 · 175 m away
  • Building permit

    An alternative solution is proposed to address exiting from a portion of the ground floor in the building to be located at 289-299 Balliol Street, Toronto, ON. This noted portion served by a single exit is classified as a Group F-3 space with an area of approximately 160.1 sqm.

    289 BALLIOL ST · Oct 16, 2026 · 233 m away
  • Building permit

    Proposal to erect a temporary air supported structure on an existing tennis court area. Tent to be in place from October 13, 2026 to April 13, 2027

    185 BALLIOL ST · Oct 13, 2026 · 108 m away
  • Building permit

    Targeted waterproofing renewal at the parking garage roof slab, including localized concrete repairs.

    221 BALLIOL ST · Sep 11, 2026 · 86 m away
  • Building permit

    Proposed concrete repairs at balcony slabs, shear walls, columns, end walls, roof parapet, exposed building floor slab edges, and entrance canopy; Replacement of balcony guards; Targeted masonry repairs and installation of an elastomeric coating/paint for the exterior walls; General replacement of exterior joint sealants (excluding window and balcony door perimeter joints).

    265 BALLIOL ST · Aug 31, 2026 · 202 m away
  • Building permit

    standpipe risers located within the contiguous scissor stairs

    140 MERTON ST · Aug 28, 2026 · 149 m away

Neighbourhood: South Eglinton-Davisville

About the area around the lot, not the lot itself.

Nearest station
Davisville Station9 min walk
Nearest TTC stop
Davisville Ave at Acacia Rd3 min walk
Nearest cycling route
Kay Gardiner Beltline TrlMulti-Use Trail, 1 min walk
Nearest traffic count
5,774 vehicles in 8 hPailton Cres / Merton St, 90 m away, Dec 18, 2006
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
June Rowlands Park4 min walk
Mount Pleasant Parkette5 min walk

Schools within 1 km

  • GREENWOOD COLLEGE SCHOOL Private 6 min walk
  • DAVISVILLE & SPECTRUM SCHOOL English Public 7 min walk
  • TORONTO PREP SCHOOL Private 7 min walk
  • HODGSON MIDDLE SCHOOL English Public 9 min walk
  • MANOR MONTESSORI - DE SAVERY SITE Private 10 min walk
  • SUNNYBROOK SCHOOL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth Eglinton-DavisvilleMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home30%54%
Population (2021)22,73516,813
Homes built in 1960 or before11%29%
Homes needing major repairs3%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth Eglinton-DavisvilleCity median
Assault436636.3
Robbery24.269.5
Auto theft58.8192.6
Theft over $5,00020.846.1
Break and enter128172.8
Theft from vehicles100.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.